S.No. Project Title Project Type Project Cost
(in ₹ Cr.)
Milestone
1 Survey and GIS mapping of storm water drainage, sewerage network & assets, water supply network & assets in Thiruvanathapuram corporation Water Supply 2.4 Work Completed
2 Procurement of bucket cleaning machines and vehicle mounted sewer cleaning equipment Sewerage/Septage 4.75 Work Completed
3 Laying 150mm SW Sewer line towards Padayani gardens Association lane and laying PVC 160mm sewer lane towards Punartham gardens lane and padayani road Sewerage/Septage 0.13 Work Completed
4 Providing and laying 300 & 200mm SW Sewer line at Vinayaka Nagar, Arapura, Vattiyoorkavu, under Sewerage Section, Sasthamangalam-Reach 2 Sewerage/Septage 0.77 Work Completed
5 Providing and laying 300mm & 200mm SW Sewer line at Vinayaka Nagar, Arapura, Vattiyoorkavu, under Sewerage Section, Sasthamangalam, Reach 1 Sewerage/Septage 0.72 Work Completed
6 Providing and laying 200mm SW Sewer line at Jagathy Panchami Garden under Sewerage Section, Sasthamangalam Sewerage/Septage 0.15 Work Completed
7 Providing and laying 200mm SW Sewer line from house no MGRA 135 towards TKD road Marapalam, under Sewerage Section, Sasthamangalam Sewerage/Septage 0.09 Work Completed
8 Providng and laying 300 & 250mm SW Sewer line from Kalakoumudi road towards koyikkal lane in the side of pond , under Sewerage Sewerage/Septage 0.93 Work Completed
9 Providng and laying 200mm SW Sewer line at Parayil lane, Kanjirampara East Residence Association, Kanjirampara under Sewerage Section, Sasthamangalam Sewerage/Septage 0.35 Work Completed
10 Providng and laying 200mm SW Sewer line at Harismrithy lane, Kanjirampara East Residence Association, Kanjirampara under Sewerage Section, Sasthamangalam Sewerage/Septage 0.36 Work Completed
11 Providng and laying 250mm SW Sewer line at Kanjirampara East Residence Association (KERA),(MH 16-MH 30) under Sewerage Section, Sasthamangalam Sewerage/Septage 0.67 Work Completed
12 Providng and laying 250mm SW Sewer line at Kanjirampara East Residence Association (KERA),(MH 1-MH 15) under Sewerage Section, Sasthamangalam Sewerage/Septage 0.44 Work Completed
13 Construction of sewer Pumping station in Kollavila in B lock N- Ulloor Sewerage/Septage 3.08 Work Completed
14 Replacing of pipe lines at Arannoor ward-Pipe line work Water Supply 0.43 Work Completed
15 Replacing old pipe lines which are regularly breaking in Thuruthumoola ward and Peroorkada ward in Thiruvananthapuram Corporation under WW section Peroorkada-Pipe line work Water Supply 2.52 Work Completed
16 Replacing old pipe lines which are regularly breaking in Mannanthala and Nalanchira ward in Thiruvananthapuram Corporation under Peroorkada Section-Pipe line work Water Supply 1.98 Work Completed
17 Providing Sewerage Lines in various areas for connecting lines already laid in AMRUT 1.0 in block L,J,K and I, Sewerage/Septage 16.55 Work Completed
18 Providing FHTC for all wards (partial coverage as Phase 1) under Kazhakoottam KWA Section Water Supply 6.63 Work Completed
19 Alathara Mullapally road drain work Drainage 0.23 Work Completed
20 Panachamoodu road, SCT Nagar, Kulangara kulam, Pazaya Road, Kottara Lane, PT Chacko Nagar, Puthu Palli Road, Gorishapattom Road drain construction. Drainage 1 Work Completed
21 Sreechithira Thirunal Nagar Road drain work Drainage 0.68 Work Completed
22 Thalakonam Drain construction Drainage 0.47 Work Completed
23 Side slab and wall construction in Vivekananda Lane Drainage 0.3 Work Completed
24 Maintenance of drain in NSP Nagar, Lekshmi Nagar, Kavaloorkonam, Vyasa Nagar, Binoy bye lane, Thoppil Nagar, Minarva Lane, Sadhanandhan Road in Kesavadasapuram Drainage 1 Work Completed
25 Aavukulam SN Nagar road drain construction Drainage 0.31 Work Completed
26 Strom water Drainage work in Vattiyoorkavu Drainage 0.4 Work Completed
27 Kulashekaram Thamakkode Chira Drain construction Drainage 0.24 Work Completed
28 Rejuvenation of Azhamkonam Kulam Park in Punchakkari Ward Parks 0.67 Work Completed
29 Kamukarakonam Mulavoor Drain construction Drainage 0.15 Work Completed
30 Drain construction in Kunchuveedu Lane Drainage 0.56 Work Completed
31 Mud Pump -10 HP Sewerage/Septage 0.04 Work Completed
32 Drain near Veli tourist village Drainage 2 Work Completed
33 Mobile Toilet- 8 Toilet Set (Towing type) Sewerage/Septage 0.2 Work Completed
34 Drain from Vavarakkonam to Medical College Drainage 1.88 Work Completed
35 Drain from Back side of STP to Medical College Drainage 2.38 Work Completed
36 Procurement of Compact STP 100 KLD Units Including Network System Sewerage/Septage 6 Contract Awarded
37 Procurement of Mobile FSTP 6KL Sewerage/Septage 1.35 Work Completed
38 Procurement of Water Jet Cleaning cum Suction Vehicle Sewerage/Septage 1.62 Work Completed
39 Pipe laying works at various places of Kalady Ward-Pipe line work Water Supply 0.14 Work Completed
40 Pipe line extension works at various places of Mudavanmugal ward-Pipe line work Water Supply 0.64 Work Completed
41 Procurement of Septage Collection Vehicle- Suction type Sewerage/Septage 1.2 Work Completed
42 Replacing of old AC pipes and extension and alterations in Poojappura ward, Construction of valve chamber and raising of valve chamber-Pipe line work Water Supply 0.11 Work Completed
43 Replacing of old AC pipes and extension and alterations in Nedumcaud ward-Pipe line work Water Supply 0.1 Work Completed
