| S.No. | Project Title | Project Type | Project Cost (in ₹ Cr.) |
Milestone |
|---|---|---|---|---|
| 1 | Survey and GIS Mapping of Storm Water Drainage, Sewerage Network & Assets, Water Supply Network & Assests in Palakkad Municipality | Water Supply | 0.46 | Work Completed |
| 2 | AMRUT 1-PALAKKAD MUNICIPALITY-Providing new House Connections and carrying out works in Pipelines to improve water supply levels in the connections | Water Supply | 24.24 | Work Completed |
| 3 | Construction of Drainage and covering slab at Mercy College -Thirunellayi road (Ch: 1.05 km. to 1.15 km RHS) | Drainage | 0.09 | Work Completed |
| 4 | Foot Bridge over Neerattuganapathy Pond at 100 feet road | Urban Transport | 0.25 | Work Completed |
| 5 | Victoria college to Anju vilakku pedestrian network Part 2 - Sulthan Petta to Anjuvilakk | Urban Transport | 0.5 | Work Completed |
| 6 | Providing Rider main pipe lines, Replacing AC pipe lines and service connection for proper zoning (Part-III) : Kalmandapam Zone-43.996km (450mm DI K9 -200mm DI K9 &160mm PVC) | Water Supply | 26.57 | Work Completed |
| 7 | Providing Rider main pipe lines, Replacing AC pipe lines and service connection for proper zoning (Part-II) : Moothanthara Zone-47.613km (600mm DI K9 -200mm DI K9 &160mm PVC) | Water Supply | 26.65 | Work Completed |
| 8 | Providing Rider main pipe lines, Replacing AC pipe lines and service connection for proper zoning (Part-I) : Mattumantha Zone- 46.933km (600mm DI K9 -200mm DI K9 &160mm PVC) | Water Supply | 23.85 | Work Completed |
| 9 | Bus Shelter at Palakkad Municipality - Model 2 | Urban Transport | 0.1 | Work Completed |
| 10 | Bus Shelter at Palakkad Municipality - Model 1 | Urban Transport | 0.09 | Work Completed |
| 11 | Rejuvenation of Kottamaidhan park - Phase 2 | Parks | 1.07 | Work Completed |
| 12 | Yard at Stadium Bus Terminal | Urban Transport | 1.85 | Work Completed |
| 13 | Melamuri-Kalampuzha-Karukodi drain phase 2 | Drainage | 0.32 | Work Completed |
| 14 | Melamuri-Kalampuzha-Karukodi drain phase 1 | Drainage | 0.37 | Work Completed |
| 15 | Footoverbridge over thodu at 100 ft road chainage -0-905m | Urban Transport | 0.47 | Work Completed |
| 16 | Construction of skew slab culvert in chainage 0/690 to 0/705 - near mathrubhumi office | Urban Transport | 0.5 | Work Completed |
| 17 | Slab culvert for footpathand cycle track at 100ft road chainage 0/905 to 0/935m | Urban Transport | 0.17 | Work Completed |
| 18 | Footpath around Fort area | Urban Transport | 0.57 | Work Completed |
| 19 | Construction of river side walkway along Kalpathy River bank- part 2- Behind New Kalpathi | Urban Transport | 0.43 | Work Completed |
| 20 | Pattikara bypass parking part 2-parking | Urban Transport | 0.34 | Work Completed |
| 21 | Chakkanthara- Kaikuthparambu- Venkiteshwaragarden- Sreenivasa Garden- near surya garden - part 3 | Drainage | 0.16 | Work Completed |
| 22 | Chakkanthara- Kaikuthparambu- Venkiteshwaragarden- Sreenivasa Garden- near venkateshwara garden part 2 | Drainage | 0.49 | Work Completed |
| 23 | Head Post office to Ramanadhapuram via Koppam - LHS PART 2 | Drainage | 0.45 | Work Completed |
| 24 | Puthur Temple- Kallepully Junction-Rhs- part 2 | Drainage | 0.44 | Work Completed |
| 25 | Vennakkara- Thirunellayi- near anugraha colony - part 3 | Drainage | 0.31 | Work Completed |
| 26 | Vennakkara- Thirunellayi- puthupallitheru to KSRTC link road - part 2 | Drainage | 0.47 | Work Completed |
