| S.No. | Project Title | Project Type | Project Cost (in ₹ Cr.) |
Milestone |
|---|---|---|---|---|
| 1 | Survey and GIS mapping of storm water drainage, sewerage network & assets, water supply network & assets in Thiruvanathapuram corporation | Water Supply | 2.4 | Work Completed |
| 2 | Procurement of bucket cleaning machines and vehicle mounted sewer cleaning equipment | Sewerage/Septage | 4.75 | Work Completed |
| 3 | Laying 150mm SW Sewer line towards Padayani gardens Association lane and laying PVC 160mm sewer lane towards Punartham gardens lane and padayani road | Sewerage/Septage | 0.13 | Work Completed |
| 4 | Providing and laying 300 & 200mm SW Sewer line at Vinayaka Nagar, Arapura, Vattiyoorkavu, under Sewerage Section, Sasthamangalam-Reach 2 | Sewerage/Septage | 0.77 | Work Completed |
| 5 | Providing and laying 300mm & 200mm SW Sewer line at Vinayaka Nagar, Arapura, Vattiyoorkavu, under Sewerage Section, Sasthamangalam, Reach 1 | Sewerage/Septage | 0.72 | Work Completed |
| 6 | Providing and laying 200mm SW Sewer line at Jagathy Panchami Garden under Sewerage Section, Sasthamangalam | Sewerage/Septage | 0.15 | Work Completed |
| 7 | Providing and laying 200mm SW Sewer line from house no MGRA 135 towards TKD road Marapalam, under Sewerage Section, Sasthamangalam | Sewerage/Septage | 0.09 | Work Completed |
| 8 | Providng and laying 300 & 250mm SW Sewer line from Kalakoumudi road towards koyikkal lane in the side of pond , under Sewerage | Sewerage/Septage | 0.93 | Work Completed |
| 9 | Providng and laying 200mm SW Sewer line at Parayil lane, Kanjirampara East Residence Association, Kanjirampara under Sewerage Section, Sasthamangalam | Sewerage/Septage | 0.35 | Work Completed |
| 10 | Providng and laying 200mm SW Sewer line at Harismrithy lane, Kanjirampara East Residence Association, Kanjirampara under Sewerage Section, Sasthamangalam | Sewerage/Septage | 0.36 | Work Completed |
| 11 | Providng and laying 250mm SW Sewer line at Kanjirampara East Residence Association (KERA),(MH 16-MH 30) under Sewerage Section, Sasthamangalam | Sewerage/Septage | 0.67 | Work Completed |
| 12 | Providng and laying 250mm SW Sewer line at Kanjirampara East Residence Association (KERA),(MH 1-MH 15) under Sewerage Section, Sasthamangalam | Sewerage/Septage | 0.44 | Work Completed |
| 13 | Construction of sewer Pumping station in Kollavila in B lock N- Ulloor | Sewerage/Septage | 3.08 | Work Completed |
| 14 | Replacing of pipe lines at Arannoor ward-Pipe line work | Water Supply | 0.43 | Work Completed |
| 15 | Replacing old pipe lines which are regularly breaking in Thuruthumoola ward and Peroorkada ward in Thiruvananthapuram Corporation under WW section Peroorkada-Pipe line work | Water Supply | 2.52 | Work Completed |
| 16 | Replacing old pipe lines which are regularly breaking in Mannanthala and Nalanchira ward in Thiruvananthapuram Corporation under Peroorkada Section-Pipe line work | Water Supply | 1.98 | Work Completed |
| 17 | Providing Sewerage Lines in various areas for connecting lines already laid in AMRUT 1.0 in block L,J,K and I, | Sewerage/Septage | 16.55 | Work Completed |
| 18 | Providing FHTC for all wards (partial coverage as Phase 1) under Kazhakoottam KWA Section | Water Supply | 6.63 | Work Completed |
| 19 | Alathara Mullapally road drain work | Drainage | 0.23 | Work Completed |
| 20 | Panachamoodu road, SCT Nagar, Kulangara kulam, Pazaya Road, Kottara Lane, PT Chacko Nagar, Puthu Palli Road, Gorishapattom Road drain construction. | Drainage | 1 | Work Completed |
| 21 | Sreechithira Thirunal Nagar Road drain work | Drainage | 0.68 | Work Completed |
| 22 | Thalakonam Drain construction | Drainage | 0.47 | Work Completed |
| 23 | Side slab and wall construction in Vivekananda Lane | Drainage | 0.3 | Work Completed |
| 24 | Maintenance of drain in NSP Nagar, Lekshmi Nagar, Kavaloorkonam, Vyasa Nagar, Binoy bye lane, Thoppil Nagar, Minarva Lane, Sadhanandhan Road in Kesavadasapuram | Drainage | 1 | Work Completed |
| 25 | Aavukulam SN Nagar road drain construction | Drainage | 0.31 | Work Completed |
| 26 | Strom water Drainage work in Vattiyoorkavu | Drainage | 0.4 | Work Completed |
| 27 | Kulashekaram Thamakkode Chira Drain construction | Drainage | 0.24 | Work Completed |
| 28 | Rejuvenation of Azhamkonam Kulam Park in Punchakkari Ward | Parks | 0.67 | Work Completed |
| 29 | Kamukarakonam Mulavoor Drain construction | Drainage | 0.15 | Work Completed |
| 30 | Drain construction in Kunchuveedu Lane | Drainage | 0.56 | Work Completed |
| 31 | Mud Pump -10 HP | Sewerage/Septage | 0.04 | Work Completed |
| 32 | Drain near Veli tourist village | Drainage | 2 | Work Completed |
| 33 | Mobile Toilet- 8 Toilet Set (Towing type) | Sewerage/Septage | 0.2 | Work Completed |
| 34 | Drain from Vavarakkonam to Medical College | Drainage | 1.88 | Work Completed |
| 35 | Drain from Back side of STP to Medical College | Drainage | 2.38 | Work Completed |
| 36 | Procurement of Compact STP 100 KLD Units Including Network System | Sewerage/Septage | 6 | Contract Awarded |
| 37 | Procurement of Mobile FSTP 6KL | Sewerage/Septage | 1.35 | Work Completed |
| 38 | Procurement of Water Jet Cleaning cum Suction Vehicle | Sewerage/Septage | 1.62 | Work Completed |
| 39 | Pipe laying works at various places of Kalady Ward-Pipe line work | Water Supply | 0.14 | Work Completed |
| 40 | Pipe line extension works at various places of Mudavanmugal ward-Pipe line work | Water Supply | 0.64 | Work Completed |
| 41 | Procurement of Septage Collection Vehicle- Suction type | Sewerage/Septage | 1.2 | Work Completed |
| 42 | Replacing of old AC pipes and extension and alterations in Poojappura ward, Construction of valve chamber and raising of valve chamber-Pipe line work | Water Supply | 0.11 | Work Completed |
| 43 | Replacing of old AC pipes and extension and alterations in Nedumcaud ward-Pipe line work | Water Supply | 0.1 | Work Completed |
