| S.No. | Project Title | Project Type | Project Cost (in ₹ Cr.) |
Milestone |
|---|---|---|---|---|
| 1 | Survey and GIS Mapping of Storm Water Drainage, Sewerage Network & Assets, Water Supply Network & Assets in Thrissur Corporation | Water Supply | 1.66 | Work Completed |
| 2 | Improving Water Supply distribution network by pipeline extension at various wards in Thrissur Corporation | Water Supply | 7.02 | Work Completed |
| 3 | Supplying and Installing of Centralised AC at Skywalk | Urban Transport | 1.15 | Work Completed |
| 4 | WET Upgradation | Water Supply | 12.86 | Work Completed |
| 5 | Side covering and false ceiling work of Skywalk | Urban Transport | 2.5 | Work Completed |
| 6 | Construction of Multilevel car parking at General Hospital Thrissur | Urban Transport | 1 | Work Completed |
| 7 | Construction of multilevel car parking at Thrissur Corporation office | Urban Transport | 0.88 | Work Completed |
| 8 | WET electrical work - Electrical service connection to smart water meter | Water Supply | 0.75 | Work Completed |
| 9 | EMS PARK | Parks | 0.35 | Work Completed |
| 10 | Rejuvenation of pond-Construction of retaining wall at Pallikulam | Water Supply | 1 | Work Completed |
| 11 | Installation of solar panel at Skywalk | Urban Transport | 1 | Work Completed |
| 12 | Supplying and installing of lift for Skywalk | Urban Transport | 1.35 | Work Completed |
| 13 | AMRUT- Supply and laying of 800 mm DI K9 pipe (Additional CWGM-18.70 KM) from Peechi WTP to OHSR at Thekkinkad Maidan,Thrissur | Water Supply | 75.34 | Work Completed |
| 14 | Providing FHTC to Households in Thrissur Corporation area | Water Supply | 7 | Work Completed |
| 15 | Interior works of Command Centre for Water Efficient Thrissur project | Water Supply | 0.1 | Work Completed |
| 16 | Rejuvenation of Pottakkulam Park, Div- 14 | Parks | 0.05 | Work Completed |
| 17 | Shifting of service connections, providing scour valves, control valves and interlinking of new lines with old lines | Water Supply | 1.75 | Work Completed |
| 18 | Work 95- Project for Thrissur Municipal Corporation Phase -3 Div 35 Drain from Erattachira Temple to Shaktan stand | Drainage | 1.4 | Work Completed |
| 19 | Project for Thrissur Municipal Corporation Phase -3 , Supplying & Installing 4 nos of lifts for Skywalk at Saktan Nagar | Urban Transport | 1.2 | Work Completed |
| 20 | Rejuvenation of Jawans Park Park, Div- 51 | Parks | 0.3 | Work Completed |
| 21 | Rejuvenation of GouriLankesh Park, Div-21 | Parks | 0.1 | Work Completed |
| 22 | Rejuvenation of Vivekananda Park, Div 36 | Parks | 0.2 | Work Completed |
| 23 | Work 101- Project for Thrissur Municipal Corporation Phase -3, Div-38,Drain along Poothol road | Drainage | 0.4 | Work Completed |
| 24 | Work 100- Project for Thrissur Municipal Corporation Phase -3, Div-19 ,Drain from Kalathodu Junction to petrol pump | Drainage | 0.2 | Work Completed |
| 25 | Work 99- Project for Thrissur Municipal Corporation Phase -3, Div-23 ,Vazhappilly Lane culvert | Drainage | 0.07 | Work Completed |
| 26 | Work 98- Project for Thrissur Municipal Corporation Phase -3, Div- 9 ,Drain along Ramavarmapuram road opposite to Vimala College campus | Drainage | 0.18 | Work Completed |
| 27 | Work 97- Project for Thrissur Municipal Corporation Phase -3 Providing hand rail to the footpath of four roads near skywalk at Saktan Nagar | Urban Transport | 0.2 | Work Completed |
| 28 | Work 96- Project for Thrissur Municipal Corporation Phase -3 Div 35 Drain and culvert near Mannadiar hotel | Drainage | 0.4 | Work Completed |
| 29 | Work 94- Project for Thrissur Municipal Corporation Phase -3, Div- 45 , Culvert and Drain at Swamipalam | Drainage | 0.16 | Work Completed |
| 30 | Work 93-AMRUT Urban transport phase-3 Dic 32-Chiyyaram south palakkal main road footpath. | Urban Transport | 0.13 | Work Completed |