44 Replacing of 80mm AC pipe lines to 110mm PVC pipe 6 kg/cm2 works at Sankar Nagar, Pappanamcode ward-Pipe line work Water Supply 0.23 Work Completed
45 Replacing of pipe lines at Ammaveedu line and interconnection at Studio road under Nemom ward-Pipe line work Water Supply 0.38 Work Completed
46 Replacing old pipe lines which are regularly breaking in Kinavoor ward in Thiruvananthapuram Corporation under Peroorkada Section-Pipe line work Water Supply 3.49 Work Completed
47 Dedicated feeder from Aruvikkara substation to kummi Water Treatment Plant and Kalathara Pump House Water Supply 2.1 Work Completed
48 Laying Transmission Main and sewer networks in Block L - Laying of 315mm dia HDPE transmission main from Ulloor Jn to SN Jn in Ulloor-Akkulam road by HDD Sewerage/Septage 2.6 Work Completed
49 Laying Transmission main and Sewer Networks in Block L- Laying of 315 mm dia HDPE Transmission main from Kumarapuram towards Kunjuveedu Jn of Poonthi Road by HDD Method Sewerage/Septage 3.08 Work Completed
50 Laying Transmission main and sewer networks in Block J (Karimanal) collection and conveyance system. (C) Inter connection sewer networks from trunk main manholes of both sides of the road from Arasumoodu. Sewerage/Septage 0.64 Work Completed
51 Laying Transmission main and sewer networks in Block J (Karimanal) collection and conveyance system. (B) Sewer network from bypass Jn (Kuzhivila) to MH3 of trunk main from Arasumoodu to Karimanal Pumping Station Sewerage/Septage 0.21 Work Completed
52 Laying Transmission main and sewer networks in Block J (Karimanal) collection and conveyance system. (A) Trunk main to Karimanal Sewerage/Septage 17 Work Completed
53 7.9.4 Replacement of 100mm AC pipes and laying 110mm PVC at Mankeezh line at Sreevaraham under Kuriathy section (Package 4) Water Supply 0.33 Work Completed
54 7.9.3 Providing new connection and alterations of house connection from JICA/JUNNRUM Project laid lines in Bheemapally, Bheemapally east and Manikavilakam wards under Kuriathy section (Package 3) Water Supply 0.36 Work Completed
55 7.9.2 Alteration of House connections to the JICA and Jnnurm line in Poonthura church area (Package 2) Water Supply 0.35 Work Completed
56 7.9.1 Alteration of House connections to the JICA and Jnnurm line in Cheriyamuttam area (Package 1) Water Supply 0.46 Work Completed
57 7.6 Laying transmission main and sewer network in Block L Edathara collection and conveyance system - Laying Sewer network by HDD method from MH 10 towards KIIMS Hospital (Package 6) Sewerage/Septage 3.36 Work Completed
58 Supply and Installation of Smart meters -Phase II Water Supply 1.02 Work Completed
59 Supply and installation of smart meters- Phase I Water Supply 1.27 Work Completed
60 9.13 TSS-Urgent laying of 300mm dia HDPE. pipe and construction of new manholes at Chengalloor and Vattavila of Punnakkamugal ward Sewerage/Septage 2.36 Work Completed
61 21.44 TSS- Rehabiliatation of sewer line at Thoppil lane, Valiyasala, Sasthri nagar West, cherukodu, Thelunguchettitheruvu area Sewerage/Septage 0.16 Work Completed
62 21.43 TSS- Rehabiliatation of sewer line at Melemankattukonam in Nedumcad ward Sewerage/Septage 0.24 Work Completed
63 21.42 TSS-Rehabilitation and upgradation of existing sewer network at Punnen road near secratariat and Mele Thampanoor area Sewerage/Septage 0.14 Work Completed
64 21.41 AMRUT SAAP 17-18 - TSS- Rehabilitation and up gradation of Existing sewer net work at TRWA area, Podiyadi lane, BRWA area Anil Nagar,Ayilliathu Finance road In Thalial area under sewerage Section No:2 Kuriathy Sewerage/Septage 0.4 Work Completed
65 21.40 TSS-Rehabilitation and upgradation of existing sewer network at Kunninpuram, vivekananda nagar, Kailas nagar, NM nagar area Sewerage/Septage 0.56 Work Completed
66 21.39 TSS-Rehabilitation and upgradation of existing sewer network at Thittakudi temple lane, Vadakkekottah, Puthunagar area Sewerage/Septage 0.56 Work Completed
67 21.38 upgradation of existing sewer network at Pattom Vrindavan gardens Sewerage/Septage 0.07 Work Completed
68 21.37 TSS-Rehabilitation and upgradation of existing sewer network at Kala vihar, Kunnukuzhy Sewerage/Septage 0.5 Work Completed
69 21.36 TSS-Rehabilitation and upgradation of existing sewer network and interconnections at Valiyasala myladikadavu, Jagathy near sunny pharma, CIT road Sewerage/Septage 0.19 Work Completed
70 21.35 TSS-Rehabilitation and upgradation of existing sewer network at Jagathy kavuvila, Karyakar lane, Valiyasala kavil temple, Arysala Vivekananda street, Vilayil lane, Erakkam road Sewerage/Septage 0.35 Work Completed
71 21.34 TSS - Raising of Manhole covers in various wards under Sewerage Sn. 2 Sewerage/Septage 0.21 Work Completed
72 21.33 Rehabilitation and up gradation of Existing sewer net work at Karamana Sathya Nagar Branch lanes of Sreedevi Nagar under Sewerage Section No.2, Sewerage/Septage 0.26 Work Completed
73 21.32 TSS - Reconstruction of dilapidated manholes in Poojapura, Mudavanmugal area under Sewerage Sn 2 Sewerage/Septage 0.23 Work Completed
74 21.31 TSS - Reconstruction of dilapidated manholes in Karamana Thaliyal area under Sewerage Sn 2 Sewerage/Septage 0.22 Work Completed
75 21.30 Reconstruction of dilapidated manholes in Arannoor, Thycaud area under Sewerage Sn 2 Sewerage/Septage 0.22 Work Completed
76 21.29 Rehabilitation and upgradation of existing sewer network at Enchakkal area Sewerage/Septage 0.38 Work Completed