| 44 | Replacing of 80mm AC pipe lines to 110mm PVC pipe 6 kg/cm2 works at Sankar Nagar, Pappanamcode ward-Pipe line work | Water Supply | 0.23 | Work Completed |
| 45 | Replacing of pipe lines at Ammaveedu line and interconnection at Studio road under Nemom ward-Pipe line work | Water Supply | 0.38 | Work Completed |
| 46 | Replacing old pipe lines which are regularly breaking in Kinavoor ward in Thiruvananthapuram Corporation under Peroorkada Section-Pipe line work | Water Supply | 3.49 | Work Completed |
| 47 | Dedicated feeder from Aruvikkara substation to kummi Water Treatment Plant and Kalathara Pump House | Water Supply | 2.1 | Work Completed |
| 48 | Laying Transmission Main and sewer networks in Block L - Laying of 315mm dia HDPE transmission main from Ulloor Jn to SN Jn in Ulloor-Akkulam road by HDD | Sewerage/Septage | 2.6 | Work Completed |
| 49 | Laying Transmission main and Sewer Networks in Block L- Laying of 315 mm dia HDPE Transmission main from Kumarapuram towards Kunjuveedu Jn of Poonthi Road by HDD Method | Sewerage/Septage | 3.08 | Work Completed |
| 50 | Laying Transmission main and sewer networks in Block J (Karimanal) collection and conveyance system. (C) Inter connection sewer networks from trunk main manholes of both sides of the road from Arasumoodu. | Sewerage/Septage | 0.64 | Work Completed |
| 51 | Laying Transmission main and sewer networks in Block J (Karimanal) collection and conveyance system. (B) Sewer network from bypass Jn (Kuzhivila) to MH3 of trunk main from Arasumoodu to Karimanal Pumping Station | Sewerage/Septage | 0.21 | Work Completed |
| 52 | Laying Transmission main and sewer networks in Block J (Karimanal) collection and conveyance system. (A) Trunk main to Karimanal | Sewerage/Septage | 17 | Work Completed |
| 53 | 7.9.4 Replacement of 100mm AC pipes and laying 110mm PVC at Mankeezh line at Sreevaraham under Kuriathy section (Package 4) | Water Supply | 0.33 | Work Completed |
| 54 | 7.9.3 Providing new connection and alterations of house connection from JICA/JUNNRUM Project laid lines in Bheemapally, Bheemapally east and Manikavilakam wards under Kuriathy section (Package 3) | Water Supply | 0.36 | Work Completed |
| 55 | 7.9.2 Alteration of House connections to the JICA and Jnnurm line in Poonthura church area (Package 2) | Water Supply | 0.35 | Work Completed |
| 56 | 7.9.1 Alteration of House connections to the JICA and Jnnurm line in Cheriyamuttam area (Package 1) | Water Supply | 0.46 | Work Completed |
| 57 | 7.6 Laying transmission main and sewer network in Block L Edathara collection and conveyance system - Laying Sewer network by HDD method from MH 10 towards KIIMS Hospital (Package 6) | Sewerage/Septage | 3.36 | Work Completed |
| 58 | Supply and Installation of Smart meters -Phase II | Water Supply | 1.02 | Work Completed |
| 59 | Supply and installation of smart meters- Phase I | Water Supply | 1.27 | Work Completed |
| 60 | 9.13 TSS-Urgent laying of 300mm dia HDPE. pipe and construction of new manholes at Chengalloor and Vattavila of Punnakkamugal ward | Sewerage/Septage | 2.36 | Work Completed |
| 61 | 21.44 TSS- Rehabiliatation of sewer line at Thoppil lane, Valiyasala, Sasthri nagar West, cherukodu, Thelunguchettitheruvu area | Sewerage/Septage | 0.16 | Work Completed |
| 62 | 21.43 TSS- Rehabiliatation of sewer line at Melemankattukonam in Nedumcad ward | Sewerage/Septage | 0.24 | Work Completed |
| 63 | 21.42 TSS-Rehabilitation and upgradation of existing sewer network at Punnen road near secratariat and Mele Thampanoor area | Sewerage/Septage | 0.14 | Work Completed |
| 64 | 21.41 AMRUT SAAP 17-18 - TSS- Rehabilitation and up gradation of Existing sewer net work at TRWA area, Podiyadi lane, BRWA area Anil Nagar,Ayilliathu Finance road In Thalial area under sewerage Section No:2 Kuriathy | Sewerage/Septage | 0.4 | Work Completed |
| 65 | 21.40 TSS-Rehabilitation and upgradation of existing sewer network at Kunninpuram, vivekananda nagar, Kailas nagar, NM nagar area | Sewerage/Septage | 0.56 | Work Completed |
| 66 | 21.39 TSS-Rehabilitation and upgradation of existing sewer network at Thittakudi temple lane, Vadakkekottah, Puthunagar area | Sewerage/Septage | 0.56 | Work Completed |
| 67 | 21.38 upgradation of existing sewer network at Pattom Vrindavan gardens | Sewerage/Septage | 0.07 | Work Completed |
| 68 | 21.37 TSS-Rehabilitation and upgradation of existing sewer network at Kala vihar, Kunnukuzhy | Sewerage/Septage | 0.5 | Work Completed |
| 69 | 21.36 TSS-Rehabilitation and upgradation of existing sewer network and interconnections at Valiyasala myladikadavu, Jagathy near sunny pharma, CIT road | Sewerage/Septage | 0.19 | Work Completed |
| 70 | 21.35 TSS-Rehabilitation and upgradation of existing sewer network at Jagathy kavuvila, Karyakar lane, Valiyasala kavil temple, Arysala Vivekananda street, Vilayil lane, Erakkam road | Sewerage/Septage | 0.35 | Work Completed |
| 71 | 21.34 TSS - Raising of Manhole covers in various wards under Sewerage Sn. 2 | Sewerage/Septage | 0.21 | Work Completed |
| 72 | 21.33 Rehabilitation and up gradation of Existing sewer net work at Karamana Sathya Nagar Branch lanes of Sreedevi Nagar under Sewerage Section No.2, | Sewerage/Septage | 0.26 | Work Completed |
| 73 | 21.32 TSS - Reconstruction of dilapidated manholes in Poojapura, Mudavanmugal area under Sewerage Sn 2 | Sewerage/Septage | 0.23 | Work Completed |
| 74 | 21.31 TSS - Reconstruction of dilapidated manholes in Karamana Thaliyal area under Sewerage Sn 2 | Sewerage/Septage | 0.22 | Work Completed |
| 75 | 21.30 Reconstruction of dilapidated manholes in Arannoor, Thycaud area under Sewerage Sn 2 | Sewerage/Septage | 0.22 | Work Completed |
| 76 | 21.29 Rehabilitation and upgradation of existing sewer network at Enchakkal area | Sewerage/Septage | 0.38 | Work Completed |