| 31 | WORK 92-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3, (Footpath near FOB) | Urban Transport | 0.05 | Work Completed |
| 32 | WORK -91-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 34, south pentark flat -elite mission hosp ) | Urban Transport | 0.37 | Work Completed |
| 33 | WORK 89-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 34,Shakthan Nagar ) | Urban Transport | 0.21 | Work Completed |
| 34 | WORK 87-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 35, West Side of Shakthan ) | Urban Transport | 0.08 | Work Completed |
| 35 | WORK 80-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 32,CHIYYARAM SOUTH-PALAKKAL MAIN ROAD ) | Urban Transport | 0.26 | Work Completed |
| 36 | WORK 60-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 23 - Thoppe Stadium road ) | Urban Transport | 0.12 | Work Completed |
| 37 | WORK 59-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 23- Unity road 1 and Unity road 2) | Urban Transport | 0.05 | Work Completed |
| 38 | WORK 58-AMRUT URBAN TRANSPORT THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 3, Aswani Junction – Pattraikal – Girija Theatre – Viyyur bridge ) | Urban Transport | 0.77 | Work Completed |
| 39 | WORK 57-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 7,Cheroor Kinar Stop – Police Academy Stop ) | Urban Transport | 0.43 | Work Completed |
| 40 | WORK-56-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 35, Aristo Rd St Josephs Cemetry road -Fathima ChurchJn) | Urban Transport | 0.19 | Work Completed |
| 41 | WORK-55-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 35,Mundupalam Junction – Avenue, Aristo Road ) | Urban Transport | 0.18 | Work Completed |
| 42 | WORK-26-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION- Div 2, POOKKUNNAM Jn GHS School PATTURAIKKAL, FOOTPATH | Urban Transport | 0.18 | Work Completed |
| 43 | WORK-24-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION- Div 5, GOVT ENGINEERING COLLEGE Road, FOOTPATH | Urban Transport | 0.46 | Work Completed |
| 44 | WORK-23-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION- Div 1, SEETHARAMASWAMI TEMPLE, FOOTPATH | Urban Transport | 0.21 | Work Completed |
| 45 | WORK-22-AMRUT URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION- Div 37, SANKARANKULANGARA Temple Jn-ARAVIND COMPLEX MG ROAD,FOOTPATH | Urban Transport | 0.21 | Work Completed |
| 46 | WORK-86-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 52, west fort-achuthamenon rd-1&2 ) | Drainage | 0.53 | Work Completed |
| 47 | WORK-84-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 36,Machingal lane Road ) | Drainage | 0.17 | Work Completed |
| 48 | WORK 83-AMRUT SWD AND URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 36,Marar Road ) | Drainage | 0.14 | Work Completed |
| 49 | WORK-82-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 36,A R menon Road ) | Drainage | 0.29 | Work Completed |
| 50 | WORK-81-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div,12 )Keerankulangara pond back side road | Drainage | 0.1 | Work Completed |
| 51 | WORK 78-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase3(Div46, TS PARAMESWARAN ROAD ) | Drainage | 0.85 | Work Completed |
| 52 | WORK-77-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase3 (Div 50) Kezhakkepuram road | Drainage | 0.09 | Work Completed |
| 53 | WORK-76-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase3(Div 11,MUSEUM CROSS STREET ) | Drainage | 0.63 | Work Completed |
| 54 | WORK-75-AMRUT SWD AND URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 51,THOPPILMOOLA-KALVARI ) | Drainage | 0.41 | Work Completed |
| 55 | WORK 73-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 25,NEHRU NAGAR CHURCH-THIRUTHUR TEMPLE ROAD ) | Drainage | 0.54 | Work Completed |