77 21.28 Rehabilitation and upgradation of existing sewer network at Thakaraparambu, sreekanteswaram Manacaud Aiswarya Nagar Area Sewerage/Septage 0.36 Work Completed
78 21.27 Rehabiliatation of sewer line from Pettah to Railway hospital road Sewerage/Septage 0.8 Work Completed
79 21.26 Rehabilitation of damaged sewer network in Amma Residents area, Palkulangara Sewerage/Septage 0.09 Work Completed
80 21.45 TSS-Rehabilitation and upgradation of existing sewer network at Manjalikulam branch road, Ootukuxhy, Vanrose jn branch road Sewerage/Septage 0.44 Work Completed
81 21.25 Rehabilitation of sewer line including cleaning, replacing damaged lines etc at Kozhiyottu, Vilayil lane, Kaithamukku, Thengappura area Sewerage/Septage 0.45 Work Completed
82 21.24 TSS - Providing Sewerage facility to Eastern side of Amayizhanjan thodu between Vanchiyoor Jn and Samad Hospital road jn Sewerage/Septage 0.23 Work Completed
83 21.23 TSS - Raising of Manhole covers in various wards under Sewerage Sn. 1 Sewerage/Septage 0.21 Work Completed
84 21.22 TSS - Reconstruction of dilapidated manholes in Vanchiyoor, Pulimoodu, chirakulam, Uppidamoodu, Pallimukku area under Sewerage Sn 1 Sewerage/Septage 0.22 Work Completed
85 21.21 TSS - Reconstruction of dilapidated manholes in Chalai, Fort, Chenthitta, Attukal, Pazhavangadi, Powerhouse area under Sewerage Sn 1 Sewerage/Septage 0.22 Work Completed
86 21.20 TSS - Reconstruction of dilapidated manholes in Manacaud, Sreevaraham, Kalippankulam, Enchakkal area under Sewerage Sn 1 Sewerage/Septage 0.22 Work Completed
87 8.7. Replacing old AC main and laying of 110mm PVC pipe at Vellayani Junction, studio road to plankalamukku, Nemom ward Water Supply 0.26 Work Completed
88 21.19 TSS - Reconstruction of dilapidated manholes in Palkulangara, Pettah, Perunthanni area under Sewerage Sn 1 Sewerage/Septage 0.23 Work Completed
89 21.18 AMRUT SAAP 2017-18 - Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in West R C area under Sewerage section , Sasthamangalam Sewerage/Septage 0.1 Work Completed
90 8.6. Replacing old service main pipes with UPVC main along Panickers lane and Mangalam lane in Sasthamangalam ward Water Supply 0.21 Work Completed
91 21.17 AMRUT SAAP 2017-18 - Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in Left R C area under Sewerage section , Sasthamangalam Sewerage/Septage 0.1 Work Completed
92 21.16 AMRUT SAAP 2017-18 - Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in Central R C area under Sewerage section , Sasthamangalam Sewerage/Septage 0.1 Work Completed
93 8.5. Replacing old AC service main pipes with 110mm,90mm UPVC pipes at Udarasiromony road and Palottukonam in Vazhuthacaud Water Supply 1.03 Work Completed
94 21.15 AMRUT SAAP 2017-18 - Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in Right R C area under Sewerage section , Sasthamangalam Sewerage/Septage 0.1 Work Completed
95 21.14 AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in West R C area - under Sewerage Section,Sasthamangalam Sewerage/Septage 0.11 Work Completed
96 8.4. Replacing Old AC pipes with 110mm PVC pipes along Gandhi Nagar lane & Tagore Nagar in Vazhuthacaud ward Water Supply 0.13 Work Completed
97 21.46 Rehabilitation and upgradation of existing sewer network at Thycadu MG Radhakrishnan Jn towards Poundkulam Sewerage/Septage 0.3 Work Completed
98 21.13 AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Left R C area - under Sewerage Section,Sasthamangalam Sewerage/Septage 0.12 Work Completed
99 21.12 AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Central R C area - under Sewerage Section,Sasthamangalam Sewerage/Septage 0.14 Work Completed
100 8.3. Improvement of water supply to Kallampally & Periyamadam area by interconnecting with 110mm PVC pipes Water Supply 0.09 Work Completed
101 21.11 AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Right R C area - under Sewerage Section,Sasthamangalam Sewerage/Septage 0.14 Work Completed
102 8.2. Replacing old AC service main pipes with 110mm, 90mm UPVC pipes at CSM Nagar Vazhuthacaud ward Water Supply 0.44 Work Completed
103 21.10 AMRUT SAAP-2017-18- TSS- Supplying & Laying sewer line at Street - 3 of Devaswom Board Residents Association Area Sewerage/Septage 0.08 Work Completed
104 21.9 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Nethaji Bose road , Marappalam near Keni bridge from NBRA H-1 to NBRA H-10 under Sewerage Section,Sasthamangalam Sewerage/Septage 0.06 Work Completed
105 8.1. Replacing old AC main with 140mm,110mm,90mm PVC pipes along Sreerangam lane, Elankom gardens, Judge lane in Sasthamangalam ward Water Supply 0.8 Work Completed
106 21.8 AMRUT SAAP -2017-18 -TSS- Dismantling existing 100 mm dia SW pipe and relaying 200 mm SW sewer line and construction of RCC Man hohes at T N line , Vazhuthakadu under Sewerage Section,Sasthamangalam Sewerage/Septage 0.12 Work Completed
107 10.23 Urgent reconstruction of dilapidated old brick manholes at Nandavanam Gardens, Valiyasala Sewerage/Septage 0.02 Work Completed
108 10.22 Rehabilitation - Urgent rebalitation of dilapidated manholes at Karamana Mangad lane (KMRA) Sewerage/Septage 0.03 Work Completed
109 7.8. Replacing existing damaged pipe and laying 110mm PVC and altering existing connection to new line at Thirumala to Puthenkada Jn. Water Supply 0.03 Work Completed
