| S.No. | Project Title | Project Type | Project Cost (in ₹ Cr.) |
|---|---|---|---|
| 1 | Upgradation of Sewerage works in Chandigarh | Sewerage/Septage | 7.54 |
| 2 | Upgradation of Water Supply in Chandigarh | Water Supply | 16.63 |
| 3 | Desilting, Rehabilitation and Strengthening of existing sewer line with Structural lining in Chandigarh. | Sewerage/Septage | 14.12 |
| 4 | Upgradation of Kajauli Water Works and Rehabilitation of Rising Main in convergence with 24x7 Water Supply Project for PanCity (Chandigarh) | Water Supply | 27.14 |
| 5 | STRENGTHENING, PROVIDING AND LAYING OF 250MM (10”) i/d SW PIPE SEWER LINE AT COLONIES IN SECTOR 25, CHANDIGARH | Sewerage/Septage | 4.61 |
| 6 | AUGMNENTATION OF SEWERAGE SYSTEM TO RELIEVE THE EXCESSIVE SEWER LOAD ON EXISTING TRUNK MAIN NEAR VILLAGE BURAIL BY PROVIDING ALTERNATE 800MM ID NP-3 PIPELINE AT V3 ROAD ON DIVIDING ROAD SECTOR 44-B/45-A, CHANDIGARH” | Sewerage/Septage | 2.35 |
| 7 | Strengthening of Tertiary Treated Water Supply System and Laying of TT water lines in left out areas to supply Tertiary Treated water in Chandigarh | Sewerage/Septage | 94 |