| S.No. | Project Title | Project Type | Project Cost (in ₹ Cr.) |
Milestone |
|---|---|---|---|---|
| 1 | Upgradation of Pumping Machinery Part 03 Existing sewage Pumping station (One) at Geet Gurjari in Central Zone area of RMC | Sewerage/Septage | 1.69 | Work Completed |
| 2 | SITC work of water supply projects at Tirupati head works for pumping machinery with 5 year Comprehensive O& M | Water Supply | 1.79 | Work Completed |
| 3 | Design, Engineering, Procurement of Water Pumping Sets along with Associated Electrical Equipment, Instrumentation, Manifold with MS Piping System for Water Supply pumping Station for Vavdi ESR at Rajkot with 5 Year O&M | Water Supply | 1.63 | Work Completed |
| 4 | Design, Procurement, Installation, Erection, Testing and Comissioning of Pumping Matchinery, Piping and Electrical for Pump House at Jilla Gardeen ESR and GSR for the Water Supply Augmentation Scheme for Ward 8 and 15 Jilla Garden - Rajkot | Water Supply | 1.97 | Work Completed |
| 5 | Upgradation of Pumping Machinery. Part 03 - Existing 1 (ONE) No. Sewage Pumping Station (Bedinaka-‘C’ ) in Central Zone area of RMC. | Drainage | 1.68 | Work Completed |
| 6 | Design, Engineering, Procurement, Supply, Erection, Testing and Comissioning of Water Pumping Sets along with associated electrical equipments, Manifold with MS Piping System for Water Supply, umping Station for Narayannagar ESR at Rajkot | Water Supply | 1.24 | Work Completed |
| 7 | Providing, Lowering Laying, Jointing, Testing and Comissioning of DI/MS Pipeline for main from Aji filter plant to Tirupatinagar & Swati Parks Headworks for Water Supply System of Kothariya Area of Rajkot | Water Supply | 3.83 | Work Completed |
| 8 | Upgradation of Pumping matchinery, Part.01 - Exhisting 2(Two) Nos. Sewerage Pumping Station (Housing Board, Kalawad Rd SPS) in WZ of RMC | Sewerage/Septage | 4.76 | Work Completed |
| 9 | Rejuvenation of Madhapar STP-80 MLD Capacity - Part 02 - Treated Water Disposal Pipeline. | Sewerage/Septage | 4 | Work Completed |
| 10 | Upgradation of Pumping Machinary Part-2 existing 2 nos. Sewage Pumping Station (Padak road,Bedipara "f" SPS) in East zone area of RMC | Sewerage/Septage | 2.17 | Work Completed |
| 11 | Expansion of drainage Coverage Part 05-Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Parshuram Industrial Area, Dindayal Industrial, Yuvrajnagar Industrial Area of RMC area | Sewerage/Septage | 0.74 | Work Completed |
| 12 | Expansion of Drainage Coverage: Part 02 Sewerage Network of Zone 1 and 3 of Rajkot, (Sub Part A) Providing, Laying for Sewer Network in Remaining Areas of Zone-3 in Ward No-15. | Sewerage/Septage | 15.2 | Work Completed |
| 13 | Expansion of Drainage Coverage Part-05, Providing, Lowering for Sewage Network and House Connection System in Low Lying of Manharpura in Ward.No-06 | Drainage | 1.91 | Work Completed |
| 14 | Expansion of Drainage Coverage Part 03-Providing, Lowering, Laying Drainage Mainline and House Connection Chamber from Gondal Road NH to Narayan Nagar and Adjoining Resi/Ind Area upto Kothariya Gamtal in Ward.18(Part-C) | Sewerage/Septage | 14.07 | Work Completed |
| 15 | Expansion of Drainage Coverage Part 03 - Providing, Lowering, Laying for Drainage Mainline and House Connection Chamber from Gondal Road NH to Rolex Road, Solvant Fatak Towards Kothariya Gamtal Surrounding Resi/Ind Area in Ward-18 (Part-B) | Sewerage/Septage | 11.43 | Work Completed |
| 16 | Expansion of Drainage Coverage Part 03 - Providing, Lowering, Work for Drainage Mainline and House Connection Chambers from Kothariya Ring Road Adjoining National Highway Towards Animal Hostel, Kothariya Gam Tal and Adjoining Residential/Industrial Areas of Kothariya War.18(Part-A) | Sewerage/Septage | 14.4 | Work Completed |
| 17 | Providing, Lowering Laying, Jointing, Testing and Comissioning of DI/MS Pipeline for main from Gondal Road to Narayan Nagar & Swati Parks Headworks for Water Supply System of Kothariya Area of Rajkot | Water Supply | 5.03 | Work Completed |