110 10.21 Rehabilitation- Urgent rehabilitation works on the sewerage system at Kadakamthalackal lane, Melaranoor Sewerage/Septage 0.03 Work Completed
111 7.7. Replacing existing damaged pipe and laying 110mm PVC and altering existing connection to new line at Mangattukadavu to swathy Nagar Water Supply 0.11 Work Completed
112 10.20 Rehabilitation- Urgent rehabilitation works on the sewerage system at Cherukode lane, Kunchalummoodu Sewerage/Septage 0.08 Work Completed
113 7.6. Replacing existing damaged pipe and laying 110mm PVC and altering existing connection to new line at Mangattukadavu CSI Jn to Annoor Water Supply 0.48 Work Completed
114 7.5. Repalcing existing damaged pipe and laying 160mm PVC and altering existing connection to new line at Puthenkada Jn. to Mangattukadavu Water Supply 0.56 Work Completed
115 7.4. Replacement of existing 100mm GI pipe with 110mm PVC at Chalai area Water Supply 0.8 Work Completed
116 7.3. Replacement of existing 150mm AC pipe with 160mm PVC at Aryankuzhi area Water Supply 0.96 Work Completed
117 10.19 Dismantling of damaged brick manhole and re-constructing with RCC manhole at Attara lane, Kannammoola under Sewerage Section Sasthamangalam Sewerage/Septage 0.04 Work Completed
118 10.18 Dismantling of damaged brick manhole and re-constructing with RCC manhole at Poojappura Thirumala road Sewerage/Septage 0.06 Work Completed
119 10.17 Rehabilitation -- Dismantling of damaged brick manhole and re-constructing with RCC manhole at Peroorkada - Ambalamukku area under Sewerage Section Sasthamangalam Sewerage/Septage 0.06 Work Completed
120 7.2. Replacement of existing 150mm AC pipe with 160mm PVC at Sreevaraham area Water Supply 0.93 Work Completed
121 10.16 Rehabilitation - Dismantling of damaged brick manhole and re-constructing with RCC manhole at Nanthancodu Nalanda area under Sewerage Section Sasthamangalam Sewerage/Septage 0.07 Work Completed
122 21.7 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Bhagavathi line B-7- under Sewerage Section,Sasthamangalam Sewerage/Septage 0.16 Work Completed
123 7.1. Replacement of existing 150mm AC pipe with 160mm PVC at Konchiravila area Water Supply 1 Work Completed
124 21.6 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Bhagavathi line C-15 and C-16- under Sewerage Section,Sasthamangalam Sewerage/Septage 0.21 Work Completed
125 21.5 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-82 to 92- under Sewerage Section,Sasthamangalam Sewerage/Septage 0.09 Work Completed
126 21.4 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-56 to 72- under Sewerage Section,Sasthamangalam Sewerage/Septage 0.17 Work Completed
127 21.3 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-46 to 53- under Sewerage Section,Sasthamangalam Sewerage/Septage 0.07 Work Completed
128 6.20. Replacing existing 100mm AC along Kunnukuzhi road Water Supply 0.7 Work Completed
129 21.2 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line from Jawahar nagar O street towards Bhagavathy nagar A street- under Sewerage Section,Sasthamangalam Sewerage/Septage 0.12 Work Completed
130 6.19. Replacing existing 100mm AC along Vayalikada to Kuravankonam Water Supply 0.6 Work Completed
131 21.1 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kuravankonam ,Vikramapuram Hills house no.VH-130 to 135- under Sewerage Section,Sasthamangalam Sewerage/Septage 0.06 Work Completed
132 6.18. Replacing existing 100mm AC along Madathunada-Perappoor road Water Supply 0.51 Work Completed
133 6.17. Replacing existing 80mm AC along Manvila Jn to Nirmalyam road Water Supply 0.16 Work Completed
134 6.16. Replacing existing 80mm AC along Manvila tank to Thalavarambu temple road Water Supply 0.18 Work Completed
135 18.4 (D) Supplying and Erection of Pumpsets , transformer and electrical accessories in the Kulathur Pumping Station Sewerage/Septage 2.49 Work Completed
136 6.15. Replacing existing 50mm GI along Musaliar lane Pettah ward Water Supply 0.07 Work Completed
137 6.14. Replacing existing 150mm AC along Arasumoodu to Thippatti temple road Water Supply 0.31 Work Completed
138 18.2 (B) Well at Kulathoor Sewerage/Septage 4.81 Work Completed
139 6.13. Replacing existing 100mm AC along Rajaji Nagar in Thampanoor ward Water Supply 0.46 Work Completed
140 18.1 (A) 350mm DI K9 PM from well at Kulathoor to stilling chamber at Arasumoode Sewerage/Septage 1.22 Work Completed
141 10.15 Rehabilitation - Dismantling existing damaged 100mm dia Sw sewer line and laying 200mm dia SW pipe and construction of manholes at Madathuvila Lane Edappazhinji Sewerage/Septage 0.02 Work Completed
142 10.14 Rehabilitation - Dismantling of damaged brick manhole and re-constructing with RCC manhole at Lenin Nagar Sewerage/Septage 0.07 Work Completed
143 6.12. Replacing existing 110mm PVC along Thilak Nagar Parottukonam Water Supply 0.23 Work Completed
144 6.11. Replacing existing 100mm AC along Varambaserri road Water Supply 0.83 Work Completed
145 6.10. Replacing existing 150mm AC along Ambalamukku - Oolampara road Water Supply 0.62 Work Completed
146 10.13 Rehabilitation - Dismantling of damaged brick manhole and re-constructing with RCC manhole at Kanaka Nagar area under Sewerage Section Sasthamangalam Sewerage/Septage 0.06 Work Completed
147 10.12 Rehabilitation - Dismantling of damaged brick manhole and re-constructing with RCC manhole at Jawahar Nagar area under Sewerage Section Sasthamangalam Sewerage/Septage 0.07 Work Completed