| 56 | WORK-72-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 24, ND BRIDGE -JAVAHAR ) | Drainage | 0.27 | Work Completed |
| 57 | WORK-71-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 24, ANCHERI SCHOOL-VALARKAVU CENTER ROAD ) | Drainage | 0.28 | Work Completed |
| 58 | WORK 70-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 9,KUTTUMUKKU RD ) | Drainage | 0.38 | Work Completed |
| 59 | WORK-69-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 7,MANNUMUKODU VIMALA COLLEGE-CHERUTTA) | Drainage | 0.25 | Work Completed |
| 60 | wORK 68-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 7,KUTTUMUKKU VADAKKEVETTUVAZHI RD ) | Drainage | 0.2 | Work Completed |
| 61 | WORK-67-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 7,POLICE ACCADAMY OPP RD ) | Drainage | 0.2 | Work Completed |
| 62 | WORK 66-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 3(Div 7,CHEROOR KINAR STOP-POLICE ACADEMY Stop ) | Drainage | 0.94 | Work Completed |
| 63 | WORK-65-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase3(Div 37, CHAKKAMUKKU CENTR-KOTTAPPURAM MAIN ROAD WESTEND SUPR MARKT- VANIYAN LANE ) | Drainage | 1 | Work Completed |
| 64 | WORK 62-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase3(Div 2,PUKUNNAM TO PATTURAIKAL ROAD ), | Drainage | 0.15 | Work Completed |
| 65 | WORK 54-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 31, OLLUR CHURCH-CONVENT ROAD,CONVENT ROAD,PALLINADA ROAD PART 1,PALLINADA ROAD PART 2 ) | Drainage | 0.99 | Work Completed |
| 66 | WORK-52-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 23,Thottanpetta Road ) | Drainage | 0.04 | Work Completed |
| 67 | WORK-51-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 23,Thoppe Stadium Ground Road ) | Drainage | 0.04 | Work Completed |
| 68 | WORK 50-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 23,Thottathil Lane ) | Drainage | 0.05 | Work Completed |
| 69 | WORK-48-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 23,Unity Road Part 1 & 2 | Drainage | 0.2 | Work Completed |
| 70 | WORK-47-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 23,Pallikkulam Road ) | Drainage | 0.09 | Work Completed |
| 71 | WORK-46-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION-(Div 23 ,PC THOMAS ROAD) | Drainage | 0.6 | Work Completed |
| 72 | WORK-44-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 20, Jesus Lane Road ,Alukka Angadi Road ,Nazerth Angadi Road ) | Drainage | 0.88 | Work Completed |
| 73 | WORK-43-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 20, Paravattani Nellikkunnu Jn ) | Drainage | 0.31 | Work Completed |
| 74 | WORK-42-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 9,Kuttumukku Road ) | Drainage | 0.11 | Work Completed |
| 75 | WORK-41-AMRUT SWD AND URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 9,Cheroor school-Cherutta Road ) | Drainage | 0.42 | Work Completed |
| 76 | WORK-40-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 4,Viyyur Pandikkavu-Peringavu Canal ) | Drainage | 0.27 | Work Completed |
| 77 | WORK 39-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div ,Peringavu -Cheroor Road ) | Drainage | 0.09 | Work Completed |
| 78 | WORK-37-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION-(Div 5,THRISSUR GOVERNMENT ENGG COLLEGE ROAD) | Drainage | 1.97 | Work Completed |
| 79 | WORK-36-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 4,Viyyur Aduthodu ) | Drainage | 0.45 | Work Completed |
| 80 | WORK-35-AMRUT SWD AND URBAN TRANSPORT PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div4, Viyyur Companypadi-Manalarukavu Temple Road,Power House - Viyyur Jail- Padukkadu ) | Drainage | 0.5 | Work Completed |
| 81 | WORK-34-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 1,Kuruvath Lane) | Drainage | 0.21 | Work Completed |
