| S.No. | Project Title | Project Type | Project Cost (in ₹ Cr.) |
Milestone |
|---|---|---|---|---|
| 1 | Survey and GIS Mapping of Storm Water Drainage, Sewerage Network & Assets, Water Supply network & Assets in Kochi Municipal Corporation | Water Supply | 1.19 | Work Completed |
| 2 | Improving Production capacity of 100 MLD WTP- Supply and fixing of VT pump sets at RWPH, Pazhoor and interconnection | Water Supply | 4.6 | Work Completed |
| 3 | Improving water supply to Mundamveli - feeder line from Karuvelippady PH to Mundamveli church - Manassery church and replacement of old and damaged pipes | Water Supply | 7.18 | Work Completed |
| 4 | Laying new 160mm PVC pipe at Chittoor road instead of old Cl pipe and Britoly pipe in Div 39,40 & 42 (old) of Kochi Corporation | Water Supply | 1.21 | Work Completed |
| 5 | Improving the water supply at Vinoba nagar- laying distribution pipe from K.P.Vallon road | Water Supply | 0.5 | Work Completed |
| 6 | Replacement of old and damaged AC/GI pipe and extension of distribution lines in division no 1 to 10 and 23 to 28 | Water Supply | 4 | Work Completed |
| 7 | Providing FHTC to the existing completed schemes in Kochi Corporation division no 1 to 28(new) | Water Supply | 11.08 | Work Completed |
| 8 | Improvement of WS to divisions no. 13 to 20 - replacement of old pipes and improvements in pumping system, renovation of pump house | Water Supply | 5.7 | Work Completed |
| 9 | Replacement of old and damaged pipes at Vathuruthy colony in division 30 | Water Supply | 0.92 | Work Completed |
| 10 | Replacement of old AC pipe from Kathrikadavu over bridge (Kumaranassan junction) to Karshaka road | Water Supply | 2.5 | Work Completed |
| 11 | Improving the water supply to Ashoka road - replacing the old and damaged pipe | Water Supply | 2 | Work Completed |
| 12 | Replacing old damaged primo pipe, laying rider line from shipyard quarters road to K.P. Vallon road and laying distribution pipe from Thevara market bridge | Water Supply | 4.51 | Work Completed |
| 13 | Improving water supply to divisions 33,71 and 72-Replacing old and damaged 100 mm AC pipes in Thannikkal -Keerthinagar road and Perumbotta road | Water Supply | 1 | Work Completed |
| 14 | Supplying and fixing 25 Tonne EOT crane at Pazhoor RWPH | Water Supply | 0.4 | Work Completed |
| 15 | Fixing of new pump set and laying of additional pumping line from WTP to tanker filling point and allied works | Water Supply | 0.55 | Work Completed |
| 16 | Construction of drain and flooring work at tanker filling point | Water Supply | 0.65 | Work Completed |
| 17 | Pressure Grouting to arrest the leakage of clarifier at the WTP allied works | Water Supply | 0.5 | Work Completed |
| 18 | Supply and fixing of valves of various sizes at Maradu WTP | Water Supply | 0.3 | Work Completed |
| 19 | Interconnection of existing 1100 mm MS with 800 mm DI at Thevara | Water Supply | 0.6 | Work Completed |
| 20 | Construction of G Smarakam Park | Parks | 3.07 | Work Completed |
| 21 | Footpath along various roads viii Footpath along moolamkuzhy beach road,Moolamkuzhy | Urban Transport | 1.1 | Work Completed |
| 22 | Footpath along various Roads -Walkway along Stadium Link Road | Urban Transport | 1.28 | Work Completed |
| 23 | Footpath along various roads v1 Footpath along both sides of Chambakara canal | Urban Transport | 0.63 | Work Completed |
| 24 | Footpath along various roads v Walkway along Karanakodam thodu (Kathrikadavu to pipe line) | Urban Transport | 1.04 | Work Completed |
| 25 | Footpath along various roads iv Footpath along Kadavanthra to K.V School & Market | Urban Transport | 1.33 | Work Completed |
