List of Approved Projects
S.No. Project Title Project Type Project Cost
(in ₹ Cr.)
1 Upgradation of Sewerage works in Chandigarh Sewerage/Septage 7.54
2 Upgradation of Water Supply in Chandigarh Water Supply 16.63
3 Desilting, Rehabilitation and Strengthening of existing sewer line with Structural lining in Chandigarh. Sewerage/Septage 14.12
4 Upgradation of Kajauli Water Works and Rehabilitation of Rising Main in convergence with 24x7 Water Supply Project for PanCity (Chandigarh) Water Supply 27.14
5 STRENGTHENING, PROVIDING AND LAYING OF 250MM (10”) i/d SW PIPE SEWER LINE AT COLONIES IN SECTOR 25, CHANDIGARH Sewerage/Septage 4.61
6 AUGMNENTATION OF SEWERAGE SYSTEM TO RELIEVE THE EXCESSIVE SEWER LOAD ON EXISTING TRUNK MAIN NEAR VILLAGE BURAIL BY PROVIDING ALTERNATE 800MM ID NP-3 PIPELINE AT V3 ROAD ON DIVIDING ROAD SECTOR 44-B/45-A, CHANDIGARH” Sewerage/Septage 2.35
7 Strengthening of Tertiary Treated Water Supply System and Laying of TT water lines in left out areas to supply Tertiary Treated water in Chandigarh Sewerage/Septage 94