| 77 | 21.28 Rehabilitation and upgradation of existing sewer network at Thakaraparambu, sreekanteswaram Manacaud Aiswarya Nagar Area | Sewerage/Septage | 0.36 | Work Completed |
| 78 | 21.27 Rehabiliatation of sewer line from Pettah to Railway hospital road | Sewerage/Septage | 0.8 | Work Completed |
| 79 | 21.26 Rehabilitation of damaged sewer network in Amma Residents area, Palkulangara | Sewerage/Septage | 0.09 | Work Completed |
| 80 | 21.45 TSS-Rehabilitation and upgradation of existing sewer network at Manjalikulam branch road, Ootukuxhy, Vanrose jn branch road | Sewerage/Septage | 0.44 | Work Completed |
| 81 | 21.25 Rehabilitation of sewer line including cleaning, replacing damaged lines etc at Kozhiyottu, Vilayil lane, Kaithamukku, Thengappura area | Sewerage/Septage | 0.45 | Work Completed |
| 82 | 21.24 TSS - Providing Sewerage facility to Eastern side of Amayizhanjan thodu between Vanchiyoor Jn and Samad Hospital road jn | Sewerage/Septage | 0.23 | Work Completed |
| 83 | 21.23 TSS - Raising of Manhole covers in various wards under Sewerage Sn. 1 | Sewerage/Septage | 0.21 | Work Completed |
| 84 | 21.22 TSS - Reconstruction of dilapidated manholes in Vanchiyoor, Pulimoodu, chirakulam, Uppidamoodu, Pallimukku area under Sewerage Sn 1 | Sewerage/Septage | 0.22 | Work Completed |
| 85 | 21.21 TSS - Reconstruction of dilapidated manholes in Chalai, Fort, Chenthitta, Attukal, Pazhavangadi, Powerhouse area under Sewerage Sn 1 | Sewerage/Septage | 0.22 | Work Completed |
| 86 | 21.20 TSS - Reconstruction of dilapidated manholes in Manacaud, Sreevaraham, Kalippankulam, Enchakkal area under Sewerage Sn 1 | Sewerage/Septage | 0.22 | Work Completed |
| 87 | 8.7. Replacing old AC main and laying of 110mm PVC pipe at Vellayani Junction, studio road to plankalamukku, Nemom ward | Water Supply | 0.26 | Work Completed |
| 88 | 21.19 TSS - Reconstruction of dilapidated manholes in Palkulangara, Pettah, Perunthanni area under Sewerage Sn 1 | Sewerage/Septage | 0.23 | Work Completed |
| 89 | 21.18 AMRUT SAAP 2017-18 - Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in West R C area under Sewerage section , Sasthamangalam | Sewerage/Septage | 0.1 | Work Completed |
| 90 | 8.6. Replacing old service main pipes with UPVC main along Panickers lane and Mangalam lane in Sasthamangalam ward | Water Supply | 0.21 | Work Completed |
| 91 | 21.17 AMRUT SAAP 2017-18 - Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in Left R C area under Sewerage section , Sasthamangalam | Sewerage/Septage | 0.1 | Work Completed |
| 92 | 21.16 AMRUT SAAP 2017-18 - Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in Central R C area under Sewerage section , Sasthamangalam | Sewerage/Septage | 0.1 | Work Completed |
| 93 | 8.5. Replacing old AC service main pipes with 110mm,90mm UPVC pipes at Udarasiromony road and Palottukonam in Vazhuthacaud | Water Supply | 1.03 | Work Completed |
| 94 | 21.15 AMRUT SAAP 2017-18 - Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in Right R C area under Sewerage section , Sasthamangalam | Sewerage/Septage | 0.1 | Work Completed |
| 95 | 21.14 AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in West R C area - under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.11 | Work Completed |
| 96 | 8.4. Replacing Old AC pipes with 110mm PVC pipes along Gandhi Nagar lane & Tagore Nagar in Vazhuthacaud ward | Water Supply | 0.13 | Work Completed |
| 97 | 21.46 Rehabilitation and upgradation of existing sewer network at Thycadu MG Radhakrishnan Jn towards Poundkulam | Sewerage/Septage | 0.3 | Work Completed |
| 98 | 21.13 AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Left R C area - under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.12 | Work Completed |
| 99 | 21.12 AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Central R C area - under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.14 | Work Completed |
| 100 | 8.3. Improvement of water supply to Kallampally & Periyamadam area by interconnecting with 110mm PVC pipes | Water Supply | 0.09 | Work Completed |
| 101 | 21.11 AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Right R C area - under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.14 | Work Completed |
| 102 | 8.2. Replacing old AC service main pipes with 110mm, 90mm UPVC pipes at CSM Nagar Vazhuthacaud ward | Water Supply | 0.44 | Work Completed |
| 103 | 21.10 AMRUT SAAP-2017-18- TSS- Supplying & Laying sewer line at Street - 3 of Devaswom Board Residents Association Area | Sewerage/Septage | 0.08 | Work Completed |
| 104 | 21.9 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Nethaji Bose road , Marappalam near Keni bridge from NBRA H-1 to NBRA H-10 under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.06 | Work Completed |
| 105 | 8.1. Replacing old AC main with 140mm,110mm,90mm PVC pipes along Sreerangam lane, Elankom gardens, Judge lane in Sasthamangalam ward | Water Supply | 0.8 | Work Completed |
| 106 | 21.8 AMRUT SAAP -2017-18 -TSS- Dismantling existing 100 mm dia SW pipe and relaying 200 mm SW sewer line and construction of RCC Man hohes at T N line , Vazhuthakadu under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.12 | Work Completed |
| 107 | 10.23 Urgent reconstruction of dilapidated old brick manholes at Nandavanam Gardens, Valiyasala | Sewerage/Septage | 0.02 | Work Completed |
| 108 | 10.22 Rehabilitation - Urgent rebalitation of dilapidated manholes at Karamana Mangad lane (KMRA) | Sewerage/Septage | 0.03 | Work Completed |
| 109 | 7.8. Replacing existing damaged pipe and laying 110mm PVC and altering existing connection to new line at Thirumala to Puthenkada Jn. | Water Supply | 0.03 | Work Completed |
| 110 | 10.21 Rehabilitation- Urgent rehabilitation works on the sewerage system at Kadakamthalackal lane, Melaranoor | Sewerage/Septage | 0.03 | Work Completed |
