| S.No. | Project Title | Project Type | Project Cost (in ₹ Cr.) |
|---|---|---|---|
| 1 | PVC UGD pipeline at Bhagathsingh Colony | Sewerage/Septage | 12.0201 |
| 2 | Interception and diversion arrangements in CRP donka | Sewerage/Septage | 26.7408 |
| 3 | Construction of interception Drain to Mallapukaluva | Sewerage/Septage | 7.8795 |
| 4 | Providing UGD network to housing colonies for weaker sections in Nellore Urban | Sewerage/Septage | 96.1762 |
| 5 | Providing water supply infrastructure to weaker sections in Nellore | Water Supply | 22.9733 |
| 6 | APTIDCO-Providing Water Supply Facilities at Kondlapudi and Venkateshwarapuram in Nellore District | Water Supply | 18.03 |
| 7 | APTIDCO-Providing 3.90 MLD STP at the locations of Akkacheruvupadu-II, Kallurupalli-II & Kondlapudi-II &III at Nellore in Nellore District | Sewerage/Septage | 13.86 |
| 8 | CC Diversion drain from collector bunglow to SS tank | WB Rejuvenation | 2.00 |
| 9 | Strengthening of Padarupalli Cheruvu Bund | WB Rejuvenation | 2.2 |
| 10 | Sewer lines at Muthukur Gate Junction | Sewerage/Septage | 30.0111 |
| 11 | Intercepting Drain and collection well from Bujjamma Revu to porlukatta | Sewerage/Septage | 25.7082 |
| 12 | DWC pipes from Mypadu Road Junction to Vengalreddy Nagar | Sewerage/Septage | 32.415 |
| 13 | SCADA System | Water Supply | 61.0062 |
| 14 | 24X7 Water Supply project | Water Supply | 10.3686 |
| 15 | Interconnections and Missing links in Rural Constituency | Water Supply | 17.9282 |