AMRUT Universe
AMRUT State Wise List of Grounded Projects
S.No. Project Title Project Type Project Cost
(in ₹ Cr.)
Milestone
1 Development of Marina Park SH: Providing and fixing Out Door gym equipments. Parks 0.1 Work Completed
2 Construction of stormwater drainage system starting from Shri.Mukunda house to Shri.Nagaraju house and Shri.Veeran house to diggi at GaracharmaTTI road at APWDpump house,Garacharma in Ward No.18(222m) Drainage 0.51 Work Completed
3 Construction of storm water drainage system starting from Shri. Kondalo house, Smti. Venketlaxmi house to Smti. Pushpa house to Shri. Maniandi house, Smti. Kamla kumara house back side of Masjid . Drainage 1.58 Work Completed
4 Construction of storm water drainage system starting from Shri. Palaniappan house, Shri. Nasir house, Shri. Kondal house (Majeed) Lord Shiv Temple (Honda showroom road side) and Dollygunjbasthi Drainage 0.29 Work Completed
5 Construction of major drain starting from Deepak coaching centre, Shri. Shivram house, Shri. ShakMohd. House, Shri Shakalam house to main road at Old Pahargoan, Ward No. 16(177.8 metre). Drainage 0.26 Work Completed
6 Construction & Renovation of drain from Smti. BeenaDey house, Smti, Satyawathi house to Shri Rakesh Ram house at Kirpanand colony, School Line Ward No. 16(247 metre). Drainage 0.17 Work Completed
7 Construction of major drain and covering slab starting from Shri. Udaykumar house to main road at Kirpanand colony, School Line Ward No. 16(300 metre). Drainage 0.3 Work Completed
8 Construction of major drain from Sekhar house to MazarPahad school, GEL Church, Nayagoan in Ward No. 12 (550 metre length). Drainage 0.3 Work Completed
9 Construction of major drain from Karamat Ali, Jbrahin house to Sakir house, NariyalBageecha Ward No. 11 (250 metre length). Drainage 0.61 Work Completed
10 Improvement of od water supply distrubution network at Happy & Navasakthi colony at Dollygung in Ward No-17(GI). Water Supply 0.09 Work Completed
11 Providing and laying of 100 mm dia DI pipe line and 80mm, 50mm & 65 mm dia GI branch pipe line form Indian Overseas Bank to shri. A.K singh house at Garacharma in Ward No.19. Water Supply 0.02 Work Completed
12 Providing and Laying of 65mm, 50 mm & 80mm dia GI branch pipe line from the existing 100mm dia CI main pipe line Shri. Sukumaran House to Shri. Pillai Babau house at Pathergudda in W ard No 19. Water Supply 0.01 Work Completed
13 Providing and laying 80mm, 65mm and 50mm GI pipe line from Shri. Raguvanshi Lall house to Shri. Asit Minj house at Dollygunj Shiv colony in ward No.17. Water Supply 0.01 Work Completed
14 Providing & Laying of 150mm dia DI pipe line from Circular tank to Rajaji Nagar to Shree Singh House in Ward No.18. Water Supply 0.31 Work Completed
15 Providing & Laying of 80mm & 50mm dia GI pipe line back side of Ganesh temple entire area at BathuBasthi in Ward No.24. Water Supply 0.04 Work Completed
16 Providing & Laying 80mm & 50mm dia GI pipe line for entire Doctor's Colony from N B Singh house to end of colony at Bathubasthi in Ward No.24. Water Supply 0.03 Work Completed
17 Providing & Laying of 150mm dia DI pipe line from Circular tank to Rajaji Nagar TO SBI ATM near Junction at Garacharma in Ward No.18. Water Supply 0.36 Work Completed
18 Construction of OHT at Govt. Primary Health Centre Dairy farm.(2,72,000.00 ltrs). Water Supply 0.33 Work Completed
19 Construction of 02 nos. Command tank at Ranchi Tekrey.(5,44,000.00 ltrs). Water Supply 0.44 Work Completed
20 Construction of 01 Nos Over Head Tank capacity 100000 litrs with staging height upto 10 mtrs including its delivery line (Inlet & Outlet) at New Pahargaon Command Tank. Water Supply 0.14 Work Completed
21 Improvement of Water Supply Distribution network at Andal basti,Prothrapur in Ward No-19(GI). Water Supply 0.03 Work Completed
22 Demolishing and dismantling of old CWR at School line as well as the same site construction of a new circular water Reservoir with 67,000 gallon(3,02,400 ltrs) ward no 16. Water Supply 0.24 Work Completed
23 Providing and laying of CI/DI pipeline for inter connection between OHT circular and rectangular tank as well as delivery line at Dairy Farm.9. Water Supply 0.1 Work Completed
24 Providing and laying of 100mm dia Gi main commercial pipe line from Shalimar Hotel to Islander Inn at Phoniex Bay in ward No. 6. Water Supply 0.21 Work Completed
