S.No. Project Title Project Type Project Cost
(in ₹ Cr.)
Milestone
1 Provision of Foot-over-Bridge at Sarwari Urban Transport 0.7 Work Completed
2 Provision of Underpass at Bhooti Chowk,Dhalpur Urban Transport 0.7 Work Completed
3 Coverage of 100% Storm Water Drainage along the roads and paths. 2.2 Sector* Drainage 2.41 Work Completed
4 Up gradation Of Civil Structures of 3 Existing STP's Sewerage/Septage 0.03 Work Completed
5 Up gradation of Old Existing Pipeline and construction of RCC Storage Tank of WSS Kullu Town. Water Supply 2.2 Work Completed
6 Provision for setting up of 11 No. water ATM in different ward. Water Supply 0.32 Work Completed
7 Provision of 6(six) decentralized parking facilities and up gradation of 4(four) existing parking. Urban Transport 4.53 Work Completed
8 Redevelopment & up gradation of existing ten(10) parks. Parks 0.95 Work Completed
9 Purchase of Snow/ Debris Clearing Machine Urban Transport 0.17 Work Completed
10 Street infrastructure (Railings, Lampposts and Benches) Urban Transport 1.74 Work Completed
11 Up-gradation and provision of new pedestrian paths Urban Transport 5.3 Work Completed
12 Provision of Foothpath Urban Transport 7.72 Work Completed
13 Rehabilitation and development of 13 Nallahas Drainage 2.87 Work Completed
14 Setting Up Three (3) State of Art Testing Lab setup with Modern Technology Sewerage/Septage 0.3 Work Completed
15 Automation for left out WSS in Kullu Town. Water Supply 0.95 Work Completed
16 Provsion of locking arrangement, fencing, improvement of scourcing arrangement for all 20 nos water storage tank. And Rejuvenation and construction of water tanks, Intakes and providing water filter system to source. Water Supply 0.5 Work Completed
17 Providing and fixing of Water Bulk Meter, Sluice Valves Water Supply 0.1 Work Completed
18 Providing and fixing of Water ATMs including platform and enclosure at left out area of Kullu Town (4 Water ATMs). Water Supply 0.15 Work Completed
19 Providing Sewer line to leftout area. Sewerage/Septage 4.05 Work Completed
20 Improvements of Sludge drying Unit Sewerage/Septage 0.2 Work Completed
21 Redevelopment and up gradation of existing 10 parks. Parks 1 Work Completed
22 Provision of 6 decentralized parking facilities and up gradation of 4 existing parking. Urban Transport 6.14 Work Completed
23 Coverage of 100% Storm Water Drainage along the roads and paths. Drainage 5.99 Work Completed
24 Up gradation pf Civil Structures of 3 Existing STP's Sewerage/Septage 14.04 Work Completed
25 Upgradation of Old pipeline ( Upgrade 4 Km of old main gravity 250mm dia pipeline). Water Supply 1.8 Work Completed
26 Distribution Network Mapping ( GIS based and Online MIS based monitoring system for collection of water supply related revenue). Water Supply 0.4 Work Completed
27 Water ATM ( Provision of Water ATM to increase the Water Revenue) Water Supply 0.14 Work Completed
28 Installation of Water Meter to Every Housholds Water Supply 0.68 Work Completed