| 111 | 7.7. Replacing existing damaged pipe and laying 110mm PVC and altering existing connection to new line at Mangattukadavu to swathy Nagar | Water Supply | 0.11 | Work Completed |
| 112 | 10.20 Rehabilitation- Urgent rehabilitation works on the sewerage system at Cherukode lane, Kunchalummoodu | Sewerage/Septage | 0.08 | Work Completed |
| 113 | 7.6. Replacing existing damaged pipe and laying 110mm PVC and altering existing connection to new line at Mangattukadavu CSI Jn to Annoor | Water Supply | 0.48 | Work Completed |
| 114 | 7.5. Repalcing existing damaged pipe and laying 160mm PVC and altering existing connection to new line at Puthenkada Jn. to Mangattukadavu | Water Supply | 0.56 | Work Completed |
| 115 | 7.4. Replacement of existing 100mm GI pipe with 110mm PVC at Chalai area | Water Supply | 0.8 | Work Completed |
| 116 | 7.3. Replacement of existing 150mm AC pipe with 160mm PVC at Aryankuzhi area | Water Supply | 0.96 | Work Completed |
| 117 | 10.19 Dismantling of damaged brick manhole and re-constructing with RCC manhole at Attara lane, Kannammoola under Sewerage Section Sasthamangalam | Sewerage/Septage | 0.04 | Work Completed |
| 118 | 10.18 Dismantling of damaged brick manhole and re-constructing with RCC manhole at Poojappura Thirumala road | Sewerage/Septage | 0.06 | Work Completed |
| 119 | 10.17 Rehabilitation -- Dismantling of damaged brick manhole and re-constructing with RCC manhole at Peroorkada - Ambalamukku area under Sewerage Section Sasthamangalam | Sewerage/Septage | 0.06 | Work Completed |
| 120 | 7.2. Replacement of existing 150mm AC pipe with 160mm PVC at Sreevaraham area | Water Supply | 0.93 | Work Completed |
| 121 | 10.16 Rehabilitation - Dismantling of damaged brick manhole and re-constructing with RCC manhole at Nanthancodu Nalanda area under Sewerage Section Sasthamangalam | Sewerage/Septage | 0.07 | Work Completed |
| 122 | 21.7 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Bhagavathi line B-7- under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.16 | Work Completed |
| 123 | 7.1. Replacement of existing 150mm AC pipe with 160mm PVC at Konchiravila area | Water Supply | 1 | Work Completed |
| 124 | 21.6 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Bhagavathi line C-15 and C-16- under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.21 | Work Completed |
| 125 | 21.5 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-82 to 92- under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.09 | Work Completed |
| 126 | 21.4 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-56 to 72- under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.17 | Work Completed |
| 127 | 21.3 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-46 to 53- under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.07 | Work Completed |
| 128 | 6.20. Replacing existing 100mm AC along Kunnukuzhi road | Water Supply | 0.7 | Work Completed |
| 129 | 21.2 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line from Jawahar nagar O street towards Bhagavathy nagar A street- under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.12 | Work Completed |
| 130 | 6.19. Replacing existing 100mm AC along Vayalikada to Kuravankonam | Water Supply | 0.6 | Work Completed |
| 131 | 21.1 AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kuravankonam ,Vikramapuram Hills house no.VH-130 to 135- under Sewerage Section,Sasthamangalam | Sewerage/Septage | 0.06 | Work Completed |
| 132 | 6.18. Replacing existing 100mm AC along Madathunada-Perappoor road | Water Supply | 0.51 | Work Completed |
| 133 | 6.17. Replacing existing 80mm AC along Manvila Jn to Nirmalyam road | Water Supply | 0.16 | Work Completed |
| 134 | 6.16. Replacing existing 80mm AC along Manvila tank to Thalavarambu temple road | Water Supply | 0.18 | Work Completed |
| 135 | 18.4 (D) Supplying and Erection of Pumpsets , transformer and electrical accessories in the Kulathur Pumping Station | Sewerage/Septage | 2.49 | Work Completed |
| 136 | 6.15. Replacing existing 50mm GI along Musaliar lane Pettah ward | Water Supply | 0.07 | Work Completed |
| 137 | 6.14. Replacing existing 150mm AC along Arasumoodu to Thippatti temple road | Water Supply | 0.31 | Work Completed |
| 138 | 18.2 (B) Well at Kulathoor | Sewerage/Septage | 4.81 | Work Completed |
| 139 | 6.13. Replacing existing 100mm AC along Rajaji Nagar in Thampanoor ward | Water Supply | 0.46 | Work Completed |
| 140 | 18.1 (A) 350mm DI K9 PM from well at Kulathoor to stilling chamber at Arasumoode | Sewerage/Septage | 1.22 | Work Completed |
| 141 | 10.15 Rehabilitation - Dismantling existing damaged 100mm dia Sw sewer line and laying 200mm dia SW pipe and construction of manholes at Madathuvila Lane Edappazhinji | Sewerage/Septage | 0.02 | Work Completed |
| 142 | 10.14 Rehabilitation - Dismantling of damaged brick manhole and re-constructing with RCC manhole at Lenin Nagar | Sewerage/Septage | 0.07 | Work Completed |
| 143 | 6.12. Replacing existing 110mm PVC along Thilak Nagar Parottukonam | Water Supply | 0.23 | Work Completed |
| 144 | 6.11. Replacing existing 100mm AC along Varambaserri road | Water Supply | 0.83 | Work Completed |
| 145 | 6.10. Replacing existing 150mm AC along Ambalamukku - Oolampara road | Water Supply | 0.62 | Work Completed |
| 146 | 10.13 Rehabilitation - Dismantling of damaged brick manhole and re-constructing with RCC manhole at Kanaka Nagar area under Sewerage Section Sasthamangalam | Sewerage/Septage | 0.06 | Work Completed |
| 147 | 10.12 Rehabilitation - Dismantling of damaged brick manhole and re-constructing with RCC manhole at Jawahar Nagar area under Sewerage Section Sasthamangalam | Sewerage/Septage | 0.07 | Work Completed |
| 148 | 10.11 Rehabilitation - Increasing in size of existing sewer main using 300mm dia SWpipe from Edappazhinji towards CSM Nagar III Reach Ch.817M to 1191m | Sewerage/Septage | 0.67 | Work Completed |