| 26 | Footpath along various roads iii.Walkway along Panorama road on both side of canal | Urban Transport | 0.83 | Work Completed |
| 27 | Footpath along various roads ii.Foot path along Nazarath- Janatha-Jubile Road-both sides | Urban Transport | 1.21 | Work Completed |
| 28 | Footpath along various roads i.Construction of walkway from Petta junction to Gandhi square both sides | Urban Transport | 1.39 | Work Completed |
| 29 | Development of Pambayimoola Indiraghandi Road junction | Urban Transport | 1.16 | Work Completed |
| 30 | RENOVATION OF VARIOUS DRAINS - viii REJUVENATION OF DRAINS FROM KAPPALANDI MUKKU TO PANAYAPPILLY IN JEW TOWN | Drainage | 0.2 | Work Completed |
| 31 | RENOVATION OF VARIOUS DRAINS - vii DRAIN AT PARAYAMPILLY NEAR AMRUTHA HOSPITAL - KUNNUMPURAM | Drainage | 0.44 | Work Completed |
| 32 | RENOVATION OF VARIOUS DRAINS - vi PUTHUKALAVATTOM ELAMAKARA DRAIN REPAIR | Drainage | 0.57 | Work Completed |
| 33 | RENOVATION OF VARIOUS DRAINS - v SIDE PROTECTION OF THURUTHELCHAL THODU CHAKKARAPARAMBA | Drainage | 0.24 | Work Completed |
| 34 | RENOVATION OF VARIOUS DRAINS - iv KIZHAVANA ROAD EAST DRAIN | Drainage | 0.1 | Work Completed |
| 35 | RENOVATION OF VARIOUS DRAINS - iii RENOVATION OF DRAINS AT VAT JUNCTION, KANOSA NAGAR, ILLIPARAMBU | Drainage | 0.32 | Work Completed |
| 36 | RENOVATION OF VARIOUS DRAINS - ii DRAIN FROM NORTH OVER BRIDGE TO LISSIE | Drainage | 0.72 | Work Completed |
| 37 | CONSTRUCTION OF FOOTPATH AT VARIOUS ROADS. V Footpath along Chittoor Road at Perandur | Urban Transport | 0.44 | Work Completed |
| 38 | CONSTRUCTION OF FOOTPATH AT VARIOUS ROADS. iii Footpath along Girinagar Club road | Urban Transport | 0.25 | Work Completed |
| 39 | CONSTRUCTION OF FOOTPATH AT VARIOUS ROADS. ii Footpath along the sides of TP Canal, Panambilly nagar | Urban Transport | 0.54 | Work Completed |
| 40 | REJUVANATION OF VARIOUS AREA DRAINS - x Side protection of Changadampokku thodu from Karukappilly ABAD towards north to BTS road & repair Valiyaparamba thodu and Keerthi nagar colony drains | Drainage | 0.87 | Work Completed |
| 41 | REJUVANATION OF VARIOUS AREA DRAINS - ix Joys thodu, Boundary thodu & Athirthy Thodu | Drainage | 0.48 | Work Completed |
| 42 | REJUVANATION OF VARIOUS AREA DRAINS - viii New construction of drainage from PF quarters to dry Thodu & Kumaranashan jn - St. sebastian church to dry Thodu | Drainage | 0.54 | Work Completed |
| 43 | REJUVANATION OF VARIOUS AREA DRAINS -vii Drain from Chilavannur road to Chilavannur River | Drainage | 0.46 | Work Completed |
| 44 | REJUVANATION OF VARIOUS AREA DRAINS -vi Drain both sides of Konthuruthy road from Thevara Mattammal Juncion towards East and Mattammal Junction to Thevara College | Drainage | 0.71 | Work Completed |
| 45 | REJUVANATION OF VARIOUS AREA DRAINS -v Sub-drain to Punchathodu Vyttila | Drainage | 0.42 | Work Completed |
| 46 | REJUVANATION OF VARIOUS AREA DRAINS -iv Drain along SRM road at Pachalam | Drainage | 0.12 | Work Completed |
| 47 | REJUVANATION OF VARIOUS AREA DRAINS -iii Drain along Mamangalam Anjumana road, Edappally Arakkakadavu road in Devankulangara&Karivelil road | Drainage | 0.69 | Work Completed |
| 48 | REJUVANATION OF VARIOUS AREA DRAINS -ii Renovation of drains along Kannanthodathu road, Tricovil Road | Drainage | 0.25 | Work Completed |
| 49 | RENOVATION OF CANAL AND SUB DRAINS - xiv PALLICHAL CANAL | Drainage | 0.64 | Work Completed |
| 50 | RENOVATION OF CANAL AND SUB DRAINS - xiii MANTRA CANAL | Drainage | 1.16 | Work Completed |