25 Providing and laying of 200 mm Dia DI/CI pipe line for interconnection along with 200 mm Dia pipe line at Junglighat Puja Pandal to Prem Nagar Burning Ghat Ward No.7. Water Supply 0.17 Work Completed
26 Providing and Laying of 150mm & 200mm dia DI pipe line (Loading Line) from Range office Bathubasthi to CWR Pahargaon in Ward No.19 & 20 Water Supply 0.28 Work Completed
27 Providing & Laying of 100mm dia DI pipe line from Sree Durga Temple(Dollygunj) to Atam Pahad,Ram Nagar CWR at Atam Pahad in Ward No.18. Water Supply 0.23 Work Completed
28 Providing & Laying of 150mm dia DI pipe line from the existing 200mm dia CI line from Laxmi Motor to Honda Workshop at Garacharma in Ward No.19. Water Supply 0.22 Work Completed
29 Construction of Open Air gym station including installation of open air gym equipments at Ward No 2. Parks 0.09 Work Completed
30 Laying of 80mm & 50mm dia GI branch pipe line behind Divyam Talkies to shri.S.K Paul's house at Prothrapur in Ward No.23. Water Supply 0.02 Work Completed
31 Providing & Laying 80mm & 50mm dia GI branch pipe line near Shiv Mandir from Suresh Ram's House to Divyam Talkies parking place at Protthrapur in Ward No.23 Water Supply 0.02 Work Completed
32 Providing & Laying GI branch pipe line of 65mm & 50mm dia GI pipe line from Shri.Rama Rao House to Shri.Noor Mohammed house at Brijgunj in Ward No.22 Water Supply 0.01 Work Completed
33 Providing & Laying GI branch pipe line of 65mm & 50mm dia GI pipe line from Maria Bhavan's to Smti.Laxmi House at Bathubasthi in Ward No.23 Water Supply 0.02 Work Completed
34 Providing & Laying GI branch pipe line of 50mm dia GI pipe line from Maria Bhavan to Shri.A.Janagar's house at Bathu Basthi in Ward No.23 Water Supply 0.01 Work Completed
35 Providing & Laying GI branch pipe line of 65mm & 50mm dia new GI pipe line from Shri.Arvindo Mandal to Shri.Ganesh House at Prothrapur in Ward No.23 Water Supply 0.02 Work Completed
36 Providing & Laying GI branch pipe line of 65mm & 50mm dia new GI pipe line from near Shri.Narayan Prasad house to Shri.Charan house at Prothrapur in Ward No.23 Water Supply 0.02 Work Completed
37 Improvement of Water Supply Distribution system in Tsunami Shelter . Water Supply 0.02 Work Completed
38 Improvement of Water Supply Distribution system in Tsunami Shelter Camp No.II by replacement of old 32mm dia & 40mm dia branch line with new 50mm dia GI branch pipe line at Brookshsbad in Ward No.22 Water Supply 0.01 Work Completed
39 P/L G.I branch line of 80,50 mm from Atlanta point tank. Water Supply 0.02 Work Completed
40 Construction of new surface tank capacity 50,000 ltrs by dismantling old existing tank near Marine Hill Govt. Guest House at ward No.4. Water Supply 0.08 Work Completed
41 Contruction of 3,00,000 liter RCC sumps at New pahar gaon ward no.20. Water Supply 0.1 Work Completed
42 Construction of new surface tank capacity 80,000 ltrs dismantling old tank alongwith installing of pump near municipal shop. Water Supply 0.12 Work Completed
43 Providing and laying of 150 mm dia CI/DI Pipe line from Water tank to Bharat gas in ward No.20. Water Supply 0.1 Work Completed
44 Providing and laying of 100 mm CI line from Sun rise Bar to Carbin Cove area near Shri. Chootu house Water Supply 0.15 Work Completed
45 Providing and laying CI/DI pipeline for improvement of water supply distribution network at Lamba Line Telugu basthi from Ram Mandir to backside of Kali Mandir Ward No-09. Water Supply 0.06 Work Completed
46 Providing and laying CI/DI pipeline for improvement of water supply distribution network at Dairy Farm Japan Road to Trupathi Temple at Ward No- 14 Water Supply 0.09 Work Completed
47 Providing and laying CI/DI pipeline for improvement of water supply distribution network at Lamba Line Tamil Basthi Ward No-09. Water Supply 0.06 Work Completed
48 Providing and laying CI/DI pipeline for interconnecting between OHT, Circular and rectangular Tank as well delivery line at Ranchitekri, ward No-9 Water Supply 0.07 Work Completed
49 Providing and laying CI/DI pipeline for interconnecting between OHT, Circular and rectangular Tank as well delivery line at New Pahar Gaon ward No-20 Water Supply 0.04 Work Completed
50 Providing and laying of 150 mm dia CI/DI pipeline from Water Tank Dairy Farm to Ganesh Temple Junction , Ward No-14 Water Supply 0.08 Work Completed
51 Providing and laying 100 mm dia CI/DI pipe line from Dairy Farm Japan Road Shri. Laxmi Narayan House to Shri. CH Anand Rao House at Tsunami Line ward No-14. Water Supply 0.04 Work Completed