| 82 | WORK-33-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 2 (Div 1,Jayaprakash Lane) | Drainage | 0.07 | Work Completed |
| 83 | WORK 32-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION-PHASE 2 (Div 1 JAYAPRAKASH ROAD) | Drainage | 0.13 | Work Completed |
| 84 | WORK-31-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION- Div UDAYANAGAR NO9 DRAIN PHASE-2 | Drainage | 0.2 | Work Completed |
| 85 | WORK 28 -AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION- Div 01, SEETHARAMASWAMY TEMPLE ROAD, DRAIN | Drainage | 0.65 | Work Completed |
| 86 | wORK-27-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION(DIV 1, )Ramnagar Rd | Drainage | 0.64 | Work Completed |
| 87 | WORK-20-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION, PHASE 1 (Div 38. Jayalaksmi-Railway station) | Drainage | 0.57 | Work Completed |
| 88 | WORK-19-AMRUT SWD AND PROJECT FOR THRISSUR MUNICIPAL CORPORATION, PHASE 1 (Div 23. Fathima church Jn 1,ST.JOSEPH CEMETERY RD ) | Drainage | 0.41 | Work Completed |
| 89 | WORK18-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION, PHASE 1 (Div 35. Mundupalam Junction -Avenue Rd-Aristo Rd Part 1,Mundupalam Junction -Avenue Rd-Aristo Rd Part 2) | Drainage | 0.51 | Work Completed |
| 90 | WORK-17-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION, PHASE 1(, Div 35. WEST SIDE OF SAKTHAN BUS STAND) | Drainage | 0.24 | Work Completed |
| 91 | WORK-16-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION, PHASE 1( DIV 34. Thankamani Bus Stop) | Drainage | 0.27 | Work Completed |
| 92 | WORK 15-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION, PHASE 1(Div 34. Shakthan nagar) | Drainage | 0.62 | Work Completed |
| 93 | WORK-14-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase1 (Div 34. POST OFFICE , LIC JUNCTION ) | Drainage | 0.6 | Work Completed |
| 94 | WORK-13-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 1 (Div 34. POST OFFICE - BALIYA THODU) | Drainage | 0.42 | Work Completed |
| 95 | WORK-12-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION, PHASE 1( DIV 34. SOUTH PENTARK FLAT -ELITE MISSION HOSP) | Drainage | 0.5 | Work Completed |
| 96 | WORK-11-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION PHASE 1 (Div 34. METROPOLITAN HOSP-BALIYA THODU, Div 34. METROPOLITAN HOSP-BALIYA THODU) | Drainage | 0.45 | Work Completed |
| 97 | WORK-10-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 1(Div 33 PATTALA KINAR ROAD) | Drainage | 0.52 | Work Completed |
| 98 | WORK-8-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase1 (Div 33. PATTALA KINAR ROAD,ST. JOSEPH MODEL SCHOOL) | Drainage | 0.77 | Work Completed |
| 99 | WORK-7-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION, PHASE 1 (Div 20. Shastri Lane Part 1,Div 20. Shastri Lane Part 2) | Drainage | 0.33 | Work Completed |
| 100 | WORK-6-AMRUT SWD AND UT PROJECT FOR THRISSUR MUNICIPAL CORPORATION-PHASE 1(Mannuthy-Palakkad ) | Drainage | 2.63 | Work Completed |
| 101 | WORK-5-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION-Phase 1 -( Div 28. Ancheri - Perivankulangara road - 1,2,3 + Netaji road - Motherland road - 2,3 + Kundolipadam road) | Drainage | 0.88 | Work Completed |
| 102 | WORK-4-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase1(Div 28. PUTHANAGADI ROAD) | Drainage | 0.18 | Work Completed |
| 103 | WORK-3-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase1(Div 28. SHANTI RD) | Drainage | 0.46 | Work Completed |
| 104 | WORK-2-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase1(Div 28. NETAJI RD- MOTHER LAND RD) | Drainage | 0.66 | Work Completed |
| 105 | WORK-1-AMRUT SWD PROJECT FOR THRISSUR MUNICIPAL CORPORATION Phase 1(Div 28. C V Kochunni road) | Drainage | 0.17 | Work Completed |
| 106 | Rejuvenation of Nehru Park, Division No.36,Thekkinkadu PHASE -2 | Parks | 0.4 | Work Completed |