148 10.11 Rehabilitation - Increasing in size of existing sewer main using 300mm dia SWpipe from Edappazhinji towards CSM Nagar III Reach Ch.817M to 1191m Sewerage/Septage 0.67 Work Completed
149 10.10 Rehabilitation -Increasing in size of existing sewer main using 400mm dia RCC NP3 pipe from Edappazhinji towards CSM Nagar II Reach Ch.379M to 817m Sewerage/Septage 1.54 Work Completed
150 10.9 Rehabilitation - Increasing the size of existing sewer main using 400mm dia RCC NP3 pipe from Edappazhinji towards CSM Nagar I Reach Ch.0 M to 379m Sewerage/Septage 0.93 Work Completed
151 10.8 Rehabilitation --Laying 150mm SW pipe at Aiswarya lane, Poornima lane, Bharath lane, Mythri lane & Kavuvila lane at Sasthamangalam ward under sewerage section Sasthamangalam Sewerage/Septage 0.4 Work Completed
152 10.7 Rehabilitation -D Block - Supplying and laying 200 mm dia SW sewer branch line from The Existing MH towards Chalakuzhy - Kappil road Sewerage/Septage 0.15 Work Completed
153 10.6 Rehabilitation - Relaying chocked and broken sewer line including construction of man holes from SNRA 88B to SNRA 101 at SN Nager, Pettah and and reconstruction of dilapidated man holes at Ambalathumukku Kaumudhi Resiedents Lane Sewerage/Septage 0.11 Work Completed
154 10.5 Rehabilitation - Urgent Re-Laying 200mm SW pipe and construction of manhole near Parthas at Power House Road Sewerage/Septage 0.26 Work Completed
155 10.4 Reconstruction of dilapidated man holes at Ambujavilasom, malloor road, Chettikulangara, Athani, Amba nagar, Mullassery, Chirakkulam, Thengapura, Mulluvilakom, Pettah, Rishimangalam, Palkulangara, Chempakassery, Kaithamukku, Pattoor etc under Sewerage Section I, kuriyathy Sewerage/Septage 0.34 Work Completed
156 10.3 Rehabilitation - Relaying damaged 300mm sw pipe from Parachal Jn in Malloor road to Devi pharma Junction and construction of dilapidated man holes at Thumbara lane in Vanchiyoor ward Sewerage/Septage 0.11 Work Completed
157 10.2 Rehabilitation - Providing 200mm sewer line from VRA B - 26 to VRA A -22 and connectig to the existing MH near Khadi Board, Vanchiyoor Sewerage/Septage 0.09 Work Completed
158 8.6 Storm water drainage system for Priyadarshini Nagar in Vallakadavu ward Drainage 0.14 Work Completed
159 8.7 Storm water drainage system for Nethaji road in Poojappura ward Drainage 0.45 Work Completed
160 8.8 Storm water drainage system for Pulimoodu-Gandhari Amman Kovil road in Thampanoor ward Drainage 0.25 Work Completed
161 8.9 Storm water drainage system for Kunnukuzhy-Kannamoola road in Kunnukuzhy ward Drainage 1.17 Work Completed
162 8.10 Storm water drainage system for Cherukara Naduthala road in Poojappura ward Drainage 0.67 Work Completed
163 8.11 Storm water drainage system for Pattor Jn-EMS Nagar road in Kannammoola ward Drainage 0.25 Work Completed
164 8.12 Storm water drainage system for Athani Link road, Chavarachi in Vanchiyoor ward Drainage 0.21 Work Completed
165 8.13 Storm water drainage system for Kochar road towards Killipalam in Valiyasala ward Drainage 0.2 Work Completed
166 8.14 Storm water drainage system for Kesavadev road to Thrivikramangalam Thamalam Jn in Mudavanmugal ward Drainage 0.37 Work Completed
167 8.15 Storm water drainage system for Milk Colony road in Bheemapally East ward Drainage 0.61 Work Completed
168 8.16 Storm water drainage system for Vadekkad-Kannammoola Thodu road in Kannammoola ward Drainage 0.06 Work Completed
169 8.17 Storm water drainage system for Maruthoor Kadavu towards Elamthengu road Kalady ward Drainage 0.42 Work Completed
170 8.18 Storm water drainage system for Soman Nagar Kalady road in Nedumcaud ward Drainage 0.81 Work Completed
171 8.19 Storm water drainage system for Valiyathura-Muttathara road-Bheemapally ward Drainage 1.42 Work Completed
172 8.20 Storm water drainage system for Kowdiar Tennis Club road in Kowdiar ward Drainage 0.59 Work Completed
173 8.21 Storm water drainage system for Kanaka Nagar Nanthancode ward Drainage 0.28 Work Completed
174 8.22 Storm water drainage system for PMG to Charachira road in Nanthancode ward Drainage 1.13 Work Completed
175 8.23 Construction of Drain in SS Kovil road-LHS in Thampanoor ward Drainage 0.67 Work Completed
176 8.24 Construction of Drain in SS Kovil road-RHS in Thampanoor ward Drainage 0.62 Work Completed
177 8.25 Construction of Drain in Chettikulangara road in Vanchiyoor ward Drainage 0.51 Work Completed
178 10.1 Rehabilitation -Increasing the capacity of sewer 150mm dia SW pipe to 200mm dia SW pipe and construction of RCC manholes at Manacadu Harshan Nagar and Seethapuram lane Sewerage/Septage 0.24 Work Completed
179 8.29 Construction of Drain in P D Nagar (from Vidya Gardens) in Vallakadavu ward. Drainage 0.09 Work Completed
180 9.14 Laying 250 mm dia DI K9 pumping main from Mudavanmugal Pump House to Jagathy Junction and construction of Stilling Chamber at Jagathy Junction Sewerage/Septage 3 Work Completed
181 8.30 Construction of Drain in Shastri Nagar road / Mythodu Kuzhy (Right) in Mudavanmugal ward Drainage 0.64 Work Completed
182 8.31 Construction of Drain in Kurattoor road in Mudavanmugal Ward Drainage 0.04 Work Completed
183 8.32 Construction of Drain in Golf Link Road in Kowdiar Ward Drainage 0.27 Work Completed
184 8.33 Construction of Drain in Chitra Nagar road in Poojappura Ward Drainage 0.16 Work Completed