52 Providing and laying 150mm dia and 100 mm dia DI/CI pipeline from inter connection along with200mm and 100mm dia pipe line at Junglighat near LateChaman’shouse to near Teachers quarters in wardNo 6. Water Supply 0.04 Work Completed
53 Providing and laying CI/DI pipeline from Shri. Jacob Kutty House to new residential colony near BRAIT at Ward No-16 Water Supply 0.08 Work Completed
54 Providing and laying 200 mm dia CI/DI Pipeline from Buniyadabad Tank Complex to Haddo Ganesh Temple at Haddo Ward No-01 Water Supply 0.42 Work Completed
55 Providing and laying 200 mm dia CI/DI Pipeline from Buniyadabad Tank Complex to Hotel Shalimar at Phoenix Bay Ward No-3 Water Supply 0.26 Work Completed
56 Providing and laying 200 mm dia CI/DI Pipeline from Buniyadabad Tank Complex to Durga Prasad House at Haddo Ward No-01. Water Supply 0.31 Work Completed
57 Providing and laying 200 mm dia CI/DI Pipeline from Buniyadabad Tank Complex to VIMCO land junction at Delanipur Ward No- 03. Water Supply 0.17 Work Completed
58 Providing and laying 150 mm dia DI/CI pipeline from AIR Tank to Carmel School at Phoneix Bay Ward No-06. Water Supply 0.18 Work Completed
59 Providing and laying 100 mm dia GI pipe line from Phoneix Bay APWD Store Junction to Light House and Light Ship Office at Phoneix Bay Ward No-03. Water Supply 0.08 Work Completed
60 Construction of Open Air gym station including installation of open air gym equipments at Gandhi Park. Parks 0.08 Work Completed
61 Providing and laying 100 mm dia DI inlet and outlet pipeline from the newly surface tank at Marine Hill near Marine Dry Dock. Water Supply 0.15 Work Completed
62 Pipe laying 100 mm dia DI pipeline from newly constructed Circular Tank at Marine Hill to Marine Dry Dock Gate. Water Supply 0.14 Work Completed
63 Providing and laying 100 mm dia main pipeline from OHT at Atlanta point, Police Radio HQ to Shri. Shailesh Kumar House at Atlanta Point at Ward No-5. Water Supply 0.06 Work Completed
64 Providing and laying of 80 mm dia GI pipeline from Main road to D & K City Ward No-16. Water Supply 0.03 Work Completed
65 Providing and laying of 50 mm dia pipeline backside of Councillor Quarter Prem Nagar Ward No-06. Water Supply 0.01 Work Completed
66 Providing and laying of 50 mm dia pipeline at School line basthi near Shiva saloon to Mukesh house via shopping complex in ward no 16 Water Supply 0.01 Work Completed
67 Providing and laying of 80 mm dia GI pipeline from School Line Water Tank to Shri. Govind Ram House at School Line in Ward No-16 Water Supply 0.02 Work Completed
68 Providing and laying of 80 mm dia GI pipeline at Budatala Basthi Dairy Farm Japanesh House to Smti. Ponnalu via Smti. Salma House in Ward No-15 Water Supply 0.01 Work Completed
69 Providing and laying of 80 mm dia GI pipeline from Sapna Theatre to Shri. Bablu House New Pahar Gaon Ward No-20. Water Supply 0.03 Work Completed
70 Providing and laying of 80 mm dia GI pipeline from Shri. Ramu house to Shri. Rehman house at New Pahar Gaon Ward No-20. Water Supply 0.02 Work Completed
71 Providing and laying of 65 mm dia GI pipeline from Shri. Surendran House to Subbiah house near arch at Dairy Farm Ward No-14. Water Supply 0.02 Work Completed
72 Providing and laying of 65 mm dia pipeline from Majid to Shri. Jawahar House at Austinabad , Ward No- 20. Water Supply 0.02 Work Completed
73 Providing and laying of 80 mm dia GI pipeline from Community Hall Depali Chaki House at New Pahar Gaon Ward No-20. Water Supply 0.02 Work Completed
74 Providing and laying 80 mm dia GI pipeline at Lambaline Telugu Basthi from Chitti Babu House to Krishna Pan shop in ward No-09 Water Supply 0.01 Work Completed
75 Providing and laying 65 mm dia GI pipeline at Lambaline Tamil Basthi from Shri. Pandi House to Anjali Driving School in Ward No-09 Water Supply 0.01 Work Completed
76 Providing and laying 65 mm dia GI pipeline Dairy Farm Bada Bejin from Subbaiah House to Sadha House , Ward No-15. Water Supply 0.01 Work Completed
77 Providing and laying 80 mm dia GI pipeline from Dairy Farm Smti. Savitri Amma House to Durai Raj House to Sathiah Ward No-15 Water Supply 0.01 Work Completed
78 Providing and laying 50 mm dia pipeline at Old Pahar Gaon near Shri. B.Kutty House to Dr Sharma House Ward No-16 Water Supply 0.01 Work Completed
79 Providing and laying GI branch pipeline 80 mm dia, 65 mm dia and 50 mm dia mainline in the newly laid DI line at Marine Hill. Water Supply 0.06 Work Completed