| 149 | 10.10 Rehabilitation -Increasing in size of existing sewer main using 400mm dia RCC NP3 pipe from Edappazhinji towards CSM Nagar II Reach Ch.379M to 817m | Sewerage/Septage | 1.54 | Work Completed |
| 150 | 10.9 Rehabilitation - Increasing the size of existing sewer main using 400mm dia RCC NP3 pipe from Edappazhinji towards CSM Nagar I Reach Ch.0 M to 379m | Sewerage/Septage | 0.93 | Work Completed |
| 151 | 10.8 Rehabilitation --Laying 150mm SW pipe at Aiswarya lane, Poornima lane, Bharath lane, Mythri lane & Kavuvila lane at Sasthamangalam ward under sewerage section Sasthamangalam | Sewerage/Septage | 0.4 | Work Completed |
| 152 | 10.7 Rehabilitation -D Block - Supplying and laying 200 mm dia SW sewer branch line from The Existing MH towards Chalakuzhy - Kappil road | Sewerage/Septage | 0.15 | Work Completed |
| 153 | 10.6 Rehabilitation - Relaying chocked and broken sewer line including construction of man holes from SNRA 88B to SNRA 101 at SN Nager, Pettah and and reconstruction of dilapidated man holes at Ambalathumukku Kaumudhi Resiedents Lane | Sewerage/Septage | 0.11 | Work Completed |
| 154 | 10.5 Rehabilitation - Urgent Re-Laying 200mm SW pipe and construction of manhole near Parthas at Power House Road | Sewerage/Septage | 0.26 | Work Completed |
| 155 | 10.4 Reconstruction of dilapidated man holes at Ambujavilasom, malloor road, Chettikulangara, Athani, Amba nagar, Mullassery, Chirakkulam, Thengapura, Mulluvilakom, Pettah, Rishimangalam, Palkulangara, Chempakassery, Kaithamukku, Pattoor etc under Sewerage Section I, kuriyathy | Sewerage/Septage | 0.34 | Work Completed |
| 156 | 10.3 Rehabilitation - Relaying damaged 300mm sw pipe from Parachal Jn in Malloor road to Devi pharma Junction and construction of dilapidated man holes at Thumbara lane in Vanchiyoor ward | Sewerage/Septage | 0.11 | Work Completed |
| 157 | 10.2 Rehabilitation - Providing 200mm sewer line from VRA B - 26 to VRA A -22 and connectig to the existing MH near Khadi Board, Vanchiyoor | Sewerage/Septage | 0.09 | Work Completed |
| 158 | 8.6 Storm water drainage system for Priyadarshini Nagar in Vallakadavu ward | Drainage | 0.14 | Work Completed |
| 159 | 8.7 Storm water drainage system for Nethaji road in Poojappura ward | Drainage | 0.45 | Work Completed |
| 160 | 8.8 Storm water drainage system for Pulimoodu-Gandhari Amman Kovil road in Thampanoor ward | Drainage | 0.25 | Work Completed |
| 161 | 8.9 Storm water drainage system for Kunnukuzhy-Kannamoola road in Kunnukuzhy ward | Drainage | 1.17 | Work Completed |
| 162 | 8.10 Storm water drainage system for Cherukara Naduthala road in Poojappura ward | Drainage | 0.67 | Work Completed |
| 163 | 8.11 Storm water drainage system for Pattor Jn-EMS Nagar road in Kannammoola ward | Drainage | 0.25 | Work Completed |
| 164 | 8.12 Storm water drainage system for Athani Link road, Chavarachi in Vanchiyoor ward | Drainage | 0.21 | Work Completed |
| 165 | 8.13 Storm water drainage system for Kochar road towards Killipalam in Valiyasala ward | Drainage | 0.2 | Work Completed |
| 166 | 8.14 Storm water drainage system for Kesavadev road to Thrivikramangalam Thamalam Jn in Mudavanmugal ward | Drainage | 0.37 | Work Completed |
| 167 | 8.15 Storm water drainage system for Milk Colony road in Bheemapally East ward | Drainage | 0.61 | Work Completed |
| 168 | 8.16 Storm water drainage system for Vadekkad-Kannammoola Thodu road in Kannammoola ward | Drainage | 0.06 | Work Completed |
| 169 | 8.17 Storm water drainage system for Maruthoor Kadavu towards Elamthengu road Kalady ward | Drainage | 0.42 | Work Completed |
| 170 | 8.18 Storm water drainage system for Soman Nagar Kalady road in Nedumcaud ward | Drainage | 0.81 | Work Completed |
| 171 | 8.19 Storm water drainage system for Valiyathura-Muttathara road-Bheemapally ward | Drainage | 1.42 | Work Completed |
| 172 | 8.20 Storm water drainage system for Kowdiar Tennis Club road in Kowdiar ward | Drainage | 0.59 | Work Completed |
| 173 | 8.21 Storm water drainage system for Kanaka Nagar Nanthancode ward | Drainage | 0.28 | Work Completed |
| 174 | 8.22 Storm water drainage system for PMG to Charachira road in Nanthancode ward | Drainage | 1.13 | Work Completed |
| 175 | 8.23 Construction of Drain in SS Kovil road-LHS in Thampanoor ward | Drainage | 0.67 | Work Completed |
| 176 | 8.24 Construction of Drain in SS Kovil road-RHS in Thampanoor ward | Drainage | 0.62 | Work Completed |
| 177 | 8.25 Construction of Drain in Chettikulangara road in Vanchiyoor ward | Drainage | 0.51 | Work Completed |
| 178 | 10.1 Rehabilitation -Increasing the capacity of sewer 150mm dia SW pipe to 200mm dia SW pipe and construction of RCC manholes at Manacadu Harshan Nagar and Seethapuram lane | Sewerage/Septage | 0.24 | Work Completed |
| 179 | 8.29 Construction of Drain in P D Nagar (from Vidya Gardens) in Vallakadavu ward. | Drainage | 0.09 | Work Completed |
| 180 | 9.14 Laying 250 mm dia DI K9 pumping main from Mudavanmugal Pump House to Jagathy Junction and construction of Stilling Chamber at Jagathy Junction | Sewerage/Septage | 3 | Work Completed |
| 181 | 8.30 Construction of Drain in Shastri Nagar road / Mythodu Kuzhy (Right) in Mudavanmugal ward | Drainage | 0.64 | Work Completed |
| 182 | 8.31 Construction of Drain in Kurattoor road in Mudavanmugal Ward | Drainage | 0.04 | Work Completed |
| 183 | 8.32 Construction of Drain in Golf Link Road in Kowdiar Ward | Drainage | 0.27 | Work Completed |
| 184 | 8.33 Construction of Drain in Chitra Nagar road in Poojappura Ward | Drainage | 0.16 | Work Completed |
| 185 | 8.37 Construction of Drain in AKG Center Kunnukuzhi Road in kannammoola Ward | Drainage | 0.17 | Work Completed |
| 186 | 8.38 Construction of Drain in Arayalor Road in Thirumala Ward | Drainage | 0.48 | Work Completed |
