| S.No. | Project Title | Project Type | Project Cost (in ₹ Cr.) |
Milestone |
|---|---|---|---|---|
| 1 | Development of Eco Park at Shalimar Foreshore junction in Srinagar | Parks | 1.97 | Work Completed |
| 2 | Development of Cycle Track along the Bund of River Jhelum from Shivpora towards Batwara in Srinagar | Urban Transport | 2.74 | Work Completed |
| 3 | Construction of Storm Water Drainage Scheme at Hamdania Colony Khomani Chowk Phase 1 Srinagar | Sewerage/Septage | 6.1 | Work Completed |
| 4 | Construction of Storm Water Drainage Scheme at Hamdania Colony Khomani Chowk Phase 1 Srinagar | Drainage | 11.57 | Work Completed |
| 5 | Construction of Storm Water drainage network at Iqbal Colony, HMT, Srinagar | Drainage | 3.02 | Work Completed |
| 6 | Development of Cycle Track with footpath and green stretches from Bemina Bypass Chowk towards Shalteng | Urban Transport | 2.61 | Work Completed |
| 7 | Development of park near dock yard complex, foreshore road Srinagar | Parks | 0.78 | Work Completed |
| 8 | Rejuvenation of Brari Nambal: Providing aerators for aeration and aesthetics : Phase -IV | Parks | 0.58 | Work Completed |
| 9 | Rejuvenation of Brari Nambal :Beautification along walkway by providing Flower beds and turfing which will add to beauty and aesthetic of lagoon. -: Phase -III | Parks | 0.41 | Work Completed |
| 10 | Rejuvenation of Brari Nambal :Dredging of lagoon and feeding channels of various sections -: Phase -II | Drainage | 8.62 | Work Completed |
| 11 | Construction of Walkways and slope stabilization of Brari Nambal Lagoon (PATCH WORKS) - Phase-I | Urban Transport | 2.2 | Work Completed |
| 12 | Procurement of Buses by SRTC | Urban Transport | 10.1 | Contract Awarded |
| 13 | Development of walkway /Footpath at Shreen Bagh bund (Darish Kadal side). | Urban Transport | 0.7 | Work Completed |
| 14 | Development of Green patch from Rambagh to tengpora bund. | Urban Transport | 1.53 | Work Completed |
| 15 | Development of walkway /Footpath along the bund from Peerbagh to Wanbal. | Urban Transport | 1.83 | Work Completed |
| 16 | Development of walkways/ footpaths along Shereen bagh bund,Srinagar | Urban Transport | 1.02 | Work Completed |
| 17 | Intelligent Traffic Management System-Phase-II | Urban Transport | 7.69 | Work Completed |
| 18 | Intelligent Traffic Management System-Phase-I | Urban Transport | 4.96 | Work Completed |
| 19 | Design ,Construction,Testing and Commissioning Sewerage system of by way of Providing and laying of Sewerage network, construction of manholes,House connections and pumping station for 2 3 (a) of peripheral area of Dal Lake Zone. | Sewerage/Septage | 24.8 | Work Completed |
| 20 | Construction of covered semi deep drain,open surface drain,foothpath and central verge of idle parking at bus terminal Pantha Chowk. | Urban Transport | 3.65 | Work Completed |
| 21 | Providing, Laying Commissing including operation and maintanance for one year of 1200 mm dia K-9 Ductile iron pipe line from fore bay of old Ganderbal Power House (OGPH) to 30 MGD (165MLD) Water Treatment Plants at Rangil on turkey basis. | Water Supply | 20.66 | Work Completed |
| 22 | Development of Green Patch into Public Park from AL -Farooq Colony to Ibrahim Colony at Bemina (Parallel to Bye Pass Road) | Parks | 1.8 | Work Completed |
| 23 | Storm Water Drainage scheme for Gangbuk Area Srinagar. | Drainage | 8.14 | Work Completed |
| 24 | Extension of Tulip Garden | Parks | 0.59 | Work Completed |
| 25 | Development of Buffer Zone along the periphery of landfill site at Achan Srinagar. | Parks | 0.94 | Work Completed |
| 26 | Development of public park behind food court near Heritage old Zero Bridge Sgr on left side of River Jehlum. | Parks | 0.92 | Work Completed |
| 27 | Construction of Multilevel Parking (Ramp Type) at State Motor Garage, Lal Chowk, Srinagar | Urban Transport | 29.63 | Work Completed |
| 28 | Construction of Multi Tier parking (Ramp Type) at Sheikh Bagh, Lal Chowk Srinagar | Urban Transport | 24.04 | Work Completed |
| 29 | Constt./Upgradation of Dewatering Stations for Nund Reshi Colony, Bemina | Drainage | 3.24 | Work Completed |
| 30 | Storm Water Drainage Scheme at Malbagh | Drainage | 5.22 | Work Completed |
| 31 | Storm Water Drainage Scheme at Indra Nagar | Drainage | 9.67 | Work Completed |
| 32 | Storm Water Drainage Scheme at Shalteng | Drainage | 17.86 | Work Completed |
| 33 | Storm Water Drainage Scheme at Lal Chowk | Drainage | 9.45 | Work Completed |
| 34 | Alternate Tech. of septage treatment plant : b) Design, construction, erection and commof 164 KLD Septage Treatment Plant at Alluchi-Bagh / Tengpora Srinagar Zone-I | Sewerage/Septage | 5.94 | Work Completed |
| 35 | Alternate Tech. of septage treatment plant: a) Design, construction Erection Testing and Comm of 130 KLD Septage Treatment Plant at Achan Srinagar Zone II | Sewerage/Septage | 4.69 | Work Completed |
| 36 | Procurement of Sucker/ Jetting Machines | Sewerage/Septage | 3.57 | Work Completed |