185 8.37 Construction of Drain in AKG Center Kunnukuzhi Road in kannammoola Ward Drainage 0.17 Work Completed
186 8.38 Construction of Drain in Arayalor Road in Thirumala Ward Drainage 0.48 Work Completed
187 11.5 Construction of Drain in Elangam panayil road in Nedumcaud Ward Drainage 0.09 Work Completed
188 9.33 Construction of drain on Oruvakkonam - Kattayikkonam road in Kattaikonam Ward Drainage 0.55 Work Completed
189 11.4 Construction of Drain in Green Street road in Poojappura Ward Drainage 0.18 Work Completed
190 9.32 Construction of drain on Konchiravila Pulimoottil Kadavu road in Attukal Ward Drainage 1.14 Work Completed
191 9.31 Construction of drain on Parayikkadavu Theruvila road in Mudavanmugal Ward Drainage 0.21 Work Completed
192 11.3 Construction of Drain in towards Melemukku mailadi kadavu road in valiyasala Ward Drainage 0.06 Work Completed
193 9.30 Construction of drain on Moonnammoodu Aruvikkonam road in Kachani Ward Drainage 0.49 Work Completed
194 9.29 Construction of drain on Cheenikkonam Maruvathoor road in Nettayam Ward Drainage 0.21 Work Completed
195 11.2 Construction of Drain in Kesavan road in poojappura Ward Drainage 0.14 Work Completed
196 11.1 Construction of Drain in Quarters to Melarannoor LHS road in Aranoor Ward Drainage 0.29 Work Completed
197 10.27 Construction of Drain in Valiyathura - Muttathara road in Vallakadavu Ward Drainage 0.47 Work Completed
198 10.26 Construction of Drain in Kulathara Jn Bus stop to Karamana River (parapachivila - Vittiyur Road) in Kalady Ward Drainage 1.55 Work Completed
199 9.12 TSS - E Block Zone II - Supplying and laying 300mm dia SW sewer main interconnection between Kootanvila and Chittatinkara sewer main Sewerage/Septage 0.07 Work Completed
200 8.5 Storm water drainage system for Govt UPS to Sewage Farm in Bheemapally ward Drainage 0.36 Work Completed
201 8.4 torm water drainage system for Thanivilakam Lane Nemam in Ponnumangalam ward Drainage 0.12 Work Completed
202 9.11 TSS - E Block Zone III - Supplying and laying 200mm dia SW pipe branch sewer line from the existing Konathukulangara sewer main towards Dwani Lane (PRA lane No. 07) at Maruthankuzhy Sewerage/Septage 0.14 Work Completed
203 8.3 Storm water drainage system for Kunnukuzhy colony in Kunnukuzhy ward Drainage 0.1 Work Completed
204 8.2 Storm water drainage system for Sub Lane-Gowreeshwapattom road in Kunnukuzhy ward Drainage 0.04 Work Completed
205 9.10 TSS - E Block Zone III - Supplying and laying 200mm dia SW pipe branch sewer line from the existing Konathukulangara lane towards Padayani road association lane No. 05 (PRA - 16-20) at Maruthankuzhy Sewerage/Septage 0.1 Work Completed
206 9.9 TSS - Supplying and laying 200mm dia SW pipe sewer line from Padayani road Ex MH towards Padayani Gardens Lane No. 8A (PRA G1 to G17) Sewerage/Septage 0.17 Work Completed
207 9.8 TSS - E Block Zone III - Supplying and laying 150mm dia SW branch sewer line from the existing MH towards Melekuzhivila at Maruthamkuzhy Sewerage/Septage 0.14 Work Completed
208 9.7 Supplying and laying 200mm dia SW sewer line from the existing MH towards Binoy Lane at Kizhakke Pattom Residence Association Sewerage/Septage 0.07 Work Completed
209 9.6 TSS - E Block Zone III - Supplying and laying 200mm dia SW pipe branch sewer line from the existing Konathukulangara lane towards Padayani road (PRA - Lane 10) at Maruthankuzhy Sewerage/Septage 0.14 Work Completed
210 9.5 TSS - E Block Zone II - Laying 300mm dia SW pipe sewer main from Jagathy Vettamukku sewer main MH 60 towards Koottamvila Ex MH (N-N1) Sewerage/Septage 0.19 Work Completed
211 6.9. Replacing existing 80mm AC along Ambalamukku-Mannadi lane Water Supply 0.21 Work Completed
212 6.8. Replacing existing 80mm AC along Manvila-Pullukadu-Don Bosco Road Water Supply 0.17 Work Completed
213 9.4 TSS - D Block Zone II - Laying 600mm dia RCC NP3 pipe sewer main from Edappazhinji to Chithra Nagar via Vettamukku 2 Sewerage/Septage 0.51 Work Completed
214 6.7. Replacing existing 100mm AC along Vayalikkada- Madathunada road Water Supply 1.29 Work Completed
215 6.6. Replacing existing 80mm AC along Ambalamukku NCC road Water Supply 1.09 Work Completed
216 9.3 TSS - D Block Zone II - Laying 600mm dia RCC NP3 pipe sewer main from Edappazhinji to Chithra Nagar via Vettamukku 1 Sewerage/Septage 0.51 Work Completed
217 9.28 Construction of drain on Malamugal Kachani road in Kachani Ward Drainage 0.52 Work Completed
218 9.27 Construction of drain on Peoples Lane road in Jagathy Ward Drainage 0.56 Work Completed
219 9.26 Construction of drain on Thaliyal Thelungu Chetti Theruvu road in Karamana Ward Drainage 0.48 Work Completed
220 9.25 Construction of drain on Mithra Nagar road in Ambalathara Ward Drainage 0.38 Work Completed
221 9.24 Construction of drain on Thottam road in Ambalathara Ward Drainage 0.29 Work Completed
222 9.23 Construction of drain on Surya Nagar road in Ambalathara Ward Drainage 0.24 Work Completed
223 9.21 Construction of drain on Vazhathottam Kayalkara road in Poomkulam Ward Drainage 1.23 Work Completed
224 9.20 Construction of drain on Cheriyamuttom road in Poonthura Ward Drainage 0.53 Work Completed
225 9.19 Construction of drain on Rajeev Gandhi road in Muttathara Ward Drainage 0.45 Work Completed
226 9.18 Construction of drain on Kaarali Mudumbil road in Chakkai Ward Drainage 0.07 Work Completed
227 9.17 Construction of drain on Ambalathinkara pazhaya road in Kazhakuttom Ward Drainage 0.24 Work Completed