| 187 | 11.5 Construction of Drain in Elangam panayil road in Nedumcaud Ward | Drainage | 0.09 | Work Completed |
| 188 | 9.33 Construction of drain on Oruvakkonam - Kattayikkonam road in Kattaikonam Ward | Drainage | 0.55 | Work Completed |
| 189 | 11.4 Construction of Drain in Green Street road in Poojappura Ward | Drainage | 0.18 | Work Completed |
| 190 | 9.32 Construction of drain on Konchiravila Pulimoottil Kadavu road in Attukal Ward | Drainage | 1.14 | Work Completed |
| 191 | 9.31 Construction of drain on Parayikkadavu Theruvila road in Mudavanmugal Ward | Drainage | 0.21 | Work Completed |
| 192 | 11.3 Construction of Drain in towards Melemukku mailadi kadavu road in valiyasala Ward | Drainage | 0.06 | Work Completed |
| 193 | 9.30 Construction of drain on Moonnammoodu Aruvikkonam road in Kachani Ward | Drainage | 0.49 | Work Completed |
| 194 | 9.29 Construction of drain on Cheenikkonam Maruvathoor road in Nettayam Ward | Drainage | 0.21 | Work Completed |
| 195 | 11.2 Construction of Drain in Kesavan road in poojappura Ward | Drainage | 0.14 | Work Completed |
| 196 | 11.1 Construction of Drain in Quarters to Melarannoor LHS road in Aranoor Ward | Drainage | 0.29 | Work Completed |
| 197 | 10.27 Construction of Drain in Valiyathura - Muttathara road in Vallakadavu Ward | Drainage | 0.47 | Work Completed |
| 198 | 10.26 Construction of Drain in Kulathara Jn Bus stop to Karamana River (parapachivila - Vittiyur Road) in Kalady Ward | Drainage | 1.55 | Work Completed |
| 199 | 9.12 TSS - E Block Zone II - Supplying and laying 300mm dia SW sewer main interconnection between Kootanvila and Chittatinkara sewer main | Sewerage/Septage | 0.07 | Work Completed |
| 200 | 8.5 Storm water drainage system for Govt UPS to Sewage Farm in Bheemapally ward | Drainage | 0.36 | Work Completed |
| 201 | 8.4 torm water drainage system for Thanivilakam Lane Nemam in Ponnumangalam ward | Drainage | 0.12 | Work Completed |
| 202 | 9.11 TSS - E Block Zone III - Supplying and laying 200mm dia SW pipe branch sewer line from the existing Konathukulangara sewer main towards Dwani Lane (PRA lane No. 07) at Maruthankuzhy | Sewerage/Septage | 0.14 | Work Completed |
| 203 | 8.3 Storm water drainage system for Kunnukuzhy colony in Kunnukuzhy ward | Drainage | 0.1 | Work Completed |
| 204 | 8.2 Storm water drainage system for Sub Lane-Gowreeshwapattom road in Kunnukuzhy ward | Drainage | 0.04 | Work Completed |
| 205 | 9.10 TSS - E Block Zone III - Supplying and laying 200mm dia SW pipe branch sewer line from the existing Konathukulangara lane towards Padayani road association lane No. 05 (PRA - 16-20) at Maruthankuzhy | Sewerage/Septage | 0.1 | Work Completed |
| 206 | 9.9 TSS - Supplying and laying 200mm dia SW pipe sewer line from Padayani road Ex MH towards Padayani Gardens Lane No. 8A (PRA G1 to G17) | Sewerage/Septage | 0.17 | Work Completed |
| 207 | 9.8 TSS - E Block Zone III - Supplying and laying 150mm dia SW branch sewer line from the existing MH towards Melekuzhivila at Maruthamkuzhy | Sewerage/Septage | 0.14 | Work Completed |
| 208 | 9.7 Supplying and laying 200mm dia SW sewer line from the existing MH towards Binoy Lane at Kizhakke Pattom Residence Association | Sewerage/Septage | 0.07 | Work Completed |
| 209 | 9.6 TSS - E Block Zone III - Supplying and laying 200mm dia SW pipe branch sewer line from the existing Konathukulangara lane towards Padayani road (PRA - Lane 10) at Maruthankuzhy | Sewerage/Septage | 0.14 | Work Completed |
| 210 | 9.5 TSS - E Block Zone II - Laying 300mm dia SW pipe sewer main from Jagathy Vettamukku sewer main MH 60 towards Koottamvila Ex MH (N-N1) | Sewerage/Septage | 0.19 | Work Completed |
| 211 | 6.9. Replacing existing 80mm AC along Ambalamukku-Mannadi lane | Water Supply | 0.21 | Work Completed |
| 212 | 6.8. Replacing existing 80mm AC along Manvila-Pullukadu-Don Bosco Road | Water Supply | 0.17 | Work Completed |
| 213 | 9.4 TSS - D Block Zone II - Laying 600mm dia RCC NP3 pipe sewer main from Edappazhinji to Chithra Nagar via Vettamukku 2 | Sewerage/Septage | 0.51 | Work Completed |
| 214 | 6.7. Replacing existing 100mm AC along Vayalikkada- Madathunada road | Water Supply | 1.29 | Work Completed |
| 215 | 6.6. Replacing existing 80mm AC along Ambalamukku NCC road | Water Supply | 1.09 | Work Completed |
| 216 | 9.3 TSS - D Block Zone II - Laying 600mm dia RCC NP3 pipe sewer main from Edappazhinji to Chithra Nagar via Vettamukku 1 | Sewerage/Septage | 0.51 | Work Completed |
| 217 | 9.28 Construction of drain on Malamugal Kachani road in Kachani Ward | Drainage | 0.52 | Work Completed |
| 218 | 9.27 Construction of drain on Peoples Lane road in Jagathy Ward | Drainage | 0.56 | Work Completed |
| 219 | 9.26 Construction of drain on Thaliyal Thelungu Chetti Theruvu road in Karamana Ward | Drainage | 0.48 | Work Completed |
| 220 | 9.25 Construction of drain on Mithra Nagar road in Ambalathara Ward | Drainage | 0.38 | Work Completed |
| 221 | 9.24 Construction of drain on Thottam road in Ambalathara Ward | Drainage | 0.29 | Work Completed |
| 222 | 9.23 Construction of drain on Surya Nagar road in Ambalathara Ward | Drainage | 0.24 | Work Completed |
| 223 | 9.21 Construction of drain on Vazhathottam Kayalkara road in Poomkulam Ward | Drainage | 1.23 | Work Completed |
| 224 | 9.20 Construction of drain on Cheriyamuttom road in Poonthura Ward | Drainage | 0.53 | Work Completed |
| 225 | 9.19 Construction of drain on Rajeev Gandhi road in Muttathara Ward | Drainage | 0.45 | Work Completed |
| 226 | 9.18 Construction of drain on Kaarali Mudumbil road in Chakkai Ward | Drainage | 0.07 | Work Completed |
| 227 | 9.17 Construction of drain on Ambalathinkara pazhaya road in Kazhakuttom Ward | Drainage | 0.24 | Work Completed |
| 228 | 9.16 Construction of drain on Ammankovil - Kazhakuttom market road in Kazhakuttom Ward | Drainage | 0.28 | Work Completed |