| 27 | Mercy College- Thirunellayi- near mercy junction -part 2 | Drainage | 0.5 | Work Completed |
| 28 | Mercy College- Thirunellayi- LHS - part 1 | Drainage | 0.5 | Work Completed |
| 29 | kalmandapam Chittoor road - near polyclinic junc to bavanagar - part 3 | Drainage | 0.45 | Work Completed |
| 30 | kalmandapam chittoor road near kunnathurmedu -part 2 | Drainage | 0.48 | Work Completed |
| 31 | Sekharipuram- Sankhuvaramedu- near anganwadi - part 2 | Drainage | 0.32 | Work Completed |
| 32 | Manalai- Ramanadhapuram- Aanachira near ramanathapuram - part 2 | Drainage | 0.5 | Work Completed |
| 33 | Mattumantha Palayam - Chulliyodu drain- near Jaladha nagar - part 2 | Drainage | 0.44 | Work Completed |
| 34 | Vadakkanthara road secondary drain - near temple -part 2 | Drainage | 0.49 | Work Completed |
| 35 | Chakkamthara - Kaikuthu parambu behind Nurani gramam- part 2 | Drainage | 0.38 | Work Completed |
| 36 | karim nagar - near pulinchuvadu - part2 | Drainage | 0.23 | Work Completed |
| 37 | Thirunellayi Manappullikkavu Thodu- near thirunellayi - part 4 | Drainage | 0.48 | Work Completed |
| 38 | Thirunellayi Manappullikkavu Thodu- After thirunellai bridge - part3 | Drainage | 0.5 | Work Completed |
| 39 | Thirunellayi Manappullikkavu Thodu- between thirunellayi and Chadanakurissi | Drainage | 0.49 | Work Completed |
| 40 | Rejuvenation of drain around Sakunthala junction and construction of tertiary drain -near pattikara bypass road - part 4 | Drainage | 0.51 | Work Completed |
| 41 | Rejuvenation of drain around Sakunthala junction and construction of tertiary drain -near over bridge- part 3 | Drainage | 0.46 | Work Completed |
| 42 | Rejuvenation of drain around Sakunthala junction and construction of tertiary drain -near toll booth- part 2 | Drainage | 0.48 | Work Completed |
| 43 | widening of manapullikkavu Thirenellayi stream near karim nagar - part 4 | Drainage | 0.49 | Work Completed |
| 44 | widening of manapullikkavu thirunellayi stream - near yakkara and karim nagar part 3 | Drainage | 0.49 | Work Completed |
| 45 | widening of manappullikkavu Thirunellayi stream - near yakkara part 2 | Drainage | 0.49 | Work Completed |
| 46 | kalvakulam thodu desilting and Side wall -near pleasant street- part 2 | Drainage | 0.48 | Work Completed |
| 47 | kalvakulam thodu Desilting and side wall (near Bypass road)- part 3 | Drainage | 0.49 | Work Completed |
| 48 | Municipal Traffic Park | Parks | 0.36 | Work Completed |
| 49 | Septage Treatment Plant for Palakkad Municipality | Sewerage/Septage | 7.95 | Work Completed |
| 50 | Construction of paved footpatlh along English Church road to BEM School Jn. | Urban Transport | 0.35 | Work Completed |
| 51 | Construction of paved Footpath along Stadium - Bypass IMA Road | Urban Transport | 0.82 | Work Completed |
| 52 | Nila Nagar Park | Parks | 0.3 | Work Completed |
| 53 | Ganesh nagar - Kalpathy | Parks | 0.25 | Work Completed |
| 54 | Nurani park | Parks | 0.29 | Work Completed |
| 55 | Mythri nagar park - Kaikuthuperamnbu | Parks | 0.27 | Work Completed |
| 56 | Meena Nagar park | Parks | 0.46 | Work Completed |
| 57 | Sriram park | Parks | 0.23 | Work Completed |
| 58 | Construction of drain Nurani Jn tokaikuthupermbu via Porikkara theruv | Drainage | 0.14 | Work Completed |
| 59 | Venkiteshwara Garden | Parks | 0.24 | Work Completed |
| 60 | Gandhi Nagar- Chakkanthara | Parks | 0.2 | Work Completed |
| 61 | Vandana Layout | Parks | 0.14 | Work Completed |
| 62 | Rose Garden | Parks | 0.28 | Work Completed |
