1 Upgradation of Pumping Machinery Part 03 Existing sewage Pumping station (One) at Geet Gurjari in Central Zone area of RMC Sewerage/Septage 1.69 Work Completed
2 SITC work of water supply projects at Tirupati head works for pumping machinery with 5 year Comprehensive O& M Water Supply 1.79 Work Completed
3 Design, Engineering, Procurement of Water Pumping Sets along with Associated Electrical Equipment, Instrumentation, Manifold with MS Piping System for Water Supply pumping Station for Vavdi ESR at Rajkot with 5 Year O&M Water Supply 1.63 Work Completed
4 Design, Procurement, Installation, Erection, Testing and Comissioning of Pumping Matchinery, Piping and Electrical for Pump House at Jilla Gardeen ESR and GSR for the Water Supply Augmentation Scheme for Ward 8 and 15 Jilla Garden - Rajkot Water Supply 1.97 Work Completed
5 Upgradation of Pumping Machinery. Part 03 - Existing 1 (ONE) No. Sewage Pumping Station (Bedinaka-‘C’ ) in Central Zone area of RMC. Drainage 1.68 Work Completed
6 Design, Engineering, Procurement, Supply, Erection, Testing and Comissioning of Water Pumping Sets along with associated electrical equipments, Manifold with MS Piping System for Water Supply, umping Station for Narayannagar ESR at Rajkot Water Supply 1.24 Work Completed
7 Providing, Lowering Laying, Jointing, Testing and Comissioning of DI/MS Pipeline for main from Aji filter plant to Tirupatinagar & Swati Parks Headworks for Water Supply System of Kothariya Area of Rajkot Water Supply 3.83 Work Completed
8 Upgradation of Pumping matchinery, Part.01 - Exhisting 2(Two) Nos. Sewerage Pumping Station (Housing Board, Kalawad Rd SPS) in WZ of RMC Sewerage/Septage 4.76 Work Completed
9 Rejuvenation of Madhapar STP-80 MLD Capacity - Part 02 - Treated Water Disposal Pipeline. Sewerage/Septage 4 Work Completed
10 Upgradation of Pumping Machinary Part-2 existing 2 nos. Sewage Pumping Station (Padak road,Bedipara "f" SPS) in East zone area of RMC Sewerage/Septage 2.17 Work Completed
11 Expansion of drainage Coverage Part 05-Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Parshuram Industrial Area, Dindayal Industrial, Yuvrajnagar Industrial Area of RMC area Sewerage/Septage 0.74 Work Completed
12 Expansion of Drainage Coverage: Part 02 Sewerage Network of Zone 1 and 3 of Rajkot, (Sub Part A) Providing, Laying for Sewer Network in Remaining Areas of Zone-3 in Ward No-15. Sewerage/Septage 15.2 Work Completed
13 Expansion of Drainage Coverage Part-05, Providing, Lowering for Sewage Network and House Connection System in Low Lying of Manharpura in Ward.No-06 Drainage 1.91 Work Completed
14 Expansion of Drainage Coverage Part 03-Providing, Lowering, Laying Drainage Mainline and House Connection Chamber from Gondal Road NH to Narayan Nagar and Adjoining Resi/Ind Area upto Kothariya Gamtal in Ward.18(Part-C) Sewerage/Septage 14.07 Work Completed
15 Expansion of Drainage Coverage Part 03 - Providing, Lowering, Laying for Drainage Mainline and House Connection Chamber from Gondal Road NH to Rolex Road, Solvant Fatak Towards Kothariya Gamtal Surrounding Resi/Ind Area in Ward-18 (Part-B) Sewerage/Septage 11.43 Work Completed
16 Expansion of Drainage Coverage Part 03 - Providing, Lowering, Work for Drainage Mainline and House Connection Chambers from Kothariya Ring Road Adjoining National Highway Towards Animal Hostel, Kothariya Gam Tal and Adjoining Residential/Industrial Areas of Kothariya War.18(Part-A) Sewerage/Septage 14.4 Work Completed
17 Providing, Lowering Laying, Jointing, Testing and Comissioning of DI/MS Pipeline for main from Gondal Road to Narayan Nagar & Swati Parks Headworks for Water Supply System of Kothariya Area of Rajkot Water Supply 5.03 Work Completed