| 229 | 9.15 Construction of drain on Plavaracodu - Uloorkonnam - Andoorpoyka road in Chanthavila Ward | Drainage | 0.55 | Work Completed |
| 230 | 9.14 Construction of drain near Old National Highway road in Sreekaryam Ward | Drainage | 0.4 | Work Completed |
| 231 | 9.13 Construction of drain on Kalluvila road in Chellamangalam Ward | Drainage | 0.36 | Work Completed |
| 232 | 9.12 Construction of drain on Vattavilakam -Keraladithyapuram road in Chellamangalam Ward | Drainage | 0.51 | Work Completed |
| 233 | 9.11 Construction of drain on Aavukulam - Kallarathala - Valiyavila road in Powdikonam Ward | Drainage | 0.49 | Work Completed |
| 234 | 10.25 Construction of Drain in MLA Road near thrivikramangalam to Thamalam road in Mudavanmugl Ward | Drainage | 1.36 | Work Completed |
| 235 | 10.24 Construction of Drain in Chembaka Nagar area road in Vazhuthacaud Ward | Drainage | 0.34 | Work Completed |
| 236 | 10.23 Construction of Drain in CSM Nagar area Road in Vazhuthacaud Ward | Drainage | 0.46 | Work Completed |
| 237 | 9.10 Construction of drain on Aruvikkarakkonam - Santhipuram road in Njandoorkonam Ward | Drainage | 0.45 | Work Completed |
| 238 | 10.22 Construction of Drain in Althara Temple back side road in Vazhuthacaud Ward | Drainage | 0.08 | Work Completed |
| 239 | 9.9 Construction of drain on Melemcodu road in Mannanthala Ward | Drainage | 0.54 | Work Completed |
| 240 | 10.21 Construction of Drain in Thamburan nagar area road in Vazhuthacaud Ward | Drainage | 0.1 | Work Completed |
| 241 | 9.8 Construction of drain on Kulapparakkonam road in Mannanthala Ward | Drainage | 0.42 | Work Completed |
| 242 | 10.20 Construction of Drain in Thirumala Alapuram Road in Thirumala Ward | Drainage | 0.56 | Work Completed |
| 243 | 9.7 Construction of drain on Chenchery road in Mannanthala Ward | Drainage | 0.48 | Work Completed |
| 244 | 9.6 Construction of drain on Ganga Nagar - Thrimoorthy Nagar road - KBS Line in Kamaleswaram Ward | Drainage | 0.6 | Work Completed |
| 245 | 10.19 Construction of Drain in Keni Road In Muttada Ward | Drainage | 0.4 | Work Completed |
| 246 | 10.18 Construction of Drain in Bilal Road in Vallakadavu Ward | Drainage | 0.12 | Work Completed |
| 247 | 10.17 Construction of Drain in AArattu Road in Vallakadavu Ward | Drainage | 0.36 | Work Completed |
| 248 | 10.16 Construction of Drain in Valayasala DD Office to Santhikavadam ochar road in Valiyasala Ward1 | Drainage | 0.26 | Work Completed |
| 249 | 10.15 Construction of Drain in Jyothipuram railway bridge ujjaini mahakali amman kovil road in Valiyasala Ward | Drainage | 0.19 | Work Completed |
| 250 | 10.14 Construction of Drain in Marappanode Sreebhadra Nagar Road in Chettivilakam Ward | Drainage | 0.3 | Work Completed |
| 251 | 10.13 Construction of Drain in NCC Road in Chettivilaam Ward | Drainage | 0.4 | Work Completed |
| 252 | 10.12 Construction of Drain in Marapalam Gardens Road in Muttada Ward | Drainage | 0.38 | Work Completed |
| 253 | 10.11 Construction of Drain in NS Dippo in Vallaadavu Ward | Drainage | 0.16 | Work Completed |
| 254 | 10.10 Construction of Drain in Thirumala to Mangad Road in Thirumala Ward | Drainage | 0.44 | Work Completed |
| 255 | 10.9Construction of Drain in DPI Road in Thycaud Ward | Drainage | 0.1 | Work Completed |
| 256 | 10.8 Construction of Drain in Vellayani Jn to Ponnumangalam Road in Ponnumangalam Ward | Drainage | 0.65 | Work Completed |
| 257 | 10.7 Construction of Drain in Settlement Colony Road in Ponnumangalam Ward | Drainage | 0.22 | Work Completed |
| 258 | 10.6 Construction of Drain Old Karaykamandapam Pottavila road in Ponnumangalam Ward | Drainage | 0.1 | Work Completed |
| 259 | 10.5 Construction of Drain in Mettukada Killipalam Road in Thycaud Ward | Drainage | 0.08 | Work Completed |
| 260 | 10.4 Construction of Drain Petta Alimukku road in Kannammoola Ward | Drainage | 0.17 | Work Completed |
| 261 | 10.3 Construction of Drain in Vazhavila in Puthenpalli Ward | Drainage | 0.11 | Work Completed |
| 262 | 10.2 Construction of Drain Paruthikuzhi road in Puthenpalli Ward | Drainage | 0.41 | Work Completed |
| 263 | 10.1 Construction of Drain in CV Raman Pillai Road to Panavila Road in Thycaud Ward | Drainage | 0.19 | Work Completed |
| 264 | 9.2 TSS - E Block Zone II - Laying 700mm dia sewer main from Jagathy towards common manhole at Vivekananda Nagar IInd Reach chainage 259m to 512m | Sewerage/Septage | 1 | Work Completed |
| 265 | 9.1 TSS - E Block Zone II - Laying 700mm dia sewer main from Jagathy towards common manhole at Vivekananda Nagar 1st Reach chainage 0m to 259m | Sewerage/Septage | 2.44 | Work Completed |
| 266 | 7.5 Laying sewer network in L block (Edathara) from MH 110 to MH 150 (Package 5) | Sewerage/Septage | 2.44 | Work Completed |
| 267 | 7.4 Sewer network from Pettah Arasumoode junction to MH 7 Edathara pumping station (Package 4) | Sewerage/Septage | 6.41 | Work Completed |
| 268 | 7.3 Laying Transmission Main and sewer network in block L Edathara - collection and conveyance system - Supply and laying trunk main from stilling chamber at Udhaya Garden to MH 89 - Package 3 | Sewerage/Septage | 1.81 | Work Completed |
| 269 | 7.2 Supplying and laying sewer line through Pettah Venpalavattom road, Greenpark road and side of Amayizhanjan thodu and to MH7 Edathara Zone | Sewerage/Septage | 3.7 | Work Completed |
| 270 | 9.5 Construction of drain on Aryankuzhi road in Kamaleswaram Ward | Drainage | 0.4 | Work Completed |
| 271 | 9.1 Thampuranmukku moolavilakam road kannanmoola ward | Drainage | 0.17 | Work Completed |
| 272 | 9.4 Construction of drain on Vayyanmoola Karali road in Chackai Ward | Drainage | 0.82 | Work Completed |
| 273 | 7.1 Laying Trunk Main from stilling chamber at Pulayanarkotta to MH10 of pumping station at Edathara (Part 1) | Sewerage/Septage | 20.68 | Work Completed |