| 63 | Jaladha Nagar | Parks | 0.23 | Work Completed |
| 64 | Salamath nagar | Parks | 0.32 | Work Completed |
| 65 | Robinson Road Footpath | Urban Transport | 0.59 | Work Completed |
| 66 | Olavakkode Junction to Railway Station footpath | Urban Transport | 0.39 | Work Completed |
| 67 | Mission School - Sakunthala Junction foot path | Urban Transport | 0.48 | Work Completed |
| 68 | Parking infront of Chinmay Mission | Urban Transport | 0.37 | Work Completed |
| 69 | Pattikkara byepass Parking | Urban Transport | 0.27 | Work Completed |
| 70 | GB Road Escalator phase 2 | Urban Transport | 4.25 | Work Completed |
| 71 | Vadakkanthara- Valiyakulam- Pranamkulam- Indrani Nagar | Drainage | 0.48 | Work Completed |
| 72 | Selvi Nagar - Ram Nagar | Drainage | 0.19 | Work Completed |
| 73 | Head Post office to Ramanadhapuram via Koppam | Drainage | 0.49 | Work Completed |
| 74 | Chakkanthara- Kaikuthparambu- Venkiteshwaragarden- Sreenivasa Garden | Drainage | 0.49 | Work Completed |
| 75 | Tharekkad junction - Koppam | Drainage | 0.32 | Work Completed |
| 76 | Housing Board Colony- Mathrubhumi | Drainage | 0.5 | Work Completed |
| 77 | Municipal Bus stand to Vettilakulam | Drainage | 0.37 | Work Completed |
| 78 | Puthur Temple- Kallepully Junction | Drainage | 0.49 | Work Completed |
| 79 | Vennakkara- Thirunellayi | Drainage | 0.49 | Work Completed |
| 80 | Mercy College- Thirunellayi | Drainage | 0.49 | Work Completed |
| 81 | Green Garden- Othungodu- Kallikkad | Drainage | 0.45 | Work Completed |
| 82 | Around District Hospital | Drainage | 0.43 | Work Completed |
| 83 | Sulthanpetta- Kalmandapam- NH Road Drain Desilting and rejuvenation | Drainage | 0.46 | Work Completed |
| 84 | Victoria College- Vidyut Nagar- Indrani Nagar Thodu | Drainage | 0.23 | Work Completed |
| 85 | Puthupalli theruv- Slaughter House- Mythri Nagar | Drainage | 0.42 | Work Completed |
| 86 | Kalmandapam- Chittoor Road | Drainage | 0.47 | Work Completed |
| 87 | Chirakkad- Gopal colony | Drainage | 0.25 | Work Completed |
| 88 | Yakkara- Murikkav- AKG Nagar | Drainage | 0.3 | Work Completed |
| 89 | Palayapetta- Stadium Bypass | Drainage | 0.31 | Work Completed |
| 90 | Stadium bypass- Sreekrishna Temple- Vaaliparambu | Drainage | 0.46 | Work Completed |
| 91 | Murukani School Thodu | Drainage | 0.12 | Work Completed |
| 92 | Sekharipuram- Sankhuvaramedu | Drainage | 0.38 | Work Completed |
| 93 | Manalai- Ramanadhapuram- Aanachira | Drainage | 0.49 | Work Completed |
| 94 | Mattumantha Palayam - Chulliyodu storm water drain | Drainage | 0.49 | Work Completed |
| 95 | Constuction of OHSR 2 Nos , total 60.5 LL capacity | Water Supply | 14 | Work Completed |
| 96 | Replacement of raw water and clear water pump set, transformers and electrification | Water Supply | 4 | Work Completed |
| 97 | Providing new DI pipeline of 600mm MUthanthara to Kalmandapam | Water Supply | 4.56 | Work Completed |
| 98 | Providing new DI pipeline of 600mm Puthur to Moothanthara | Water Supply | 5.44 | Work Completed |
| 99 | Eshwar Garden Park (ward 15) | Parks | 0.45 | Work Completed |
| 100 | Ramadevi Nagar Park | Parks | 0.34 | Work Completed |
| 101 | Aiswarya Nagar Park | Parks | 0.24 | Work Completed |
| 102 | Kasim colony park | Parks | 0.25 | Work Completed |
| 103 | Kotta Maidanam and Cheriya Kottamaidanam Rejuvanation | Parks | 1 | Work Completed |
| 104 | construction of 45 MLD at Malampuzha KWA Compund and booster station and demolishion of old booster & sump in palakad Municipality | Water Supply | 22.26 | Work Completed |
