AMRUT State Wise List of Grounded Projects
S.No. Project Title Project Type Project Cost
(in ₹ Cr.)
Milestone
1 STP Upgradtion Part -1 -Malyana Sewerage/Septage 14.29 Work Completed
2 Providing and fixing of Bulk Water Meters on main water Supply lines Water Supply 2.14 Work Completed
3 Provision of Foot over Bridges along Cart Road & Bye pass (2015-16) Urban Transport 3.64 Work Completed
4 Construction of Major Storm Water Drainage Shimla Drainage 6.04 Work Completed
5 Development of nature Paths in various wards of Shimla City. Parks 0.93 Work Completed
6 Development of New Parks in various wards of Shimla City. Parks 1.07 Work Completed
7 Provision of Pedastal Path in various wards of Shimla City. Urban Transport 0.87 Work Completed
8 Provision of Footover Bridges/Subway in Ward No. 8,12,17,24. Urban Transport 3.61 Work Completed
9 Provision of Parking in Various Wards of Shimla City. Urban Transport 13.92 Work Completed
10 Improvement /Construction of Paths in Various Wards of Shimla City. Urban Transport 5.38 Work Completed
11 Provision & Repair of Storm Water Drains along the Roads in various wards Drainage 2.47 Work Completed
12 Construction of Major Storm Water Drains for various wards of Shimla City. Drainage 5.21 Work Completed
13 Rejuvenation of existing Sewerage Treatment Plants in different location of Shimla City. Sewerage/Septage 30.8 Work Completed
14 Provision of Sewerage Network to Improve the Connectivity in various wards of Shimla City & Replacement of Old Damaged Pipes. Sewerage/Septage 3.2 Work Completed
15 Improvement of Rising Main of Giri Pumping Station of Lift Water Supply Scheme Shimla Town Water Supply 9.64 Work Completed
16 Up-gradation of Pump House, Pumping Machinery at Gumma for Lift Water Supply Scheme Shimla Town. Water Supply 3.37 Work Completed
17 Rehabilitation of Water Supply for Shimla City Water Supply 19.31 Work Completed
18 Supply, erection, testing , commissioning along with operation and maintenance for 3 years of vacuum operated chlorination system near Snowdon pump house. Water Supply 0.45 Work Completed
19 Installation of Filtration plant for purification of water of natural springs at 13 locations Water Supply 0.33 Work Completed
20 Provision of water supply lines, pumping machinery in ward no. 8, 10, 12, 16, 21, 24, 14, 6, Shimla Water Supply 1.35 Work Completed
21 Development of Nature Paths Parks 0.57 Work Completed
22 Development of park near Oakover Ward No. 15-Part 1 Parks 0.96 Work Completed
23 Provision and up gradation of Paths in various wards of city Urban Transport 3.07 Work Completed
24 Provision of Parking at various wards in Shimla City Urban Transport 18.13 Work Completed
25 Construction of Storm Water Drains for the left out areas below Cart Road Drainage 3.08 Work Completed
26 Provision & Repair of Storm Water Drains along the roads and paths in various wards of city. Drainage 3.04 Work Completed
27 Provision of new sewerage pipeline in ward No.17 Sewerage/Septage 0.21 Work Completed
28 Implementation of the sewerage system rehabilitation scheme for the Shimla City Sewerage/Septage 8.46 Work Completed
29 Provision of new sewerage pipeline in various wards of Shimla Sewerage/Septage 1.43 Work Completed
30 Development of New Parks in 25 Wards Parks 0.86 Work Completed
31 Development of Rani Ground Park at Parimahal, Kasumpti Parks 0.07 Work Completed
32 Development and Up gradation of existing parks in 25 wards and Procurement of Playing instruments cum equipments for existing parks in 25 wards Parks 1.19 Work Completed
33 Provision of Foot over Bridges along Cart Road & Bye pass Urban Transport 1.95 Work Completed
34 Provision of Parking at in various wards in Shimla City Urban Transport 4.42 Work Completed
35 Provision & Repair of Storm Water Drains along the roads and paths in various wards of city Drainage 0.5 Work Completed
36 Procurement of Snow Clearing Machine Drainage 0.3 Work Completed
37 Provision of new Sewerage line including STP improvement in various wards of Shimla Sewerage/Septage 5.05 Work Completed
38 Sewerage Connectivity to Kaleston Area Sewerage/Septage 0.8 Work Completed
39 Providing, Supplying, Laying, Lowering Water Supply Pipelines of various sizes at different locations within Shimla City Water Supply 5.63 Work Completed
40 Rejuvenation and Construction of Water Tanks at Different Locations in Shimla City Water Supply 1.11 Work Completed
41 Provision and improvement of sewerage system, sewer line in ward no. 1,4-9,11-13,15-17,19, 21-25 in Shimla as per Estimate Sewerage/Septage 16.85 Work Completed
42 Providing Supplying of Water ATMs at each ward within Shimla City. (34Nos) with 10000 Ltrs Storage Tanks Water Supply 1 Work Completed
43 Providing and Fixing of AMR Ready Water Metering for Domestic and Commercial Water Meters within Shimla City Water Supply 8.26 Work Completed
44 Providing and Replacing of Existing Sluice Valve of Different Diameter within Shimla City Water Supply 2 Work Completed
45 Procurement of Two Hand Hold UL Transonic flow meter Water Supply 0.04 Work Completed
46 Provision of Water Tankers 2 nos 4000 ltrs and 2 nos 8000 ltrs Water Supply 0.67 Work Completed
47 Augmentation of LWSS at Giri, Chair, Ashwai Khad, Gumma, Cherot and Seog Catchment Area Water Supply 20.76 Work Completed