| 107 | Subway at MO Road | Urban Transport | 1.16 | Work Completed |
| 108 | Panamkuttichira pakalveedu park | Parks | 0.33 | Work Completed |
| 109 | Renovation of Achutha Menon park | Parks | 0.35 | Work Completed |
| 110 | Rejuvenation of Nehru Park, Division No.36,Thekkinkadu-phase-3 | Parks | 0.8 | Work Completed |
| 111 | Skywalk at Shakthan Nagar | Urban Transport | 6.05 | Work Completed |
| 112 | WET- Water Efficient Thrissur | Water Supply | 5.59 | Work Completed |
| 113 | Floating Intake Structure at Peechi Reservoir | Water Supply | 5 | Work Completed |
| 114 | Construction of 5LL OHSR at Kuttanelloor with pumping system at Kuriyachira and pumping main for 4KM with 200 mm DI and 5KM distribution line | Water Supply | 9.05 | Work Completed |
| 115 | Construction of 10 LL OHSR at Anappara with Pumping system and pumping main from Cherur to Anappara- Improvement of water supply system in Div 6,7 and 8 of Thrissur corporation Part-2 | Water Supply | 5.8 | Work Completed |
| 116 | Construction of 10 LL OHSR at Anappara with Pumping system and pumping main from Cherur to Anappara- Improvement of water supply system in Div 6,7 and 8 of Thrissur corporation Part-1 | Water Supply | 8 | Work Completed |
| 117 | Instalation of generator at Peechi and dedicated power feeder line from 33KV substation Pattikkad to Peechi treatment plant | Water Supply | 2.6 | Work Completed |
| 118 | Laying of distribution lines from existing OHT at Kizhakumpattukara to Nellikunnu area for around 15 km with varing dia pipelines-(Dia 200 mm DI to 110 mm PVC | Water Supply | 5.74 | Work Completed |
| 119 | Construction of new 20 MLD WTP at Peechi Thrissur Corporation-Phase-2 | Water Supply | 3.08 | Work Completed |
| 120 | AMRUT - Zoning and mapping of water supply system of Thrissur Corporation - Supply and laying of various dia pipes Part 2 | Water Supply | 13.48 | Work Completed |
| 121 | Vanchikulam Park | Parks | 0.76 | Work Completed |
| 122 | Foot Over Bridge at Vadakke Bus stand | Urban Transport | 1.12 | Work Completed |
| 123 | AMRUT - Zoning and mapping of water supply system of Thrissur Corporation - Supply and laying of various dia pipes Part I | Water Supply | 8.26 | Work Completed |
| 124 | Replacement of AC/PVC pipe to 500 mm DI and 160 mm PVC pipes for around 42 km-Phase-2 | Water Supply | 11.13 | Work Completed |
| 125 | Construction of new 20 MLD WTP at Peechi Thrissur Corporation | Water Supply | 10.09 | Work Completed |
| 126 | Rejuvenation of Nehru Park, Division No.36,Thekkinkadu | Parks | 1.17 | Work Completed |
| 127 | Sewerage Treatment Plant of 360 KLD capacity at General Hospital Thrissur | Sewerage/Septage | 6.06 | Work Completed |
| 128 | Renovation of existing damaged pump house in Thrissur Corporation | Water Supply | 0.35 | Work Completed |
| 129 | Replacement of Ac Pipe To 200 mm DI and 160 mm PVC Pipes for around 42KM | Water Supply | 11.26 | Work Completed |
| 130 | Laying 350 mm DI K9 pipe from Chempukkavu Reservoir To Koorkanchery Sump | Water Supply | 3.71 | Work Completed |
| 131 | DESIGN CONSTRUCTION AND COMMISSIONING OF 3 MLD WTP ,RESERVOIR AND PUNPING MAIN FOR OLLUKARA ZONE | Water Supply | 5.42 | Work Completed |
| 132 | Construction of new OHSR of capacity 20LL at Ollur and Distribution Lines (varying dia) for 20KM | Water Supply | 13.96 | Work Completed |
| 133 | AMRUT- Supplying laying ,testing,commissioning and maintaining of 700 mm DI K9 raw water gravity main from Dam to aerator of 36 mld WTP at Peechi. | Water Supply | 1 | Work Completed |
| 134 | AMRUT-Supplying and fixing bulk flowmeters in the transmission mains under Thrissur Corporation area | Water Supply | 0.7 | Work Completed |
| 135 | AMRUT-Survey and replacing of faulty meters and pipe lines and providing new water connections in Thrissur Corporation area | Water Supply | 2.36 | Work Completed |