18 Designing and Survey, Providing, Supplying and Lowering Laying, Jointing, Testing and Comissioning of 508mm Dia LPE MS Pipeline Gravity Main Line from Dhebar Road to Jilla Garden Head Works for Ward.No.08 and 15 at Jilla Garden Water Supply 3.49 Work Completed
19 Expansion of Drainage Coverage- Part 02 Sewerage Network of Zone 1 and 3 of Rajkot. (TP Scheme No. 31 Rajkot and areas between Old ward area no 18's Aji and Khokhadadi River.) Sewerage/Septage 6.28 Work Completed
20 Expansion of Distribution network for newly merged area Part 08 Laying of DI Pipeline Network in Central Zone's Ward No. 13 -Navalnagar. Water Supply 7.35 Work Completed
21 Expansion of Distribution network for newly merged area Part 07 Water Supply network for Mavdi TPS No.26, 27 & 28 in Ward No.11 Water Supply 16.31 Work Completed
22 Expansion of Distribution network for newly merged area Part 06 Kothariya Network (C )- Narayan Nagar Water Supply 2.37 Work Completed
23 Expansion of Distribution network for newly merged area Part 05 Kothariya Network (B )- Swati Park Water Supply 5.1 Work Completed
24 Expansion of Distribution network for newly merged area Part 04 Kothariya Head Work (A) - Tirupati Nagar Water Supply 4.71 Work Completed
25 Expansion of Distribution network for newly merged area Part 02 Vavdi Head Works Water Supply 4.61 Work Completed
26 Expansion of Distribution network for newly merged area Part 01 Vavdi Distribution Network Water Supply 32.18 Work Completed
27 Strengthening of existing and laying new Distribution Network Part 02 Jilla garden Head Work. Water Supply 5.7 Work Completed
28 Strengthening of existing and laying new Distribution Network Part 02 - Chandresh nagar Water Metering Project Water Supply 5.94 Work Completed
29 Expansion of drainage Coverage Part 07-Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Parewadi Chowk and Astha Ventila of RMC Area in Ward No.4 Sewerage/Septage 1.44 Work Completed
30 Expansion of drainage Coverage Part 06-Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Shakti Society, Lalpari & Maldhari area, Manchhanagar and Marketing Yard of RMC Area in Ward No.5 Sewerage/Septage 3.12 Work Completed
31 Expansion of drainage Coverage Part 04-Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Aji GIDC of RMC Area in Ward No.15 Sewerage/Septage 3.85 Work Completed
32 Expansion of drainage Coverage Part 02- Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Vavdi in Ward No.12, Ward No.13 (Part) of RMC Area Sewerage/Septage 14.74 Work Completed
33 Expansion of drainage Coverage Part 01-Providing, Lowering, Laying, Jointing and Testing Work for Sewerage Network and House Connection System Under AMRUT Yojana in Raiyadhar of RMC Area in Ward No.1 Sewerage/Septage 14.38 Work Completed
34 Storm Water Drainage Project for Rajkot Municipal Corporation Newly Merged Area. Drainage 8.09 Work Completed
35 Expansion of Distribution network for newly merged area -Kothariya Network Part 03 providing,suppliying,Lowering,laying,Jointing,Testing and Commissioning Of D.I. pipe for Distribution Network for water supply system for Narayan Nagar Head -Works Command area & Ribada Direct Taping Area betweenN Water Supply 7.76 Work Completed
36 Expansion of Distribution network for newly merged area -Kothariya Network Part 02 providing,suppliying,Lowering,laying,Jointing,Testing and Commissioning Of D.I. pipe for Distribution Network for water supply system for Swati Park Head -Works Command area Of kothariya.(Ward No-18) Water Supply 10.88 Work Completed
37 Expansion of Distribution network for newly merged area -Kothariya Network Part 01 providing,suppliying,Lowering,laying,Jointing,Testing and Commissioning Of D.I. pipe for Distribution Network for water supply system for Tirupati Nagar Head -Works Command area Of kothariya.(Ward No-18) Water Supply 10.4 Work Completed