228 9.16 Construction of drain on Ammankovil - Kazhakuttom market road in Kazhakuttom Ward Drainage 0.28 Work Completed
229 9.15 Construction of drain on Plavaracodu - Uloorkonnam - Andoorpoyka road in Chanthavila Ward Drainage 0.55 Work Completed
230 9.14 Construction of drain near Old National Highway road in Sreekaryam Ward Drainage 0.4 Work Completed
231 9.13 Construction of drain on Kalluvila road in Chellamangalam Ward Drainage 0.36 Work Completed
232 9.12 Construction of drain on Vattavilakam -Keraladithyapuram road in Chellamangalam Ward Drainage 0.51 Work Completed
233 9.11 Construction of drain on Aavukulam - Kallarathala - Valiyavila road in Powdikonam Ward Drainage 0.49 Work Completed
234 10.25 Construction of Drain in MLA Road near thrivikramangalam to Thamalam road in Mudavanmugl Ward Drainage 1.36 Work Completed
235 10.24 Construction of Drain in Chembaka Nagar area road in Vazhuthacaud Ward Drainage 0.34 Work Completed
236 10.23 Construction of Drain in CSM Nagar area Road in Vazhuthacaud Ward Drainage 0.46 Work Completed
237 9.10 Construction of drain on Aruvikkarakkonam - Santhipuram road in Njandoorkonam Ward Drainage 0.45 Work Completed
238 10.22 Construction of Drain in Althara Temple back side road in Vazhuthacaud Ward Drainage 0.08 Work Completed
239 9.9 Construction of drain on Melemcodu road in Mannanthala Ward Drainage 0.54 Work Completed
240 10.21 Construction of Drain in Thamburan nagar area road in Vazhuthacaud Ward Drainage 0.1 Work Completed
241 9.8 Construction of drain on Kulapparakkonam road in Mannanthala Ward Drainage 0.42 Work Completed
242 10.20 Construction of Drain in Thirumala Alapuram Road in Thirumala Ward Drainage 0.56 Work Completed
243 9.7 Construction of drain on Chenchery road in Mannanthala Ward Drainage 0.48 Work Completed
244 9.6 Construction of drain on Ganga Nagar - Thrimoorthy Nagar road - KBS Line in Kamaleswaram Ward Drainage 0.6 Work Completed
245 10.19 Construction of Drain in Keni Road In Muttada Ward Drainage 0.4 Work Completed
246 10.18 Construction of Drain in Bilal Road in Vallakadavu Ward Drainage 0.12 Work Completed
247 10.17 Construction of Drain in AArattu Road in Vallakadavu Ward Drainage 0.36 Work Completed
248 10.16 Construction of Drain in Valayasala DD Office to Santhikavadam ochar road in Valiyasala Ward1 Drainage 0.26 Work Completed
249 10.15 Construction of Drain in Jyothipuram railway bridge ujjaini mahakali amman kovil road in Valiyasala Ward Drainage 0.19 Work Completed
250 10.14 Construction of Drain in Marappanode Sreebhadra Nagar Road in Chettivilakam Ward Drainage 0.3 Work Completed
251 10.13 Construction of Drain in NCC Road in Chettivilaam Ward Drainage 0.4 Work Completed
252 10.12 Construction of Drain in Marapalam Gardens Road in Muttada Ward Drainage 0.38 Work Completed
253 10.11 Construction of Drain in NS Dippo in Vallaadavu Ward Drainage 0.16 Work Completed
254 10.10 Construction of Drain in Thirumala to Mangad Road in Thirumala Ward Drainage 0.44 Work Completed
255 10.9Construction of Drain in DPI Road in Thycaud Ward Drainage 0.1 Work Completed
256 10.8 Construction of Drain in Vellayani Jn to Ponnumangalam Road in Ponnumangalam Ward Drainage 0.65 Work Completed
257 10.7 Construction of Drain in Settlement Colony Road in Ponnumangalam Ward Drainage 0.22 Work Completed
258 10.6 Construction of Drain Old Karaykamandapam Pottavila road in Ponnumangalam Ward Drainage 0.1 Work Completed
259 10.5 Construction of Drain in Mettukada Killipalam Road in Thycaud Ward Drainage 0.08 Work Completed
260 10.4 Construction of Drain Petta Alimukku road in Kannammoola Ward Drainage 0.17 Work Completed
261 10.3 Construction of Drain in Vazhavila in Puthenpalli Ward Drainage 0.11 Work Completed
262 10.2 Construction of Drain Paruthikuzhi road in Puthenpalli Ward Drainage 0.41 Work Completed
263 10.1 Construction of Drain in CV Raman Pillai Road to Panavila Road in Thycaud Ward Drainage 0.19 Work Completed
264 9.2 TSS - E Block Zone II - Laying 700mm dia sewer main from Jagathy towards common manhole at Vivekananda Nagar IInd Reach chainage 259m to 512m Sewerage/Septage 1 Work Completed
265 9.1 TSS - E Block Zone II - Laying 700mm dia sewer main from Jagathy towards common manhole at Vivekananda Nagar 1st Reach chainage 0m to 259m Sewerage/Septage 2.44 Work Completed
266 7.5 Laying sewer network in L block (Edathara) from MH 110 to MH 150 (Package 5) Sewerage/Septage 2.44 Work Completed
267 7.4 Sewer network from Pettah Arasumoode junction to MH 7 Edathara pumping station (Package 4) Sewerage/Septage 6.41 Work Completed
268 7.3 Laying Transmission Main and sewer network in block L Edathara - collection and conveyance system - Supply and laying trunk main from stilling chamber at Udhaya Garden to MH 89 - Package 3 Sewerage/Septage 1.81 Work Completed
269 7.2 Supplying and laying sewer line through Pettah Venpalavattom road, Greenpark road and side of Amayizhanjan thodu and to MH7 Edathara Zone Sewerage/Septage 3.7 Work Completed
270 9.5 Construction of drain on Aryankuzhi road in Kamaleswaram Ward Drainage 0.4 Work Completed
271 9.1 Thampuranmukku moolavilakam road kannanmoola ward Drainage 0.17 Work Completed
272 9.4 Construction of drain on Vayyanmoola Karali road in Chackai Ward Drainage 0.82 Work Completed
273 7.1 Laying Trunk Main from stilling chamber at Pulayanarkotta to MH10 of pumping station at Edathara (Part 1) Sewerage/Septage 20.68 Work Completed