| 105 | Providing flow meter at clear water pumping main to quantify and reduce NRW | Water Supply | 0.5 | Work Completed |
| 106 | New pumping main-From Malampuzha WTP to Mattumantha DI- K9 pipe 600 mm - 2850 m | Water Supply | 6.26 | Work Completed |
| 107 | Krishnaswamy Iyer Park | Parks | 0.23 | Work Completed |
| 108 | Dr Krishnan park | Parks | 0.39 | Work Completed |
| 109 | Parking near CSI hostel | Urban Transport | 0.04 | Work Completed |
| 110 | Melamuri- Kalmandapam foot path | Urban Transport | 2.6 | Work Completed |
| 111 | Bus shelters for Palakkad City | Urban Transport | 0.41 | Work Completed |
| 112 | Bus stand yard | Urban Transport | 2.78 | Work Completed |
| 113 | GB road escalator | Urban Transport | 1.6 | Work Completed |
| 114 | Olavakkode- Near co operative | Drainage | 0.45 | Work Completed |
| 115 | Kunnathoor medu drain | Drainage | 0.5 | Work Completed |
| 116 | Maettupalayam street drain | Drainage | 0.46 | Work Completed |
| 117 | Robinson road drain | Drainage | 0.28 | Work Completed |
| 118 | GB road to Noorjahan secondary drain | Drainage | 0.43 | Work Completed |
| 119 | Vadakkanthra road secondary drain | Drainage | 0.48 | Work Completed |
| 120 | Sasthri nagar- PVR nagar- Anjali gardens | Drainage | 0.21 | Work Completed |
| 121 | Mattumantha – palayam - Chuliyodu | Drainage | 0.35 | Work Completed |
| 122 | Manakka Thodi secondary drain | Drainage | 0.46 | Work Completed |
| 123 | Selvinagar thodu | Drainage | 0.33 | Work Completed |
| 124 | Kaalambuzha thodu | Drainage | 0.29 | Work Completed |
| 125 | Mission school | Drainage | 0.18 | Work Completed |
| 126 | Poolakkad | Drainage | 0.17 | Work Completed |
| 127 | Karukoodi | Drainage | 0.47 | Work Completed |
| 128 | Chakkamthara- Kaikuthu parambu | Drainage | 0.29 | Work Completed |
| 129 | New colony | Drainage | 0.5 | Work Completed |
| 130 | Karim Nagar | Drainage | 0.47 | Work Completed |
| 131 | Kallikkadu | Drainage | 0.38 | Work Completed |
| 132 | Sree Rama Palayam | Drainage | 0.36 | Work Completed |
| 133 | Arayakulam | Drainage | 0.46 | Work Completed |
| 134 | Chadana Kurissi | Drainage | 0.29 | Work Completed |
| 135 | Selva palayam- Indira Nagar | Drainage | 0.27 | Work Completed |
| 136 | Thirunellayi Manappullikkavu Thodu | Drainage | 0.49 | Work Completed |
| 137 | Construction of 16 LL OHSR at kalmandapam KWA & Demolishing existing 15LL OHSR palakkad municipality - 2016-17 | Water Supply | 3 | Work Completed |
| 138 | Victoria college to Anju vilakku ( sulthan petta) pedestrian network | Urban Transport | 1.98 | Work Completed |
| 139 | FOB at Mission high school Junction | Urban Transport | 0.49 | Work Completed |
| 140 | FOB at Victoria College Junction | Urban Transport | 0.47 | Work Completed |
| 141 | FOB at Mayins Girls high school Junction | Urban Transport | 0.55 | Work Completed |
| 142 | Providing pedestrian network and bicycle tracks on both sides of college road (100 ft road) | Urban Transport | 7.3 | Work Completed |
| 143 | Rejuvenation of drains at housing board colony, Mattumantha, Shekaripuram junction and construction of tertiary drains. | Drainage | 3 | Work Completed |
| 144 | Rejuvenation of drains around Sakunthala junction and construction of tertiary drains | Drainage | 0.4 | Work Completed |
| 145 | Widening of Manappullikkav Thirunellayi stream and construction of culvert | Drainage | 0.48 | Work Completed |
| 146 | Kalvakulam thodu rejuvanation | Drainage | 0.49 | Work Completed |