| 18 | Designing and Survey, Providing, Supplying and Lowering Laying, Jointing, Testing and Comissioning of 508mm Dia LPE MS Pipeline Gravity Main Line from Dhebar Road to Jilla Garden Head Works for Ward.No.08 and 15 at Jilla Garden | Water Supply | 3.49 | Work Completed |
| 19 | Expansion of Drainage Coverage- Part 02 Sewerage Network of Zone 1 and 3 of Rajkot. (TP Scheme No. 31 Rajkot and areas between Old ward area no 18's Aji and Khokhadadi River.) | Sewerage/Septage | 6.28 | Work Completed |
| 20 | Expansion of Distribution network for newly merged area Part 08 Laying of DI Pipeline Network in Central Zone's Ward No. 13 -Navalnagar. | Water Supply | 7.35 | Work Completed |
| 21 | Expansion of Distribution network for newly merged area Part 07 Water Supply network for Mavdi TPS No.26, 27 & 28 in Ward No.11 | Water Supply | 16.31 | Work Completed |
| 22 | Expansion of Distribution network for newly merged area Part 06 Kothariya Network (C )- Narayan Nagar | Water Supply | 2.37 | Work Completed |
| 23 | Expansion of Distribution network for newly merged area Part 05 Kothariya Network (B )- Swati Park | Water Supply | 5.1 | Work Completed |
| 24 | Expansion of Distribution network for newly merged area Part 04 Kothariya Head Work (A) - Tirupati Nagar | Water Supply | 4.71 | Work Completed |
| 25 | Expansion of Distribution network for newly merged area Part 02 Vavdi Head Works | Water Supply | 4.61 | Work Completed |
| 26 | Expansion of Distribution network for newly merged area Part 01 Vavdi Distribution Network | Water Supply | 32.18 | Work Completed |
| 27 | Strengthening of existing and laying new Distribution Network Part 02 Jilla garden Head Work. | Water Supply | 5.7 | Work Completed |
| 28 | Strengthening of existing and laying new Distribution Network Part 02 - Chandresh nagar Water Metering Project | Water Supply | 5.94 | Work Completed |
| 29 | Expansion of drainage Coverage Part 07-Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Parewadi Chowk and Astha Ventila of RMC Area in Ward No.4 | Sewerage/Septage | 1.44 | Work Completed |
| 30 | Expansion of drainage Coverage Part 06-Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Shakti Society, Lalpari & Maldhari area, Manchhanagar and Marketing Yard of RMC Area in Ward No.5 | Sewerage/Septage | 3.12 | Work Completed |
| 31 | Expansion of drainage Coverage Part 04-Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Aji GIDC of RMC Area in Ward No.15 | Sewerage/Septage | 3.85 | Work Completed |
| 32 | Expansion of drainage Coverage Part 02- Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Vavdi in Ward No.12, Ward No.13 (Part) of RMC Area | Sewerage/Septage | 14.74 | Work Completed |
| 33 | Expansion of drainage Coverage Part 01-Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Raiyadhar of RMC Area in Ward No.1 | Sewerage/Septage | 14.38 | Work Completed |
| 34 | Storm Water Drainage Project for Rajkot Municipal Corporation Newly Merged Area. | Drainage | 8.09 | Work Completed |
| 35 | Expansion of Distribution network for newly merged area -Kothariya Network Part 03 providing,suppliying,Lowering,laying,Jointing,Testing and Commissioning Of D.I. pipe for Distribution Network for water supply system for Narayan Nagar Head -Works Command area & Ribada Direct Taping Area betweenN | Water Supply | 7.76 | Work Completed |
| 36 | Expansion of Distribution network for newly merged area -Kothariya Network Part 02 providing,suppliying,Lowering,laying,Jointing,Testing and Commissioning Of D.I. pipe for Distribution Network for water supply system for Swati Park Head -Works Command area Of kothariya.(Ward No-18) | Water Supply | 10.88 | Work Completed |
| 37 | Expansion of Distribution network for newly merged area -Kothariya Network Part 01 providing,suppliying,Lowering,laying,Jointing,Testing and Commissioning Of D.I. pipe for Distribution Network for water supply system for Tirupati Nagar Head -Works Command area Of kothariya.(Ward No-18) | Water Supply | 10.4 | Work Completed |