| 51 | RENOVATION OF CANAL AND SUB DRAINS - xii SAROVARAM DRAINAGE VITTILA | Drainage | 0.78 | Work Completed |
| 52 | RENOVATION OF CANAL AND SUB DRAINS - xi RENOVATION OF PERUVELITHODU, KARUPPALLY THODU & PUNATHIL PADAM THODU | Drainage | 1.23 | Work Completed |
| 53 | RENOVATION OF CANAL AND SUB DRAINS - x RENOVATION OF DRAIN ALONG TKC ROAD | Drainage | 0.34 | Work Completed |
| 54 | RENOVATION OF CANAL AND SUB DRAINS -ixRENOVATION OF CHANGADAMPOKKU THODU (GEORGE EDEN ROAD TO AMMU SAHIB ROAD AND NATIONAL PUBLIC SCHOOL RAOD TO MAMAMANGALAM POTTAKUZHI ROAD) | Drainage | 1.74 | Work Completed |
| 55 | RENOVATION OF CANAL AND SUB DRAINS - viiiRENOVATION OF VALIYA THODU - GANDHI SQUARE JAWAHAR ROAD WEST SIDE AND THODU ALONG AYYNKALI ROAD | Drainage | 0.82 | Work Completed |
| 56 | RENOVATION OF CANAL AND SUB DRAINS - vii RENOVATION OF PALARIVATTAM THAMMANAM THODU | Drainage | 1.4 | Work Completed |
| 57 | RENOVATION OF CANAL AND SUB DRAINS - vi DRAIN FROM WATERLAND TO CHIRAKKAL PUZHA - PULLARDESHAM & CHIRAKKAL PUZHA | Drainage | 0.38 | Work Completed |
| 58 | RENOVATION OF CANAL AND SUB DRAINS - vi SUB DRAIN OF PASHNITHODU | Drainage | 0.27 | Work Completed |
| 59 | RENOVATION OF CANAL AND SUB DRAINS - v REJUVENATIONOF KANICHAT THODU | Drainage | 0.34 | Work Completed |
| 60 | RENOVATION OF CANAL AND SUB DRAINS -iv REJUVENATION & DESILTING AND REPAIRS OF EARANAD AND KATTATHRA THODE AT KONAM AREA & | Drainage | 0.72 | Work Completed |
| 61 | RENOVATION OF CANAL AND SUB DRAINS -iii REJUVENATION OF SUB DRAINS OF PURANDUR CANAL AT POTTAKUZHY | Drainage | 0.18 | Work Completed |
| 62 | RENOVATION OF CANAL AND SUB DRAINS -ii CONSTRUCTION OF DRAINAGE AT MATTANCHERY SYNAGOG, MATTANCHERY PALACE AND MATTANCHERY BOAT JETTY | Drainage | 1.44 | Work Completed |
| 63 | CONSTRUCTION OF FOOTPATH ALONG K.P VALLON ROAD | Urban Transport | 1.53 | Work Completed |
| 64 | CONSTRUCTION OF FOOTPATH ALONG SUBASH CHANDRA BOSE ROAD | Urban Transport | 2.3 | Work Completed |
| 65 | Construction and Rejuvanation of Stadium link road Drain | Drainage | 1.98 | Work Completed |
| 66 | VYPIN JETTY GREEN SPACE DEVELOPMENT | Parks | 0.93 | Work Completed |
| 67 | RENOVATION OF MYTHRY NAGAR PARK | Parks | 0.7 | Work Completed |
| 68 | Construction of footpath and bus bays including junction development at Thevara junction | Urban Transport | 1.28 | Work Completed |
| 69 | Construction of footpath and bus bays including junction development at Thoppumpady | Urban Transport | 1.33 | Work Completed |
| 70 | RENOVATION OF VARIOUS DRAINS -1. LISIE JN. TOKOTTEKANAL | Drainage | 0.54 | Work Completed |
| 71 | Rejuvenation of Karanakodam Thodu | Drainage | 2.83 | Work Completed |
| 72 | Rejuvenation of Mangalavanam thodu | Drainage | 0.22 | Work Completed |
| 73 | Construction of drain along St. Vincent road | Drainage | 0.7 | Work Completed |
| 74 | Drain near Thrithwam | Drainage | 0.38 | Work Completed |
| 75 | RENOVATION OF RAIL NAGAR THODU | Drainage | 0.85 | Work Completed |
| 76 | Construction drain along Kaloor Kathrukadavu road (old) | Drainage | 0.82 | Work Completed |
| 77 | Rejuvenetio of Binni thodu div-13 | Drainage | 0.56 | Work Completed |
| 78 | Construction of new drain along Kochacko road, athiparambu road and masjid road Div-45 | Drainage | 0.62 | Work Completed |
| 79 | Rejuvenetion of Kannachan thodu and drain along Mathai manjooran road - Div-68 | Drainage | 1.2 | Work Completed |
| 80 | Reguvenation of Kalluchira Valiya Canal div-19 | Drainage | 0.51 | Work Completed |
| 81 | RENOVATION OF DRAIN UP TO PAMBAYIMOOLA EAST SIDE OF PASHNITHODU | Drainage | 1.62 | Work Completed |
| 82 | Renovation of Rameswaram Canal | Drainage | 2.58 | Work Completed |