274 9.2 Construction of drain in manavanagar road in perunthanni ward Drainage 0.26 Work Completed
275 9.3 Construction of drain on Sreevaraham Kothalam road in Perunthanni Ward Drainage 0.12 Work Completed
276 6.5. Replacing existing 100mm AC along Mosque lane pettah ward Water Supply 0.29 Work Completed
277 6.4. Replacing existing 150mm CI along Mulavana Junction- Gowreesapattom, Pottakuzhy Water Supply 0.83 Work Completed
278 6.3. Replacing existing 80mm AC along Manvila Ushas Nagar to Chenkodikadu Water Supply 0.17 Work Completed
279 6.2. Replacing existing 125mm AC along pipinmoodu-Golflinks road Water Supply 0.56 Work Completed
280 6.1. Replacing 100mm AC along Chakkalamukku- Societymukku Water Supply 3.95 Work Completed
281 9.1 Construction of Drain on Chattambi Swammi Nagar Road in Perunthanni Ward Drainage 0.07 Work Completed
282 Providing sewerage facility to newly constructed residential colony at Karimadom - Part ll Sewerage/Septage 0.35 Work Completed
283 Developing one park, Phase III Parks 3 Work Completed
284 Multi level Car parking at Medical College (Opposite of Super speciality block) Urban Transport 14 Work Completed
285 Providing new networks (Sewerage facility in the Kalladimugham Housing Colony) Sewerage/Septage 11.86 Work Completed
286 Providing mechanical sludge drying unit at Muttathara 107 Mld STP Sewerage/Septage 4.2 Work Completed
287 Supplying and erection of Pumpsets , Transformer and electrical accessories in the Karimanal Pumping Station Sewerage/Septage 1.5 Work Completed
288 Supplying and laying 350mm DI K9 pumping main (karimanal pumping station to stilling chamber at bypass junction) Sewerage/Septage 0.7 Work Completed
289 Construction of Pumping Station at Karimanal ( Block J) Sewerage/Septage 3.02 Work Completed
290 Supplying and erection of Pumpsets , Transformer and electrical accessories in the Akkulam Pumping Station Sewerage/Septage 1.8 Work Completed
291 Supplying and laying Transmission Main in Block K Sewerage/Septage 6.89 Work Completed
292 Supplying and laying 450mm DI K9 pumping main for a length of 1800m (Block K Akkulam pumping station to Pulayanarkotta stilling chamber) Sewerage/Septage 3.36 Work Completed
293 Construction of Pumping Station at Akkulam( Block K) Sewerage/Septage 3.61 Work Completed
294 Supplying and erection of pumpsets , transformer and electrical accessories in the Edathara Pumping Station Sewerage/Septage 4 Work Completed
295 Installing Flow meters Water Supply 7.5 Work Completed
296 Developing one park- Phase I Parks 0.3 Work Completed
297 Multi level parking at Corporation premises and Chalai (behind of Putharikandam maithanam and transport depot)- Phase I Urban Transport 6.37 Work Completed
298 Developing one park- Phase II Parks 2.25 Work Completed
299 Multi level parking at Corporation premises and Chalai (behind of Putharikandam maithanam and transport depot)- Phase II Urban Transport 12.59 Work Completed
300 Decentralised sewerage treatment plant at Medical College campus including water recycling - Phase 2 Sewerage/Septage 13.85 Work Completed
301 Construction of Smart Office in Thiruvananthapuram- Kowdiar, Pongumoodu, Vellayambalam Water Supply 1.75 Work Completed
302 Construction of new Water Treatment Plant of 75 MLD at Aruvikkara (Phase 2) Water Supply 25 Work Completed
303 Construction and beautification of Thechanvila Park – Punnakkamugal ward Parks 0.3 Work Completed
304 Construction of foot path from Vazhuthacaud forest office jn to DPI along the left side of road in Vazhuthacaud ward Urban Transport 0.09 Work Completed
305 Construction of Drain with covering slab at V K K Nagar Road in Perunthanni ward Drainage 0.26 Work Completed
306 Construction of Drain with covering slab in Asaan Nagar Road in Muttathara ward Drainage 0.09 Work Completed
307 Construction of Drain with covering slab in Navodhaya & Pazhanchira Road in Ambalathara ward Drainage 0.29 Work Completed
308 Construction of Drain with covering slab in Aalukadu-Moonattumukku Road in Manikyavilakom ward Drainage 0.16 Work Completed
309 Construction of Drain with covering slab at Vazhottukonam Vellekadavu Mankuzhi Road in Vazhottukonam ward Drainage 0.59 Work Completed
310 Construction of Drain with covering slab in Nalumukku-Chambakada Road in Sreekanteswaram ward Drainage 0.19 Work Completed
311 Construction of Drain with covering slab in Swathi Nagar Lane in Fort ward Drainage 0.28 Work Completed
312 Supplying and laying pumping main from Edathara pump house to STP at Muttathara Sewerage/Septage 18.43 Work Completed
313 Construction of Pump House at Edathara Sewerage/Septage 8.21 Work Completed
314 Sewerage treatment plant (5 mld) for Medical College Trivandrum - Phase 1 Sewerage/Septage 5.31 Work Completed
315 Rehabilitation of existing pump and machineries Sewerage/Septage 0.38 Work Completed
316 Supplying conveying Laying and Jointing 700mm dia RCC NP3 Trunk main-II from Murinjapalam to Kannammoola chainage 952m to 1728m Sewerage/Septage 2.27 Work Completed
317 Supplying conveying Laying and extending the 900mm DI pumping main from Muttathara sewerage treatment plant and construction of new bridge with pile foundation and allied works Sewerage/Septage 3.45 Work Completed
318 Construction of new Water Treatment Plant of 75 MLD at Aruvikkara (Phase 1) Water Supply 45 Work Completed