| 38 | Strengthening of existing and laying new Distribution Network Part 01 Jilla garden Distribution Network. | Water Supply | 31.7 | Work Completed |
| 39 | Development of Parks and playground at Various Places in Rajkot Part 02 - Landscaping and Gardening work at Aaji Dam Down Stream | Parks | 4.49 | Work Completed |
| 40 | Development of Parks and playground at Various Places in Rajkot Part 01 - Landscaping and Gardening work at Nyari Dam Down Stream | Parks | 1.59 | Work Completed |
| 41 | Garden Development Part 04 -Development of landscape gardening consisting of Hardscaping work and Softscaping works along with maintenance of tendered works for period of three years at FP 96, TP-12. | Parks | 0.23 | Work Completed |
| 42 | Garden Development Part 03- Development of landscape gardening consisting of Hardscaping work and Softscaping works along with maintenance of tendered works for period of three years at Ward-9, TP-6, Plot-178 | Parks | 0.12 | Work Completed |
| 43 | Garden Development Part 02- Development of landscape gardening consisting of Hardscaping work and Softscaping works along with maintenance of tendered works for period of three years at Ward-3, TP-24, Plot-3C | Parks | 0.6 | Work Completed |
| 44 | Garden Development Part 01- Development of landscape gardening consisting of Hardscaping work and Softscaping works along with maintenance of tendered works for period of three year at Ward - 3, TP - 23, 24 Plot.No 5D & 39A | Parks | 0.56 | Work Completed |
| 45 | Construction of 15 MLD Sewerage Treatment Plant at Kothariya of RMC East Zone Area | Sewerage/Septage | 24.73 | Work Completed |
| 46 | Construction of Sewerage Pumping Station at Doordarshan Site of RMC East Zone Area | Sewerage/Septage | 3.01 | Work Completed |
| 47 | Construction of Sewerage Pumping Station(SPS-03) in Kothariya Gamtal of RMC East Zone Area | Sewerage/Septage | 10.23 | Work Completed |
| 48 | Construction of Sewerage Pumping Station(SPS-02) in Punitnagar of RMC WZ Area | Sewerage/Septage | 2.38 | Work Completed |
| 49 | Construction of Sewerage Pumping Station(SPS-01) in Vavdi of RMC WZ Area | Sewerage/Septage | 4.09 | Work Completed |
| 50 | 4 Design and Development of Footpath, Service Duct and Storm water drain from Hospital Chowk to Bajragwadi Road in Central Zone | Urban Transport | 2.71 | Work Completed |
| 51 | 3 Design and Development of Footpath, Service Duct and Storm water drain on 80 ft. Road Near Ramapir Chowk in West Zone | Urban Transport | 0.77 | Work Completed |
| 52 | 2. Design and Development of Footpath, Service Duct and Strom water drain on Off Pedak Road in East Zone | Urban Transport | 1.05 | Work Completed |
| 53 | 1 Design and Development of Footpath & Cycle Track at Dhebar Road (from Railway crossing to NH 8) in Ward No – 17 | Urban Transport | 1.08 | Work Completed |
| 54 | Upgradation of existing drainage network made in phase I & II part I | Sewerage/Septage | 26.08 | Work Completed |
| 55 | Construction of Filter Plant and Storage Part 02-Construction of 50 MLD Water Treatment Plant at GETCO Chowkdi. | Water Supply | 37.77 | Work Completed |
| 56 | Construction of 50 MLD Capacity Water Treatment Plant at Raiyadhar. | Water Supply | 30.14 | Work Completed |
| 57 | Strengthening of existing and laying new Distribution Network Part 01- Chandresh nagar Water Metering Project- Laying of DI Pipe at Chandresh Nagar. | Water Supply | 6.68 | Work Completed |
| 58 | Expansion of Drainage Coverage. Part 01 - Providing, Lowering, Laying, Jointing, Testing and Commissioning of 150mm, 200mm, 250 mm stonew are pipe Sewer collection Network at Aum Tirupati Balaji and surrounding areas of Kotharia, Rajkot along with all allied works complete (Ward no. 18 & 4). | Sewerage/Septage | 5.66 | Work Completed |
| 59 | Rejuvenation of STP at Madhapar | Sewerage/Septage | 45.75 | Work Completed |
| 60 | Garden Development at Nyari Dam Site (Kalawad Road) | Parks | 0.47 | Work Completed |