| 83 | Renovation of Pandarachal canal second phase | Drainage | 2.8 | Work Completed |
| 84 | Replacement of Damaged service connections -5000 nos | Water Supply | 5 | Work Completed |
| 85 | Laying 400MM DI K9 pipeline from Perumanoor to Ravipuram for a length of 1270m | Water Supply | 4.4 | Work Completed |
| 86 | Construction of 40LL capacity OHSR at Kaloor | Water Supply | 24.27 | Work Completed |
| 87 | Construction of 25LL OHSR at Karuvelippady | Water Supply | 11.65 | Work Completed |
| 88 | Construction of 13LL Capacity OHSR at Edakochi | Water Supply | 6 | Work Completed |
| 89 | RENOVATION OF PARK- 1. KUDUMBICOLONY GREEN SPACE | Parks | 0.71 | Work Completed |
| 90 | CONSTRUCTION OF FOOTPATH AT VARIOUS ROADS- 1. PIPELINE JN. TO SAMSKARA JN. | Urban Transport | 0.48 | Work Completed |
| 91 | REJUVENATION OF VARIOUS DRAINS-1. DRAIN REPAIR ALONG CHENNANKULANGARA ROAD | Drainage | 0.27 | Work Completed |
| 92 | RENOVATION OF CANAL AND SUB DRAINS-1.VIVEKANANDA THODU | Drainage | 0.93 | Work Completed |
| 93 | Implementation of decentralised sewerage system - Division 16 | Sewerage/Septage | 22.02 | Work Completed |
| 94 | Construction of 10L litre OH tank at Thevara. | Water Supply | 5.6 | Work Completed |
| 95 | Construction of 15LL OHSR and 2LL at Vadathode, Cheranallur | Water Supply | 7.75 | Work Completed |
| 96 | Laying rider line from Kathrukadavu to Elamkulam, Chittighira, Ponnurunni areas & distribution lines in Chakkaraparambu, Chalikkavattom areas | Water Supply | 3.65 | Work Completed |
| 97 | Laying pumping main 500mm DI pipe from JnNURM WTP at Maradu to pump house at Thammanam for additional pimping of water (upto 18MLD)to Kochi city IN Kochi Corporation 2016-17 | Water Supply | 22.5 | Work Completed |
| 98 | LAYING OF 450 mm DI PIPE FROM NORTH END OF AROOR -EDAKOCHI BRIDGE TO KWA WATER TANK SITE AT EDAKOCHI | Water Supply | 1.67 | Work Completed |
| 99 | Laying transmission main from Kathrukadavu to Pachalam. | Water Supply | 10.7 | Work Completed |
| 100 | Construction of 17LL OHSR and CWR at Pachalam | Water Supply | 8.54 | Work Completed |
| 101 | Laying 500mm DI line from pump house at Thammanam to OHSR at Kadavanthara | Water Supply | 9.54 | Work Completed |
| 102 | Replacement of old damaged pipeline along Konthuruthy Branch Road | Water Supply | 0.82 | Work Completed |
| 103 | Replacement of old damaged pipe line from Valanjambalam to Ravipuram | Water Supply | 0.66 | Work Completed |
| 104 | Replacement old damaged pipeline along Pandit Karuppan road | Water Supply | 1.75 | Work Completed |
| 105 | Rejuvenation of Sewerage Treatment Plant at Elamkulam, Kochi | Sewerage/Septage | 16.52 | Work Completed |
| 106 | Augmentation of Kochi WSS, Improvents of water supply to western Kochi area- construction of 15L GL Tank at Karuvelipady | Water Supply | 3.2 | Work Completed |
| 107 | Renovation Of St. John Park | Parks | 0.39 | Work Completed |
| 108 | CONSTRUCTION &REJUVENATION OF MG ROAD (ATLANTIS TO THEVARA) | Urban Transport | 2.03 | Work Completed |
| 109 | Construction Of Foot Path -1.Foot path from Jose junction to Atlantis at MG Road | Urban Transport | 2 | Work Completed |
| 110 | REJUVENATION OF THEVARA-PERANDUR CANAL | Drainage | 20 | Work Completed |
| 111 | Rejuvenation Of Major Canals -1. Pashnithodu Canal | Drainage | 2.24 | Work Completed |
| 112 | Replacement of existing distribution cum pumping main with 600mm DI rider pumping main from Karuvelipadi to Kovappadam | Water Supply | 3.851 | Work Completed |
| 113 | Rain water Harvesting | Water Supply | 1.33 | Work Completed |