| 274 | 9.2 Construction of drain in manavanagar road in perunthanni ward | Drainage | 0.26 | Work Completed |
| 275 | 9.3 Construction of drain on Sreevaraham Kothalam road in Perunthanni Ward | Drainage | 0.12 | Work Completed |
| 276 | 6.5. Replacing existing 100mm AC along Mosque lane pettah ward | Water Supply | 0.29 | Work Completed |
| 277 | 6.4. Replacing existing 150mm CI along Mulavana Junction- Gowreesapattom, Pottakuzhy | Water Supply | 0.83 | Work Completed |
| 278 | 6.3. Replacing existing 80mm AC along Manvila Ushas Nagar to Chenkodikadu | Water Supply | 0.17 | Work Completed |
| 279 | 6.2. Replacing existing 125mm AC along pipinmoodu-Golflinks road | Water Supply | 0.56 | Work Completed |
| 280 | 6.1. Replacing 100mm AC along Chakkalamukku- Societymukku | Water Supply | 3.95 | Work Completed |
| 281 | 9.1 Construction of Drain on Chattambi Swammi Nagar Road in Perunthanni Ward | Drainage | 0.07 | Work Completed |
| 282 | Providing sewerage facility to newly constructed residential colony at Karimadom - Part ll | Sewerage/Septage | 0.35 | Work Completed |
| 283 | Developing one park, Phase III | Parks | 3 | Work Completed |
| 284 | Multi level Car parking at Medical College (Opposite of Super speciality block) | Urban Transport | 14 | Work Completed |
| 285 | Providing new networks (Sewerage facility in the Kalladimugham Housing Colony) | Sewerage/Septage | 11.86 | Work Completed |
| 286 | Providing mechanical sludge drying unit at Muttathara 107 Mld STP | Sewerage/Septage | 4.2 | Work Completed |
| 287 | Supplying and erection of Pumpsets , Transformer and electrical accessories in the Karimanal Pumping Station | Sewerage/Septage | 1.5 | Work Completed |
| 288 | Supplying and laying 350mm DI K9 pumping main (karimanal pumping station to stilling chamber at bypass junction) | Sewerage/Septage | 0.7 | Work Completed |
| 289 | Construction of Pumping Station at Karimanal ( Block J) | Sewerage/Septage | 3.02 | Work Completed |
| 290 | Supplying and erection of Pumpsets , Transformer and electrical accessories in the Akkulam Pumping Station | Sewerage/Septage | 1.8 | Work Completed |
| 291 | Supplying and laying Transmission Main in Block K | Sewerage/Septage | 6.89 | Work Completed |
| 292 | Supplying and laying 450mm DI K9 pumping main for a length of 1800m (Block K Akkulam pumping station to Pulayanarkotta stilling chamber) | Sewerage/Septage | 3.36 | Work Completed |
| 293 | Construction of Pumping Station at Akkulam( Block K) | Sewerage/Septage | 3.61 | Work Completed |
| 294 | Supplying and erection of pumpsets , transformer and electrical accessories in the Edathara Pumping Station | Sewerage/Septage | 4 | Work Completed |
| 295 | Installing Flow meters | Water Supply | 7.5 | Work Completed |
| 296 | Developing one park- Phase I | Parks | 0.3 | Work Completed |
| 297 | Multi level parking at Corporation premises and Chalai (behind of Putharikandam maithanam and transport depot)- Phase I | Urban Transport | 6.37 | Work Completed |
| 298 | Developing one park- Phase II | Parks | 2.25 | Work Completed |
| 299 | Multi level parking at Corporation premises and Chalai (behind of Putharikandam maithanam and transport depot)- Phase II | Urban Transport | 12.59 | Work Completed |
| 300 | Decentralised sewerage treatment plant at Medical College campus including water recycling - Phase 2 | Sewerage/Septage | 13.85 | Work Completed |
| 301 | Construction of Smart Office in Thiruvananthapuram- Kowdiar, Pongumoodu, Vellayambalam | Water Supply | 1.75 | Work Completed |
| 302 | Construction of new Water Treatment Plant of 75 MLD at Aruvikkara (Phase 2) | Water Supply | 25 | Work Completed |
| 303 | Construction and beautification of Thechanvila Park – Punnakkamugal ward | Parks | 0.3 | Work Completed |
| 304 | Construction of foot path from Vazhuthacaud forest office jn to DPI along the left side of road in Vazhuthacaud ward | Urban Transport | 0.09 | Work Completed |
| 305 | Construction of Drain with covering slab at V K K Nagar Road in Perunthanni ward | Drainage | 0.26 | Work Completed |
| 306 | Construction of Drain with covering slab in Asaan Nagar Road in Muttathara ward | Drainage | 0.09 | Work Completed |
| 307 | Construction of Drain with covering slab in Navodhaya & Pazhanchira Road in Ambalathara ward | Drainage | 0.29 | Work Completed |
| 308 | Construction of Drain with covering slab in Aalukadu-Moonattumukku Road in Manikyavilakom ward | Drainage | 0.16 | Work Completed |
| 309 | Construction of Drain with covering slab at Vazhottukonam Vellekadavu Mankuzhi Road in Vazhottukonam ward | Drainage | 0.59 | Work Completed |
| 310 | Construction of Drain with covering slab in Nalumukku-Chambakada Road in Sreekanteswaram ward | Drainage | 0.19 | Work Completed |
| 311 | Construction of Drain with covering slab in Swathi Nagar Lane in Fort ward | Drainage | 0.28 | Work Completed |
| 312 | Supplying and laying pumping main from Edathara pump house to STP at Muttathara | Sewerage/Septage | 18.43 | Work Completed |
| 313 | Construction of Pump House at Edathara | Sewerage/Septage | 8.21 | Work Completed |
| 314 | Sewerage treatment plant (5 mld) for Medical College Trivandrum - Phase 1 | Sewerage/Septage | 5.31 | Work Completed |
| 315 | Rehabilitation of existing pump and machineries | Sewerage/Septage | 0.38 | Work Completed |
| 316 | Supplying conveying Laying and Jointing 700mm dia RCC NP3 Trunk main-II from Murinjapalam to Kannammoola chainage 952m to 1728m | Sewerage/Septage | 2.27 | Work Completed |
| 317 | Supplying conveying Laying and extending the 900mm DI pumping main from Muttathara sewerage treatment plant and construction of new bridge with pile foundation and allied works | Sewerage/Septage | 3.45 | Work Completed |
| 318 | Construction of new Water Treatment Plant of 75 MLD at Aruvikkara (Phase 1) | Water Supply | 45 | Work Completed |