| S.No. | Project Title | Project Type | Project Cost (in ₹ Cr.) |
Milestone |
|---|---|---|---|---|
| 1 | Paver block to footpath work for MGVCL office near akota bridge to akota police line | Urban Transport | 0.19 | Work Completed |
| 2 | Paver Block Work for Both the side on the road from Dodsal Colony to Gay Circle | Urban Transport | 0.24 | Work Completed |
| 3 | Paver Block Work for Both the side on the road from Shivaji Circle to Dandiya Bazar bridge | Urban Transport | 0.88 | Work Completed |
| 4 | Construction of new APS at Amitnagar & Providing and laying new drainage Gravity line by Microtunneling method | Sewerage/Septage | 13.93 | Work Completed |
| 5 | Redevelopment of Nimeta Garden | Parks | 2.17 | Work Completed |
| 6 | Development of Garden along periphery of Nani Bapod lake | Parks | 0.56 | Work Completed |
| 7 | Development of garden along Periphery of Gotri Lake | Parks | 0.83 | Work Completed |
| 8 | AUGMENTATION OF INDRAPURI APS AND ITS PRESSURE MAIN | Drainage | 8.64 | Work Completed |
| 9 | PROVIDING, LAYING, JOINTING, TESTING AND COMISSIONING OF WATER DISTRIBUTION NETWORK IN VASNA | Water Supply | 11.45 | Work Completed |
| 10 | Chhani STP of 50 MLD Capacity with upgradation of Old Sama, New Sama and Shashtrinagar APS | Sewerage/Septage | 93.25 | Work Completed |
| 11 | Varasia Ring road to Essar Petrol pump To Khodiyar nagar footpath work | Urban Transport | 0.18 | Work Completed |
| 12 | Manglesh zapa to Sangam to Manek park circle road wall to wall | Urban Transport | 2.04 | Work Completed |
| 13 | Keya motors to Zamku duplex footpath work | Urban Transport | 0.4 | Work Completed |
| 14 | O.P road Havmor circle (Nisarg) to Ward-11 office service track & footpath work | Urban Transport | 1.99 | Work Completed |
| 15 | Construction of new APS at Bahucharajee- Nagarwada Kaans | Sewerage/Septage | 8.16 | Work Completed |
| 16 | Traffic Management Measures (Traffic Furniture, Sinages, Footh-path, etc. | Urban Transport | 3 | Work Completed |
| 17 | Construction of New STP (60 MLD capacity) at Kapurai with MPS, APS near Highway with pressure & gravity line network. | Sewerage/Septage | 73.12 | Work Completed |
| 18 | Water supply source augmentation for sindhrot weir including intake structure, WTP and Transmission main | Water Supply | 165.76 | Work Completed |
| 19 | Networking and Metering at GIDC and Vasna | Water Supply | 28.11 | Work Completed |
| 20 | Rajivnagar 78 MLD STP | Sewerage/Septage | 88.5 | Work Completed |
| 21 | Development of the T.P. 13 green belt (Nagar Nandanvan)along the Narmada Canal with jogging track and picnic center | Parks | 1.76 | Work Completed |
| 22 | construction of R.C.C. Storm water drain to divert storm water entering into Vadodara city from National High Way (from Darjipura culvert to Vishwamitri River) | Drainage | 27.99 | Work Completed |
| 23 | Development and land scaping of garden at Sayajipura TP 2,F.P.49 | Parks | 0.37 | Work Completed |