38 Strengthening of existing and laying new Distribution Network Part 01 Jilla garden Distribution Network. Water Supply 31.7 Work Completed
39 Development of Parks and playground at Various Places in Rajkot Part 02 - Landscaping and Gardening work at Aaji Dam Down Stream Parks 4.49 Work Completed
40 Development of Parks and playground at Various Places in Rajkot Part 01 - Landscaping and Gardening work at Nyari Dam Down Stream Parks 1.59 Work Completed
41 Garden Development Part 04 -Development of landscape gardening consisting of Hardscaping work and Softscaping works along with maintenance of tendered works for period of three years at FP 96, TP-12. Parks 0.23 Work Completed
42 Garden Development Part 03- Development of landscape gardening consisting of Hardscaping work and Softscaping works along with maintenance of tendered works for period of three years at Ward-9, TP-6, Plot-178 Parks 0.12 Work Completed
43 Garden Development Part 02- Development of landscape gardening consisting of Hardscaping work and Softscaping works along with maintenance of tendered works for period of three years at Ward-3, TP-24, Plot-3C Parks 0.6 Work Completed
44 Garden Development Part 01- Development of landscape gardening consisting of Hardscaping work and Softscaping works along with maintenance of tendered works for period of three year at Ward - 3, TP - 23, 24 Plot.No 5D & 39A Parks 0.56 Work Completed
45 Construction of 15 MLD Sewerage Treatment Plant at Kothariya of RMC East Zone Area Sewerage/Septage 24.73 Work Completed
46 Construction of Sewerage Pumping Station at Doordarshan Site of RMC East Zone Area Sewerage/Septage 3.01 Work Completed
47 Construction of Sewerage Pumping Station(SPS-03) in Kothariya Gamtal of RMC East Zone Area Sewerage/Septage 10.23 Work Completed
48 Construction of Sewerage Pumping Station(SPS-02) in Punitnagar of RMC WZ Area Sewerage/Septage 2.38 Work Completed
49 Construction of Sewerage Pumping Station(SPS-01) in Vavdi of RMC WZ Area Sewerage/Septage 4.09 Work Completed
50 4 Design and Development of Footpath, Service Duct and Storm water drain from Hospital Chowk to Bajragwadi Road in Central Zone Urban Transport 2.71 Work Completed
51 3 Design and Development of Footpath, Service Duct and Storm water drain on 80 ft. Road Near Ramapir Chowk in West Zone Urban Transport 0.77 Work Completed
52 2. Design and Development of Footpath, Service Duct and Strom water drain on Off Pedak Road in East Zone Urban Transport 1.05 Work Completed
53 1 Design and Development of Footpath & Cycle Track at Dhebar Road (from Railway crossing to NH 8) in Ward No – 17 Urban Transport 1.08 Work Completed
54 Upgradation of existing drainage network made in phase I & II part I Sewerage/Septage 26.08 Work Completed
55 Construction of Filter Plant and Storage Part 02-Construction of 50 MLD Water Treatment Plant at GETCO Chowkdi. Water Supply 37.77 Work Completed
56 Construction of 50 MLD Capacity Water Treatment Plant at Raiyadhar. Water Supply 30.14 Work Completed
57 Strengthening of existing and laying new Distribution Network Part 01- Chandresh nagar Water Metering Project- Laying of DI Pipe at Chandresh Nagar. Water Supply 6.68 Work Completed
58 Expansion of Drainage Coverage. Part 01 - Providing, Lowering, Laying, Jointing, Testing and Commissioning of 150mm, 200mm, 250 mm stonew are pipe Sewer collection Network at Aum Tirupati Balaji and surrounding areas of Kotharia, Rajkot along with all allied works complete (Ward no. 18 & 4). Sewerage/Septage 5.66 Work Completed
59 Rejuvenation of STP at Madhapar Sewerage/Septage 45.75 Work Completed
60 Garden Development at Nyari Dam Site (Kalawad Road) Parks 0.47 Work Completed